Année
2024
Lieu
ANTWERP - ANTWERP - Belgium
Client
Lantis / Texion Geosynthetics NV
Concepteur
Arcadis NV /Lantis

Défi

The Oosterweel Link project is a new 15km-long motorway connection developed by Lantis for completing the Antwerp ring road R1 (Belgium). It is a major project in Belgium and its design started in the 1990s to find a solution to the congestion problems in and around Antwerp. The total estimated cost of the project is approximately €4.5bn. The Antwerp ring road is a key part of the Trans-European

Transport (TEN-T) Core Network.

Maccaferri collaborated with the design and building of the Mechanically Stabilized Earth (MSE) walls with its main product family „Terramesh“. This is a well-known system used in Europe and in the rest of the world to support or enable the construction of infrastructures in tight urban corridors, forming retaining walls, road embankments, wing walls and bridge abutments known as Geosynthetic Reinforced Soil-Integrated Bridge Systems (GRS-IBS).

„Terramesh“ double twist steel wire mesh reinforcements have been used in combination with ParaLink® and Paragrid® geogrids representing an evolution and a significant advantage for both cost-effectiveness and performance. The project includes 15.000 facing sqm of „Terramesh Green®“, 14.000 facing sqm of „Terramesh Mineral® and System® and 5.000 facing sqm of gabion cladding.

Solution

The maximum retaining height of the direct bridge abutment called G03 is 13m with a front inclination of 85°. For the front Terramesh units were used, while for the main reinforcement, ParaLink and Paragrid geogrids were laid with a nominal tensile strength from 150 kN/m up to 700 kN/m. Main challenges have been encountered in the optimization and computation of the materials during the design processes, which have been made with the combined use of LEM, FEM, and BIM technologies, and mainly during installation due to the strict restrictions given by demanding geometry of the facing of the structures provided in the design. The geometry of the constructed structures has been checked with in situ testing, resulting in consistency within the design tolerances with a maximum measured vertical settlement of 160mm.

Télécharger
l' Étude de cas

Télécharger

Nos produits pour
cette Étude de cas

Entrez en contact avec nous

Si vous êtes d'accord avec la Politique de confidentialité de l'entreprise et que vous en avez compris le contenu, le Responsable du traitement vous demande si vous consentez au traitement selon les modalités prévues par la politique de confidentialité de l'entreprise, aux fins de l'envoi de communications promotionnelles relatives aux services/activités proposés par le Responsable du traitement. *

En outre, le Responsable du traitement vous demande si vous consentez à la communication de vos données personnelles aux Sociétés Affiliées Maccaferri, ainsi qu'au transfert hors UE qui pourrait en résulter, aux fins propres de ces dernières, y compris à des fins promotionnelles (envoi de communications marketing) *