Desafio

This project has implied reinforced soil wall design, material supply and installation. The main contractor was Bechtel Enka general partnership. Bechtel Enka joint-venture completed Kosovo’s first two motorways – Route 6 and Route 7. Route 6 Prishtine – Hani i Elezit is an integral part of road corridor which connects capital cities, Prishtine and Skopje (FYR Macedonia). Together these motorways create a transport corridor from Kosovo’s border with Albania, via its capital, to its border with North Macedonia. The walls have been built in a seismic and montainous area for a total of more than 13800 sqm of reinforced soil facing.

Solução

Mainly, seven Paramesh system walls have been built: WL 015, WL 024, WL 060, WR 131, WR 134, WR 139, WR 406. The main products used are Terramesh System 3x2x0.5 and 3x2x1, MacTex H35.1, ParaLink 500, ParaLink 300 and ParaGrid 150. The project included also gabions walls, soil nailing with MacMat and rockfall protection. Most of the walls comprises of box culverts at the bottom for the runoff of water. The maximum height of the reinforced soil walls is nearly 25 meters.

Descarregue
o Caso de Sucesso

KOSOVO MOTORWAY PROJECT

Descarregar
KOSOVO MOTORWAY PROJECT

Os nossos produtos para
esta Caso de Sucesso

Get in touch with us

If you agree with the company's Privacy Policy and understood its content, the Data Controller asks you if you consent to the processing in manner provided in the company's privacy policy for sending promotional communications of the services / activities provided by the Data Controller. *

Furthermore, the Data Controller asks you if you give your consent for the communication of your personal data to the Maccaferri Affiliates, and the consequent extra-EU transfer that may result, for their own purposes, including of a promotional nature (sending marketing communications) *