Casos de sucesso
44 YEAR OLD GABION STRUCTURE
As the cliff was above the normal high tide level, it was considered sufficient to construct a stepped retaining wall from massVisãostar
50 YEAR OLD GABION STRUCTURE, RIVER HUMBER
A ‘half-tide’ gabion wall, 2m high on an 18m wide gabion apron (0.5m thick). The volume of protection was approximately 13,Visãostar
A2 / A282 JUNCTION IMPROVEMENTS
The project team needed a solution that steepened the slope, thereby reducing the land take and saving the hedgerow. The main Contractor on the projecVisãostar
AEROPORTO PLÁCIDO DE CASTRO
Nesta situação fez-se necessário a adoção do geossintético tipo geomembrana para impermeabilização das laterais da pista e também do geocompoVisãostar
AGRIPORT, MAYDON WHARF
A raft foundation of Paralink ™ basal reinforcement was found to be the most cost-effective solution for this problem. Piled foundations would have Visãostar
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
Maccaferri provided support to the project team and proposed the MacWall Landmark segmental reinforced soil wall system. MVisãostar
ALCALDÍA MUNICIPAL DE NOVA INDEPENDÊNCIA
A solução encontrada foi a utilização das geomembranas MacLine®, revestindo todas as superfícies da lagoa de tratamento, formando assim a barreiVisãostar
ALPHAVILLE ANÁPOLIS – PT
A solução que veio atender tanto no quesito econômico quanto técnico, bem como o prazo, foi a utilização de geotêxteis tecidos para separaçãoVisãostar
ALTEAMENTO DE BACIA DE ÁGUA BRUTA
A solução encontrada foi à execução de um muro em Gabião Caixa, nas bordas da lagoa existente. O muro foi impermeabilizado com geomembrana MacLiVisãostar
ALTEAMENTO DE BACIA DE ÁGUA BRUTA
A solução encontrada foi à execução de um muro em Gabião Caixa, nas bordas da lagoa existente. O muro foi impermeabilizado com geomembrana MacLiVisãostar
ALTO COMEDERO – PT
Depois de analisar o projeto, foi feita uma proposta para incorporar as fibras metálicas Wirand® FF1. Estas, permitiram a diminuição da armadura dVisãostar
AMBEV DOMINICANA – PT
Foi construído um muro de contenção em Gabiões Caixa, com extensão de 800m e altura média de 6m, com utilização do geotêxtil MacTex® ao tardVisãostar
AMPLIAÇÃO E MODIFICAÇÃO DA COLETORA ROTA 9 – PT
Para avançar o terreno, era necessário fazer um muro de contenção, o qual devia ser aceito pela Direção Provincial de Vias de Salta. A soluçãoVisãostar
ANGLO AMERICAN – PROJETO BARRO ALTO
A impermeabilização consistiu na utilização de uma geomembrana de polietileno com 1,00mm de espessura que foi submetida a um rigoroso processo de Visãostar
ANGLOAMERICAN – PT
A solução utilizada foi o SteelGrid® HR, o qual é composto pela malha hexagonal de dupla torção, com cabos de aço espaçados no sentido verticaVisãostar
ANTAMINA – PT
Após avalição do local, foi elaborado um estudo que apresentava a construção de um muro em solo reforçado com Terramesh® System, projetados comVisãostar
ARENA CORINTHIANS – PT
Devido as premissas do projeto, a solução Terramesh® System com geogrelhas MacGrid®, foi a melhor solução encontrada, dada a sua viabilidade téVisãostar
ARQUIBANCADA DO CLUBE NACIONAL DE FUTEBOL
Decidiu-se através de uma proposta eficaz da Maccaferri, a opção de uma estrutura de contenção com gabiões caixa, preenchidos com solo e entulhoVisãostar
ARQUIBANCADA DO CLUBE NACIONAL DE FUTEBOL
Decidiu-se através de uma proposta eficaz da Maccaferri, a opção de uma estrutura de contenção com gabiões caixa, preenchidos com solo e entulhoVisãostar
ARTESANO GALLERIA
Os arrimos foram projetados utilizando um sistema de contenção a gravidade em Gabiões. Os muros de divisa arquitetônicos foram definidos com uma eVisãostar
ASTON HOTEL ANYER BREAKWATER STRUCTURE
Breakwater is often constructed out of rocks or concrete, forming a wall or a submerged barrier parallel to the shore. Maccaferri Indonesia proposed tVisãostar
ATERRO SANITÁRIO DE RIO BRANCO
Diante da necessidade de expansão do aterro sanitário, realizaram a implantação de uma nova célula para o mesmo. Esta por sua vez, foi totalmenteVisãostar
ATERRO SANITÁRIO DE RIO BRANCO
Diante da necessidade de expansão do aterro sanitário, realizaram a implantação de uma nova célula para o mesmo. Esta por sua vez, foi totalmenteVisãostar
ATERRO SANITÁRIO DE TIJUQUINHAS
A solução adotada foi um muro de gabião caixa de 3 metros de altura com 468 metros de extensão. Como o solo local é de baixa capacidade de suportVisãostar
ATERRO SANITÁRIO VILLA DOMINICO
Em 2005 iniciou-se a construção do sistema de drenagem que abrangia uma área de 40 hectares, onde foram aplicados 30 drenos superficiais de 100m deVisãostar
ATERRO SOBRE O RIO CORRENTES
Para a contenção das margens utilizou-se o sistema de contenção em solo reforçado Terramesh® System que é composto por reforços em malha hexagVisãostar
ATI PORT EXPANSION
In order to address the challenge of improving the port expansion grounds at the Manila South Harbor, Asian Terminals Inc. (ATI) is implementing a cosVisãostar
AUTOPISTA INTEROCEÁNICA NORTE
