Défi

Mundra Special Economic Zone, located in Kutch District of Gujarat, is one of the largest SEZ in India. A ROB was proposed over the railway line that cuts across the connectivity road between Mundra and NH 8A. The approaches of ROB were proposed to be retained by ParaWeb® reinforced soil wall system. However, foundation soil comprising primarily of sandy silt with clay was found to have inadequate load bearing capacity to bear the load of retaining walls. Keeping in mind the high water table and high consolidation settlements, a ground improvement technique was required to improve the bearing capacity of soil, reduce post construction settlement and also facilitate the process of implementation. Thus, considering all these factors, stone column technique with a geosynthetic raft was adopted.

Solution

The stone column technique, also known as vibro-replacement or vibro-displacement, is a ground improvement process where vertical columns of compacted aggregate are formed through the soils to be improved. Primary purpose of soil improvement by stone column technique is to increase the bearing capacity of foundation soil and reduce post construction settlement. Stone column derives its support from lateral resistance provided by the surrounding soil, which is caused by: • bulging of the uncemented stone column under the load. • resistance due to surcharge effect. • bearing support offered by intervening soil. The geosynthetic raft is ParaLink®, which is a monoaxial array of geosynthetic strips having unidirectional strength ranging from 100 to 1350 KN/m. The purpose of providing ParaLink® as basal reinforcement is to ensure proper distribution of the load from the superstructure to the stone columns and reduce differential settlements. Ground Improvement details: The area is recommended to be excavated till the founding level where the stone columns are installed. Stone columns: • South side - entire zone including the reinforced and unreinforced section was improved by stone column technique. • North side - owing to relatively better quality of soil, stone columns were provided only under reinforced soil. ParaLink® was laid throughout the entire zone.

Télécharger
l' Étude de cas

ROB FOR CONNECTIVITY BETWEEN MUNDRA AND NH 8A

Télécharger
ROB FOR CONNECTIVITY BETWEEN MUNDRA AND NH 8A

Nos produits pour
cette Étude de cas

Entrez en contact avec nous

Si vous êtes d'accord avec la Politique de confidentialité de l'entreprise et que vous en avez compris le contenu, le Responsable du traitement vous demande si vous consentez au traitement selon les modalités prévues par la politique de confidentialité de l'entreprise, aux fins de l'envoi de communications promotionnelles relatives aux services/activités proposés par le Responsable du traitement. *

En outre, le Responsable du traitement vous demande si vous consentez à la communication de vos données personnelles aux Sociétés Affiliées Maccaferri, ainsi qu'au transfert hors UE qui pourrait en résulter, aux fins propres de ces dernières, y compris à des fins promotionnelles (envoi de communications marketing) *