Desafio

The extension project of the Corniche road in Brazzaville is part of a larger construction contract involving urban developments in the Bacongo and Makélékélé neighborhoods. The extension of the Corniche road to a 2x2 lane configuration covers approximately 5 kilometers between the Djoué Bridge and the Case de Gaulle. The route, on a slope, runs along the Congo River and requires the construction of several support structures. The technical solution specified in the contract was a patterned concrete L-wall with reinforcement of the embankment using geotextile boudins. Maccaferri proposed an alternative solution with a reinforced embankment featuring patterned concrete facing Macres®, which was favored by the company as it met the technical and aesthetic requirements of the project while significantly saving installation time and providing overall cost savings.

Solução

The Paraweb® MD45 geoband reinforcements were used and perfectly adapted to the intermediate material embankments (Type 3 according to NF EN 14475). Depending on the heights and sections, the bands had varying lengths between 4 and 11 meters. At the head of the wall, the presence of a 1.30-meter-deep channel 2 meters from the facing did not allow for the deployment of the upper bands. Therefore, the head scales were connected to a concrete beam poured parallel to the facing using waiting iron bars placed during prefabrication. Fifteen walls, with a total surface area of approximately 6,000 square meters and a maximum height of 8.50 meters, were constructed in six different sectors. The Macres® solution offers several advantages:-Uniformity and flexibility of the structure: The embankment and facing form a homogeneous structure, absorb settlements without damage, and perform well under seismic loads.-Reliability of Paraweb® polymer reinforcements, which are corrosion-resistant and have a lifespan of 120 years.-Speed and ease of execution.-Cost-effective solution due to reduced steel and concrete consumption and a decrease in the number of transportation trips to supply the construction site.

Descarregue
o Caso de Sucesso

CONSTRUCTION DE LA ROUTE DE LA CORNICHE DE BRAZZAVILLE

Descarregar
CONSTRUCTION DE LA ROUTE DE LA CORNICHE DE BRAZZAVILLE

Os nossos produtos para
esta Caso de Sucesso

Entre em contacto connosco

Se concorda com a Política de Privacidade da empresa e compreendeu o seu conteúdo, o Responsável pelo tratamento pergunta-lhe se consente o tratamento, na forma prevista na política de privacidade da empresa, para o envio de comunicações promocionais relativas aos serviços/atividades disponibilizados pelo Responsável pelo tratamento. *

Além disso, o Responsável pelo tratamento pergunta-lhe se consente a comunicação dos seus dados pessoais às Afiliadas Maccaferri, e a consequente transferência extra-UE que daí possa resultar, para fins próprios destas últimas, incluindo os de natureza promocional (envio de comunicações de marketing) *