Foi realizada a construção de um muro em solo reforçado, onde foi utilizado o Terramesh® System. A importância e particularidade deste projeto seVisãostar
AUTOPISTA INTEROCEÁNICA NORTE
Foi realizada a construção de um muro em solo reforçado, onde foi utilizado o Terramesh® System. A importância e particularidade deste projeto seVisãostar
AUTORIDADE PORTUÁRIA DOMINICANA – PT
Para este projeto, foi realizado uma proposta de um muro de contenção em gabiões caixa com revestimento plástico (PVC) para maior durabilidade, coVisãostar
AUTORIDADE PORTUÁRIA DOMINICANA – PT
Para este projeto, foi realizado uma proposta de um muro de contenção em gabiões caixa com revestimento plástico (PVC) para maior durabilidade, coVisãostar
AVIAR NAVARRO – PT
Para poder satisfazer as necessidades do cliente, necessitou-se 8.700 m² de geomembrana de polietileno de alta densidade de 1 mm de espessura. A obraVisãostar
AVIAR NAVARRO – PT
Para poder satisfazer as necessidades do cliente, necessitou-se 8.700 m² de geomembrana de polietileno de alta densidade de 1 mm de espessura. A obraVisãostar
AZUDES SITIO RAMSAR RÍO DESAGUADERO
To date, two of the six planned weirs have been constructed. For the construction of the curtain, approach works and the dissipation basin, gabion boxVisãostar
BACIA DISSIPADORA RES VITORIA
Com base em dados hidráulicos e geotécnicos, foi adotada uma bacia de dissipação de energia em Gabiões e Colchão Reno®, a fim de reduzir a veloVisãostar
BACIA DISSIPADORA RES VITORIA
Com base em dados hidráulicos e geotécnicos, foi adotada uma bacia de dissipação de energia em Gabiões e Colchão Reno®, a fim de reduzir a veloVisãostar
BARRAGEM CAMPEIRA – CRISTALÂNDIA
Após complexos estudos hidrológicos, a barragem foi redimensionada. O vertedouro teve sua largura aumentada para 125 metros além de ser revestido cVisãostar
BARRAGEM SANTA ANA
O projeto realizado pela Comissão Técnica Mista de Salto Grande em conjunto com a Maccaferri, constituiu-se em um muro de contenção com a extensãVisãostar
BARRAGEM SANTA HELENA
Para solucionar o problema foi realizado um solo grampeado com face verde. O sistema utiliza, basicamente, chumbadores e uma geomanta reforçada, tendVisãostar
BARRAGEM SANTA HELENA
Para solucionar o problema foi realizado um solo grampeado com face verde. O sistema utiliza, basicamente, chumbadores e uma geomanta reforçada, tendVisãostar
BARRAGEM T2 JARDINS NÁPOLE E BOLOGNA
Pensando na rapidez executiva, segurança da obra e viabilidade técnica-econcômica, o projetista optou pelas soluções Maccaferri para reforço de Visãostar
BARRAGEM T2 JARDINS NÁPOLE E BOLOGNA
Pensando na rapidez executiva, segurança da obra e viabilidade técnica-econcômica, o projetista optou pelas soluções Maccaferri para reforço de Visãostar
BARREIRA DINÂMICA CONTRA QUEDA DE ROCHAS RMC 200
Por se tratar de um grande trecho de instabilidade superficial, situado no pé da serra do mar, a melhor opção para a proteção das instalações fVisãostar
BARREIRA DINÂMICA CONTRA QUEDA DE ROCHAS RMC 200
Por se tratar de um grande trecho de instabilidade superficial, situado no pé da serra do mar, a melhor opção para a proteção das instalações fVisãostar
BARREIRAS DINÂMICAS- NUEVA FUERABAMBA
Luego de una exhaustiva evaluación de la información, para el proyecto en mención se diseñó y se proyectó la construcción de barreras dinámicaVisãostar
BAY BRIDGE, CALIFORNIA, 112-FOOT-TALL VEGETATED RSS
Caltrans designed a 112-foot-high reinforced soil slope, sitting on top of a 21-foot-high Terramesh® system mechanically stabilized earth (MSE) wall Visãostar
BE-ANTWERP MALINAS
The construction company firstly layed the ParaLink 950 rolls as indicated by Maccaferri´s technicians to create a stable foundation for the planned Visãostar
BE-MECHELEN R6
The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the CUR normative (Netherlands). Since tVisãostar
BEACH TENNIS
A Maccaferri entrou em conjunto com a construtora Consutec no desenvolvimento da solução. Para esta obra foi elaborado quedas naturais no terreno emVisãostar
BEAVERNETTING EVERTSOORD
The company Texion Geosynthetics NV, partner of Maccaferri for the BeNeLux market, provided full assistance, proposing a solution with the so-called bVisãostar
BELFAST HARBOUR
The works included dregging of the new berth and approaches. This involved the disposal of 500,000m3 of material to sea with trVisãostar
BELFAST HARBOUR
The works included dregging of the new berth and approaches. This involved the disposal of 500,000m3 of material to sea with trVisãostar
BEM BRASIL ALIMENTOS
Foram propostas quatro lagoas de tratamento de efluentes revestidas e impermeabilizadas com a geomembrana MacLine®, garantindo a estanqueidade do sisVisãostar
BEM BRASIL ALIMENTOS – PT
Foram propostas quatro lagoas de tratamento de efluentes revestidas e impermeabilizadas com a geomembrana MacLine®, garantindo a estanqueidade do sisVisãostar
BOB 230KV SWITCHYARD
