EROSION CONTROL AT GONDANG DAM

Jenis proyek
Slope Protection
Tahun
2023
Lokasi
KARANGANYAR - CENTRAL JAVA - Indonesia
Klien
MINISTRY OF PUBLIC WORKS

Tantangan

The construction of the Gondang Dam resulted in exposed cut slopes. The cut slopes would be exposed to rain or surface flow causing the surface material to be dissipated by the water run-off leading to surface erosion. The slopes need to be protected to ...

Solusi

To mitigate the surface erosion of cut slopes, an Erosion Control System was chosen due to its easy application, permeable material, and competitive price. The material used for this solution is MacMat HS. This solution had been defined as Selimut Pengen...

Hubungi kami

Jika Anda menyetujui Kebijakan Privasi perusahaan dan telah memahami isinya, Pengendali Data menanyakan apakah Anda menyetujui pemrosesan data dengan cara yang ditetapkan dalam kebijakan privasi perusahaan, untuk tujuan pengiriman komunikasi promosi mengenai layanan/kegiatan yang disediakan oleh Pengendali Data. *

Selain itu, Pengendali Data menanyakan apakah Anda memberikan persetujuan untuk pengungkapan data pribadi Anda kepada Afiliasi Maccaferri, serta kemungkinan transfer data ke luar UE yang dapat terjadi akibatnya, untuk tujuan mereka sendiri, termasuk tujuan promosi (pengiriman komunikasi pemasaran) *