Desafio

A new airport was determined to support the initiative to try and unlock tourism and growth in the region. Already a tourist destination, the Shennongjia Nature Reserves are nearby in this highly forested area; UNESCO added Shennongjia to its World Network of Biosphere reserves in 1990. Although construction of any infrastructure in these unspoilt areas is controversial, the overall goal is attracting tourists and improving the local economy in this western area of Hubei Province. Compounding the construction of any infrastructure is that the project site is located high in the mountains (+2,580m above sea level) and would be the highest airport in China outside of the Tibetan plateau. The construction of the flat runway plateau within this mountainous area would require the cut-and-fill of the steep slopes. Retaining structures of over 40m high would be required to minimize the footprint of the construction works. Furthermore, the reforestation and environmental restoration works were an important part of the project.

Solução

The cut-and-fill operations would enable the insertion of the 2,800m runway and airport buildings. To stabilise and reinforce the ‘fill’ (valley) side of the project, soil reinforcement offered the most effective solution: -Use of the ‘cut’ waste material as structural back-fill within the soil reinforcement ‘fill’ walls would minimize the export/import of construction materials -It would minimise the footprint / land-take of the solution compared to traditional earthworks -It would be more cost-effective and with a lower carbon footprint than comparable height traditional retaining structures -It would be a flexible system able to accommodate differential settlements and removes the need for a rigid foundation structure. Maccaferri were approached to assist in the design and supply of the reinforced soil slope on account of their deep experience in these very tall mega-structures. Terramesh® and MacGrid® WG were determined to offer the optimum solution. The reinforced soil wall reached nearly 50m high. In this project, the Terramesh® System was supplemented with MacGrid® WG geogrids

Descarregue
o Caso de Sucesso

NEW AIRPORT IN MOUNTAINOUS REGION

Descarregar
NEW AIRPORT IN MOUNTAINOUS REGION

Os nossos produtos para
esta Caso de Sucesso

Entre em contacto connosco

Se concorda com a Política de Privacidade da empresa e compreendeu o seu conteúdo, o Responsável pelo tratamento pergunta-lhe se consente o tratamento, na forma prevista na política de privacidade da empresa, para o envio de comunicações promocionais relativas aos serviços/atividades disponibilizados pelo Responsável pelo tratamento. *

Além disso, o Responsável pelo tratamento pergunta-lhe se consente a comunicação dos seus dados pessoais às Afiliadas Maccaferri, e a consequente transferência extra-UE que daí possa resultar, para fins próprios destas últimas, incluindo os de natureza promocional (envio de comunicações de marketing) *