Maccaferri worked in coordination with Power Engineers to develop a proposal that included drawings, calculations and specifications for the channel aVisãostar
BONHILL, STIRLING ROAD
Maccaferri was approached by Barratt Homes to come up with a suitable solution for the posed site problems. It was agreed that Visãostar
BORDERS RAIL
Maccaferri's gabions were used to support widened cuttings extensively along the 35-mile route which connects Edinburgh to Visãostar
BOSCASTLE FLOOD DEFENCES
To achieve this solution, Halcrow specified a combination of Reno Mattresses and MacMat-R from Maccaferri. Over 7000 sq metres of Maccaferri wire meshVisãostar
BR 101 SUL KM 137
Por sua facilidade de execução e por atender aos requisitos do projeto, foi escolhido como solução a realização de uma contenção a gravidade eVisãostar
BR 101 SUL KM 137
Por sua facilidade de execução e por atender aos requisitos do projeto, foi escolhido como solução a realização de uma contenção a gravidade eVisãostar
BR-116 – PT
A solução foi composta por uma malha de 2,5m de chumbadores de aço CA-50 de 25mm de diâmetro, com comprimento variando entre 8 e 12m, drenos horizVisãostar
BR-282 – PT
Como existiam diversos pontos afetados, (cerca de 80 ocorrências de deslizamentos) e o prazo de execução das obras era de 180 dias, a solução adoVisãostar
BR-381 – PT
Após estudos e verificações técnico-econômicas, a solução mais indicada para resolver o problema erosivo da rodovia, foi a construção de doisVisãostar
BRASAL VEÍCULOS – PT
Visando a otimização da área, foi estabelecida a execução do Terramesh® Verde, que consiste na utilização de painéis de malha hexagonal de duVisãostar
BRAÚNA MINERADORA DE DIAMANTES – PT
A solução foi uma contenção em solo reforçado em Terramesh® Grid, com paramento totalmente vertical com altura de muro de 9,5 metros e geogrelhaVisãostar
BROOMLANDS PRIMARY SCHOOL
Once the overall design had been agreed, Maccaferri was engaged to design, supply and install 8 free standing gabion walls which totalled 78.8m in lenVisãostar
BRUG VAN DEN AZIJN
Two 300 m long reinforced soil ramps up to 10.5 m high were designed by Maccaferri. The system chosen is called MacRes and it is comprised of concreteVisãostar
BUILDING OF THE HEAD OFFICE- GROUPE CHARIER
As part of this project, the company France MACCAFERRI created a facade cladding and a set of free walls in electro-welded gabions. The gabion claddinVisãostar
BUSINESS PARK – PT
A Maccaferri propôs a utilização do geocomposto drenante MacDrain® 2L, que demonstrou várias vantagens. A execução do sistema foi iniciada com Visãostar
BUSINESS PARK – PT
A Maccaferri propôs a utilização do geocomposto drenante MacDrain® 2L, que demonstrou várias vantagens. A execução do sistema foi iniciada com Visãostar
BY PASS DE CERRO NEGRO – PT
Foi recomendado a construção de barreiras dinâmicas de alta resistência. Este sistema é composto por materiais distintos, que, por suas propriedaVisãostar
CÂMARAS FRIAS – FRIGORÍFICO MODELO – PT
Após a realização de cálculos para o dimensionamento do piso, chegou-se a um pavimento com 20cm de espessura com uma dosagem de fibras metálicas Visãostar
CÂMARAS FRIAS – FRIGORÍFICO MODELO – PT
Após a realização de cálculos para o dimensionamento do piso, chegou-se a um pavimento com 20cm de espessura com uma dosagem de fibras metálicas Visãostar
CAMINHO PERILAGO
A solução mais adequada para as necessidades da obra foi o solo reforçado. Foi dimensionado uma estrutura em Terramesh® System, onde o muro constrVisãostar
CANALETAS DE DRENAGEM -AEROPORTO DE CAMPO GRANDE
A Maccaferri foi procurada para propor uma solução hidráulica que fosse de fácil e rápida aplicação, drenante e moldada in loco. Ainda, a propoVisãostar
CANALIZAÇÃO DO CERRO EL BERRINCHE
Después de los estudios realizados se determinó estabilizar el suelo mediante la canalización de aguas subterráneas, canalización de aguas de lluVisãostar
CANALIZAÇÃO DO CERRO EL BERRINCHE
Después de los estudios realizados se determinó estabilizar el suelo mediante la canalización de aguas subterráneas, canalización de aguas de lluVisãostar
CANALIZAÇÃO DO CORREGO LAJEADO – ITAIM PAULISTA
A Secretaria Municipal de Infraestrutura Urbana e Obras (SIURB) projetou uma proteção de margem em Gabiões e a Construtora FBF executou a obra. FoiVisãostar
CANALIZAÇÃO DO CORREGO LAJEADO – ITAIM PAULISTA
A Secretaria Municipal de Infraestrutura Urbana e Obras (SIURB) projetou uma proteção de margem em Gabiões e a Construtora FBF executou a obra. FoiVisãostar
CANALIZAÇÃO DO TRECHO DO CORREGO ITAQUERA
Após vistoria técnica, e feitas as devidas análises, juntamente com a construtora ANP Engenharia, foi possível dimensionar uma proteção das margVisãostar
CANALIZAÇÃO DO TRECHO DO CORREGO ITAQUERA
Após vistoria técnica, e feitas as devidas análises, juntamente com a construtora ANP Engenharia, foi possível dimensionar uma proteção das margVisãostar
CANALIZAÇÃO PROJETO JUBARTE
Através de um sistema de drenagem superficial, o projetista elaborou uma série de canais trapezoidais em Colchão Reno®, para coletar e encaminhar Visãostar
CANALIZAÇÃO PROJETO JUBARTE
Através de um sistema de drenagem superficial, o projetista elaborou uma série de canais trapezoidais em Colchão Reno®, para coletar e encaminhar Visãostar
CANALIZAÇÃO RIO BARTOLO
Re-excavación de la geometría del cauce y revestimiento mediante colchones Reno® de 0.23 m de espesor, con anclajes de gavión cada 20 m transversaVisãostar
CANTERA ZIORDIA
To secure the area, two types of actions were carried out: 1. An active solution to prevent the larger blocks from being mobilised. This system consisVisãostar
CARMEN DE PATAGONES – PT
A estrutura projetada para evacuar o escoamento superficial é do tipo escada de dissipação. A mesma está formada somente por gabiões caixa de 1mVisãostar
CARRETERA DE LA CACHOEIRA
A solução aplicada seria escolhida em função da combinação de uma rápida instalação, proteção imediata contra os processos erosivos, integrVisãostar
CARRETERA PUERTO SUNGARO – PT
Se diseñaron muros de suelo reforzado de diferentes alturas empleando el Sistema Terramesh® Verde. Para el diseño se usó el software MacStars 2000Visãostar
CARRETERA PUERTO SUNGARO – PT
Se diseñaron muros de suelo reforzado de diferentes alturas empleando el Sistema Terramesh® Verde. Para el diseño se usó el software MacStars 2000Visãostar
CASAS BAHIA – PT
Foram previstas várias soluções, onde foram instalados chumbadores ao longo dos taludes inferiores, com a finalidade de estabilizar o maciço. TambVisãostar
CASINO CALAFATE – PT
Foi decidida a construção dessas contenções em muros de gabiões, pois além das questões técnicas e econômicas, o uso dos gabiões ainda resuVisãostar
CATO MANOR PIPELINE & ROAD PROTECTION
Maccaferri Africa /African Gabions was asked to propose a structure that would retain the affected road embankment. The proposed structure was a combiVisãostar
CENTRO DE PESQUISA E INOVAÇÃO
A solução adotada seria responsável tanto pela estabilização superficial do maciço quanto pela proteção superficial da instauração de procesVisãostar
CENTRO DE PESQUISA E INOVAÇÃO
A solução adotada seria responsável tanto pela estabilização superficial do maciço quanto pela proteção superficial da instauração de procesVisãostar
CHOI YING ESTATE DEVELOPMENT
Maccaferri Gabions are cages which are engineered from double twisted hexagonal woven steel wire mesh. Delivered flat-packed, our gabions are assembleVisãostar
CIDADE DE CONCEPCIÓN DEL URUGUAI
A obra de defesa está composta por duas partes: uma área de 1.660 metros de comprimento, com um traçado paralelo às ruas em sentido leste-oeste daVisãostar
CIDADE FEDERACIÓN
Para proteger a região da margem optou-se pela construção de um muro de gabiões e a regularização do talude. Para a zona do aterro de aproximaçVisãostar
CIDADE FEDERACIÓN
Para proteger a região da margem optou-se pela construção de um muro de gabiões e a regularização do talude. Para a zona do aterro de aproximaçVisãostar
CLIPPER WASH BANK PROTECTION
A gabion groyne system was selected to protect the bank from erosion and restore the limits of the bank to its original position. Groynes are finger-lVisãostar
CLOSE ROAD – RIO RUIDOSO CROSSING STRUCTURE
The proposed channel is approximately 28 feet wide and 6 feet tall. The proposed channel sidewalls will be stabilized with gabiVisãostar
CLUBE DE REGATAS BRASIL
Para o caso em questão foi apresentado o Macdrain TD. Além de aumentar a velocidade de execução da obra e reduzir os custos de implantação, o MaVisãostar
CLUBE DE REGATAS BRASIL
Para o caso em questão foi apresentado o Macdrain TD. Além de aumentar a velocidade de execução da obra e reduzir os custos de implantação, o MaVisãostar
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
Existing rubble mound breakwater was planned to be extended towards sea by about 500m using geotextile tubes (MacTube). The purpose was to reduce the Visãostar
COBHAM SERVICES HGV PARKING AREA EXPANSION
The proposal was to increase the HVG parking numbers by 79 new spaces, to the west of the petrol filling station. The proposal Visãostar
COLLEY LANE SOUTHERN ACCESS ROAD
The ParaLink LTPs will transfer loads of the mechanically stabilised earth walls into the pile foundations beneath. The maximum heightVisãostar
COMPANHIA VALE DO RIO DOCE
Foi construída uma estrutura de contenção à gravidade e proteção de margem em gabiões. A estrutura foi dimensionada com altura de 6 m por uma eVisãostar
CONCEPA – BR 290
A solução adotada consiste em um sistema de drenagem formado pelo geocomposto drenante MacDrain® TD associado a um tubo dreno, aplicado na interfacVisãostar
CONCRETAGEM DE DUTO
Através da parceria formada pela OAS, COPPE-UFRJ e Maccaferri, foram realizados testes supervisionados pela Petrobrás, que comprovaram a eficiênciaVisãostar
CONCRETAGEM DE DUTO
Através da parceria formada pela OAS, COPPE-UFRJ e Maccaferri, foram realizados testes supervisionados pela Petrobrás, que comprovaram a eficiênciaVisãostar
CONSTRUCTION DE LA ROUTE DE LA CORNICHE DE BRAZZAVILLE
The Paraweb® MD45 geoband reinforcements were used and perfectly adapted to the intermediate material embankments (Type 3 according to NF EN 14475). Visãostar
CONTENÇÃO A GRAVIDADE DATACENTER SP4 OSASCO
Definiu-se como solução a execução de uma contenção em gabião para estabilização do solo na região com a presença do desnível. A tecnologiVisãostar
CONTENÇÃO A GRAVIDADE DATACENTER SP4 OSASCO
Definiu-se como solução a execução de uma contenção em gabião para estabilização do solo na região com a presença do desnível. A tecnologiVisãostar
CONTENÇÃO À GRAVIDADE NO RIO NEGRO
Dentre as opções de soluções apresentadas, foi adotada para contenção do aterro o muro à gravidade em gabiões. Devido à variação do nível Visãostar
CONTENÇÃO BARRAGEM B5
Neste contexto, surgiu a proposta do Cubimac (Gabião içado) como uma solução inovadora e viável. O projeto desenvolvido pela Projetista foi especVisãostar
CONTENÇÃO DE TALUDES ROCHOSOS EM FERROVIAS
A solução encontrada para eliminação do risco foi a estabilização superficial da encosta, através de chumbadores e tela metálica, dividindo a Visãostar
CONTENÇÃO EM GABIÕES CAIXA RODOVIA BR-010
Recomposição do maciço erodido para recuperação do corpo estradal, suavização dos taludes da antiga jazida, que se encontrava vertical e com inVisãostar
CONTENÇÃO EM SOLO REFORÇADO – AV. INDEPENDENCIA
Elaborada pela consultoria Hidrosan, com o apoio do corpo técnico da Maccaferri, foi projetado uma estrutura em solo reforçado Terramesh® Grid com Visãostar
CONTENÇÃO EM SOLO REFORÇADO – BRITAGEM PRIMÁRIA
A solução foi executar uma contenção em solo reforçado de Terramesh® System associado à geogrelhas MacGrid® WG 150 para reforço no aterro, coVisãostar
CONTENÇÃO EM SOLO REFORÇADO – BRITAGEM PRIMÁRIA
A solução foi executar uma contenção em solo reforçado de Terramesh® System associado à geogrelhas MacGrid® WG 150 para reforço no aterro, coVisãostar
CONTENCIÓN EN SUELO REFORZADO – TRITURADORA PRIM
A solução foi executar uma contenção em solo reforçado de Terramesh® System associado à geogrelhas MacGrid® WG 150 para reforço no aterro, coVisãostar
CONTENCIÓN EN SUELO REFORZADO-AV. INDEPENDENCIA
Elaborada pela consultoria Hidrosan, com o apoio do corpo técnico da Maccaferri, foi projetado uma estrutura em solo reforçado Terramesh® Grid com Visãostar
CONTENCIONES ERS 115 – KM 27 E KM 29
A solução encontrada foi a execução de um muro em solo reforçado com Terramesh® System. Quando atingido o fundo da escavação, iniciou-se a conVisãostar
CONTENÇÕES ERS 115 – KM 27 E KM 29
A solução encontrada foi a execução de um muro em solo reforçado com Terramesh® System. Quando atingido o fundo da escavação, iniciou-se a conVisãostar
CONTROL DE EROSIÓN BARRERA DE RESIDUOS Nº3
Em vista da necessidade de uma solução eficiente e com um excelente suporte técnico, foi escolhida uma solução que envolvia o uso de geomantas MaVisãostar
CONTROL DE EROSIÓN BARRERA DE RESIDUOS Nº3
Em vista da necessidade de uma solução eficiente e com um excelente suporte técnico, foi escolhida uma solução que envolvia o uso de geomantas MaVisãostar
CONTROL DE EROSIÓN Y CONTENCIÓN A LA GRAVEDAD
Estabilização do talude com contenção à gravidade em gabiões, com 5 metros de altura e proteção contra erosão com MacMat® R3. A solução prVisãostar
CONTROLE DE EROSÃO BARRAGEM DE REJEITOS Nº3
Em vista da necessidade de uma solução eficiente e com um excelente suporte técnico, foi escolhida uma solução que envolvia o uso de geomantas MaVisãostar
CONTROLE DE EROSÃO BARRAGEM DE REJEITOS Nº3
Em vista da necessidade de uma solução eficiente e com um excelente suporte técnico, foi escolhida uma solução que envolvia o uso de geomantas MaVisãostar
CONTROLE DE EROSÃO E CONTENÇÃO A GRAVIDADE
Estabilização do talude com contenção à gravidade em gabiões, com 5 metros de altura e proteção contra erosão com MacMat® R3. A solução prVisãostar
CONTROLE DE EROSÃO E CONTENÇÃO A GRAVIDADE
Estabilização do talude com contenção à gravidade em gabiões, com 5 metros de altura e proteção contra erosão com MacMat® R3. A solução prVisãostar
ÇÖPLER GOLD MINE ROCK FALL PROJECT
In accordance with the urgency of the situation, the size of the potentially dangerous rocks on the slope and in line with the technical and economic Visãostar
CÓRREGO DO CAPÃO
Os técnicos da Prefeitura Municipal de Igarapé, optaram por uma ponte mista padrão DEOP/SETOP com longarinas em viga metálica e tabuleiro em lajesVisãostar
CÓRREGO SANEAGO
Depois de elaboradas as devidas análises e considerações informadas pelo cliente, juntamente com a construtora Hábil, foi possível dimensionar umVisãostar
CRECHE HEROÍNAS DO LAR – PT
O sistema de estabilização concebido é composto por uma rede metálica de alta resistência, MacMat® MO 200, solidarizada à cabeça dos Grampos aVisãostar
CRECHE HEROÍNAS DO LAR – PT
O sistema de estabilização concebido é composto por uma rede metálica de alta resistência, MacMat® MO 200, solidarizada à cabeça dos Grampos aVisãostar
DANFOSS FACTORY
Maccaferri were approached by Quattro Consult Limited in July 2021 to propose a suitable high strength geogrid for use as a basVisãostar
DANFOSS FACTORY
Maccaferri were approached by Quattro Consult Limited in July 2021 to propose a suitable high strength geogrid for use as a basVisãostar
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
Maccaferri worked with Wood Patel Engineering to design a hydraulic solution for the microprocessor manufacturer TSMC. To reduce the soil erosion alonVisãostar
DEBRIS FLOW PROTECTION LERINI STREAM
After a fierce challenge against the competitor, Maccaferri Balkans won this project thanks to a mix of high performing technical solutions, cost effeVisãostar
DELTA MARINA GUARDERÍA NÁUTICA – PT
Para acelerar el proceso de consolidación y evitar daños a la infraestructura por asentamientos, se instalaron drenes verticales MacDrain® V. Esta Visãostar
DELTA MARINA GUARDERÍA NÁUTICA – PT
Para acelerar el proceso de consolidación y evitar daños a la infraestructura por asentamientos, se instalaron drenes verticales MacDrain® V. Esta Visãostar
DEPÓSITO DE COMBUSTÍVEL DA MARINHA
Uma parte importante das soluções utilizadas em todo o estado, foram as obras de revestimento e estabilização de encostas com a solução em solo Visãostar
DEPÓSITO DE COMBUSTÍVEL DA MARINHA
Uma parte importante das soluções utilizadas em todo o estado, foram as obras de revestimento e estabilização de encostas com a solução em solo Visãostar
DEPÓSITO DE REJEITOS “EL LIMONAR”
La empresa consultora Mansen+Kuroiwa fue la responsable de la elaboración del proyecto y la empresa contratista ARSAC se encargó de la construcciónVisãostar
DER – SP – PT
A solução adotada foi a substituição dos drenos convencionais pelo sistema de drenagem MacDrain® TD, por ter um método construtivo rápido e de Visãostar
DESIDRATAÇÃO DE LODOS
Incorporou-se um sistema de desidratação de lodos mediante os geotubos MacTube® para fazer uma limpeza inicial de ambas lagoas e funcionar como umVisãostar
DESIDRATAÇÃO DE LODOS
Incorporou-se um sistema de desidratação de lodos mediante os geotubos MacTube® para fazer uma limpeza inicial de ambas lagoas e funcionar como umVisãostar
DESIDRATAÇÃO DE LODOS – COMPANHIA MINEIRA KOLPA
Se decidió realizar el proceso de deshidratación de lodos mediante la instalación de MacTube® de 9.1 m de circunferencia por 15 m de largo, logranVisãostar
DILMUNIA GRAND CANAL & MARINA (DGCM)
The construction of the Dilmunia canal is the object of an international Tender. The tender design for the waterproofing works has been developed by tVisãostar
DIQUES PUEBLO JOVEN CERRO VERDE – PT
Se identificaron las principales quebradas que representaban el mayor peligro para la zona. Se requería una solución rápida y eficiente, por lo queVisãostar
DIQUES PUEBLO JOVEN CERRO VERDE – PT
Se identificaron las principales quebradas que representaban el mayor peligro para la zona. Se requería una solución rápida y eficiente, por lo queVisãostar
DISSIPADORES EM GABIÕES PONTAL SUL
O maior desafio era a elevada vazão dos bueiros, sendo eles: um duplo celular de seção 2,5 x 2,5 m , um tubular de 1,0m e outro de 0,80m de diâmeVisãostar
DISSIPADORES EM GABIÕES PONTAL SUL
O maior desafio era a elevada vazão dos bueiros, sendo eles: um duplo celular de seção 2,5 x 2,5 m , um tubular de 1,0m e outro de 0,80m de diâmeVisãostar
DRENAGEM DE AGUAS – RESIDENCIAL LOS SUEÑOS
Ante dicha necesidad, se optó por la construcción de un dren francés, compuesto por piedra, geotextil y un recubrimiento de malla doble torsión paVisãostar
DRENAGEM DE EDIFICIO COM SUBSOLO
A Maccaferri apresentou um estudo de drenagem (Representação Esquemática). A presença do Macdrain como elemento drenante, alinhado ao preenchimentVisãostar
DRENAGEM DE FLOREIRAS EM JARDIM ELEVADO
As floreiras foram criadas a partir de pequenos muros de alvenaria impermeabilizados por manta asfáltica, assim como o fundo das floreiras e o pátioVisãostar
DRENAGEM DE FLOREIRAS EM JARDIM ELEVADO – PT
As floreiras foram criadas a partir de pequenos muros de alvenaria impermeabilizados por manta asfáltica, assim como o fundo das floreiras e o pátioVisãostar
DRENAGEM DE FLOREIRAS EM JARDIM ELEVADO – PT
As floreiras foram criadas a partir de pequenos muros de alvenaria impermeabilizados por manta asfáltica, assim como o fundo das floreiras e o pátioVisãostar
DRENAGEM DE MURO EM CONCRETO
El dren de grava se reemplazó por el MacDrain® FP, el cual, aportó los siguientes beneficios al proyecto: disminución del tiempo de ejecución delVisãostar
DRENAGEM EM CAMPOS DESPORTIVOS PANAMERICANOS
Menbel S.A solicitó a Maccaferri realizar la propuesta del sistema de drenaje para los campos deportivos con la finalidad de evacuar de manera eficieVisãostar
DRENAGEM EM CAMPOS DESPORTIVOS PANAMERICANOS
Menbel S.A solicitó a Maccaferri realizar la propuesta del sistema de drenaje para los campos deportivos con la finalidad de evacuar de manera eficieVisãostar
DRENAGEM PLUVIAL BR 230 KM 40
Por sua facilidade de execução e por atender aos requisitos do projeto, foi escolhido como solução a realização de uma canaleta retangular e proVisãostar
DRENAGEM PLUVIAL BR 230 KM 40
Por sua facilidade de execução e por atender aos requisitos do projeto, foi escolhido como solução a realização de uma canaleta retangular e proVisãostar
DRENAGEM SUBSUPERFICIAL – RODOVIA PA-287
A solução adotada foi a substituição do dreno convencional (DPS 07) por um sistema formado por geocomposto para drenagem, que é um geossintéticoVisãostar
DRENAGEM SUPERFICIAL – RN 123 FELIPE YOFRE
Se adoptó como solución la ejecución de un sistema de drenaje subsuperficial del tipo trinchera drenante, con MacDrain® TD, ubicados a ambos costaVisãostar
DRENAJE – ESTACIÓN CENTRAL – PT
Los ingenieros de Maccaferri propusieron usar un geosintéticos denominado MacDrain 2L FP, el cual consiste en un geocompuesto de drenaje donde una deVisãostar
ECOVIA BR – 277
Para retificar o problema, optou-se pela execução de uma estrutura de contenção em gabiões que apresentava vantagens econômicas, além de ser umVisãostar
ECOVIA BR – 277 – PT
Para retificar o problema, optou-se pela execução de uma estrutura de contenção em gabiões que apresentava vantagens econômicas, além de ser umVisãostar
ECOVIA BR – 277 – PT
Para retificar o problema, optou-se pela execução de uma estrutura de contenção em gabiões que apresentava vantagens econômicas, além de ser umVisãostar
EDIFÍCIO PROSPERE
A solução adotada para esta obra foi a substituição dos drenos convencionais por um sistema interligado, formado pelos geocompostos drenantes MacDVisãostar
EDIFÍCIO PROSPERE – PT
A solução adotada para esta obra foi a substituição dos drenos convencionais por um sistema interligado, formado pelos geocompostos drenantes MacDVisãostar
EDIFÍCIO VIA BRISA
Foram elaboradas cortinas, colchão e trincheiras drenantes. Na cortina e no colchão drenante, optou-se pela utilização do MacDrain® FP, que cobriVisãostar
EDIFÍCIO VIA BRISA – PT
Foram elaboradas cortinas, colchão e trincheiras drenantes. Na cortina e no colchão drenante, optou-se pela utilização do MacDrain® FP, que cobriVisãostar
ELEGANCE PARK SUL
O projeto original previa a utilização do sistema convencional, entretanto, o sistema de drenagem MacDrain® conseguiu sobressair nos quesitos técnVisãostar
ELEGANCE PARK SUL – PT
O projeto original previa a utilização do sistema convencional, entretanto, o sistema de drenagem MacDrain® conseguiu sobressair nos quesitos técnVisãostar
ELEGANCE PARK SUL – PT
O projeto original previa a utilização do sistema convencional, entretanto, o sistema de drenagem MacDrain® conseguiu sobressair nos quesitos técnVisãostar
ENCABEÇAMENTO DA PONTE SOBRE O RIO JARÚ
Para isso a solução adotada englobou a proteção e contenção dos encabeçamentos da ponte, com a construção de um muro de contenção à gravidVisãostar
ENCABEÇAMENTO DA PONTE SOBRE O RIO JARÚ
Para isso a solução adotada englobou a proteção e contenção dos encabeçamentos da ponte, com a construção de um muro de contenção à gravidVisãostar
EROSÃO BURACÃO II
Para elaboração de uma solução durável, foram feitos complexos estudos hidráulicos e geotécnicos da região. Com base nesses levantamentos, foiVisãostar
EROSÃO BURACÃO II
Para elaboração de uma solução durável, foram feitos complexos estudos hidráulicos e geotécnicos da região. Com base nesses levantamentos, foiVisãostar
EROSÃO VILA FORMOSA
Foram elaborados projetos de engenharia com a aplicação de soluções em gabiões e geossintéticos, com o objetivo de mitigar o processo erosivo seVisãostar
EROSÃO VILA FORMOSA
Foram elaborados projetos de engenharia com a aplicação de soluções em gabiões e geossintéticos, com o objetivo de mitigar o processo erosivo seVisãostar
EROSION CONTROL AGAINST MAMMAL BURROWING
Maccaferri was approached by contractors Crown Services Ltd and asked for advise on a suitable steel wire mesh system that could provide the required Visãostar
EROSION CONTROL AT CISUMDAWU TOLL ROAD-PHASE II-TUNNEL AREA
The inclination of the slopes is 45° degree (V:H = 1:1), referring to Public Works Ministry Specification “Spesifikasi Khusus Interim SKh-1.3.17 PeVisãostar
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
Maccaferri has proposed the erosion control system consisting of rolled erosion control products (RECP)-MacMat R (Steel reinforced synthetic geomat) aVisãostar
ESCADA DISSIPADORA CÓRREGO VACA BRAVA
Após elaboração dos estudos hidrológicos, hidráulicos e geotécnicos do local afetado, foram adotadas soluções em estruturas de contenção e dVisãostar
ESCADA DISSIPADORA CÓRREGO VACA BRAVA
Após elaboração dos estudos hidrológicos, hidráulicos e geotécnicos do local afetado, foram adotadas soluções em estruturas de contenção e dVisãostar
ESCOLA CAMPO ALEGRE
A proposta consistiu em desenvolver uma obra de estabilização de taludes com sistemas de ancoragens e proteção superficial com o MacSteel® associVisãostar
ESCOLA WALDORF
O telhado verde foi projetado em toda a cobertura da escola e foi sustentado em paredes moldadas com um composto de solo aglutinado com baba de cupim Visãostar
ESCOLA WALDORF – PT
O telhado verde foi projetado em toda a cobertura da escola e foi sustentado em paredes moldadas com um composto de solo aglutinado com baba de cupim Visãostar
ESCOLA WALDORF – PT
O telhado verde foi projetado em toda a cobertura da escola e foi sustentado em paredes moldadas com um composto de solo aglutinado com baba de cupim Visãostar
ESTABILIZAÇÃO TRONCAL CENTRAL DEL NORTE
Para solucionar el problema y garantizar nuevamente la seguridad y la estabilidad del talud, Alca Ingenieria buscó apoyo en Maccaferri para buscar unVisãostar
ESTABILIZAÇÃO TRONCAL CENTRAL DEL NORTE
Para solucionar el problema y garantizar nuevamente la seguridad y la estabilidad del talud, Alca Ingenieria buscó apoyo en Maccaferri para buscar unVisãostar
ESTAÇÃO DE TRATAMENTO
Para obter um ótimo armazenamento e evitar a fuga das águas contaminadas, procedemos com a instalação da nossa geomembrana MacLine® SDH, com a quVisãostar
ESTAÇÃO DE TRATAMENTO DE ÁGUAS RESIDUAIS BELLO
Para la construcción de la planta, fue diseñado un sistema de drenaje consistente en geocompuestos sintéticos para drenaje MacDrain® 2R y geotextiVisãostar
ESTAÇÃO DE TRATAMENTO DE ÁGUAS RESIDUAIS BELLO
Para la construcción de la planta, fue diseñado un sistema de drenaje consistente en geocompuestos sintéticos para drenaje MacDrain® 2R y geotextiVisãostar
ESTÁDIO BENTO DE ABREU
Após serem realizados estudos de viabilidade, foi definido que os geocompostos MacDrain® TD são a melhor solução técnica e econômica para a obrVisãostar
ESTÁDIO BENTO DE ABREU – PT
Após serem realizados estudos de viabilidade, foi definido que os geocompostos MacDrain® TD são a melhor solução técnica e econômica para a obrVisãostar
ESTÁDIO DO BAETÃO
Foi realizada no estádio do Baetão a substituição de seu gramado natural utilizando um novo sistema de drenagem com a utilização de geocompostosVisãostar
ESTÁDIO ORLANDO SCARPELLI
Como a reconstrução do sistema de drenagem deveria ser o primeiro trabalho a ser executado, era imprescindível que a solução a ser adotada fosse Visãostar
ESTÁDIO ORLANDO SCARPELLI – PT
Como a reconstrução do sistema de drenagem deveria ser o primeiro trabalho a ser executado, era imprescindível que a solução a ser adotada fosse Visãostar
ESTÁDIO ORLANDO SCARPELLI – PT
Como a reconstrução do sistema de drenagem deveria ser o primeiro trabalho a ser executado, era imprescindível que a solução a ser adotada fosse Visãostar
ESTRADA DA CACHOEIRA
A solução aplicada seria escolhida em função da combinação de uma rápida instalação, proteção imediata contra os processos erosivos, integrVisãostar
ESTRADA DA CACHOEIRA
A solução aplicada seria escolhida em função da combinação de uma rápida instalação, proteção imediata contra os processos erosivos, integrVisãostar
ESTRADA DE ACCESO SANTUARIO SERRA DA PIEDADE
Com o objetivo de evitar o deslocamentos dos blocos foi adotada a solução em STEELGRID HR50 , chumbadores em barra de aço tratada com o diâmetro 2Visãostar
ESTRADA DE ACCESO SANTUARIO SERRA DA PIEDADE
Com o objetivo de evitar o deslocamentos dos blocos foi adotada a solução em STEELGRID HR50 , chumbadores em barra de aço tratada com o diâmetro 2Visãostar
ESTRADA DE FERRO CARAJÁS
A consultoria ASTEP, realizou um estudo de viabilidade para estrutura de contenção em solo reforçado com geogrelhas, a ser construída na LocaçãoVisãostar
ESTRADA DE FERRO CARAJÁS
A consultoria ASTEP, realizou um estudo de viabilidade para estrutura de contenção em solo reforçado com geogrelhas, a ser construída na LocaçãoVisãostar
ESTRADA RJ-153
O projeto de recuperação elaborado pela Geomecânica em parceria com o DER, consistia em uma estrutura em solo reforçado em Terramesh® System, MacVisãostar
ESTRADA RJ-153 – PT
O projeto de recuperação elaborado pela Geomecânica em parceria com o DER, consistia em uma estrutura em solo reforçado em Terramesh® System, MacVisãostar
ESTRADA RJ-153 – PT
O projeto de recuperação elaborado pela Geomecânica em parceria com o DER, consistia em uma estrutura em solo reforçado em Terramesh® System, MacVisãostar
Estrutura de Contenção em Solo Reforçado e Reforço de Talude
O cliente necessitava de uma solução que atendesse aos requisitos técnicos, arquitetônicos e ambientais, através da face verde, podendo assim, trVisãostar
Estruturas de Contenção à Gravidade
Conforme as premissas apresentadas no PRAD fornecido pelo cliente, a melhor solução encontrada dentre as opções do mercado foi a execução de um Visãostar
ESTUÁRIO DO RIO ESMERALDAS – PT
Foi proposto a utilização do Terramesh® System para a execução da plataforma. A estrutura em solo reforçado necessitou de uma altura máxima de Visãostar
EX-MUSEU KUSILLO
A estabilização do setor começou com a modificação geométrica do talude dando a ele um fator de segurança adequado, foram realizadas posteriormVisãostar
EX-MUSEU KUSILLO
A estabilização do setor começou com a modificação geométrica do talude dando a ele um fator de segurança adequado, foram realizadas posteriormVisãostar
EXECUÇÃO DE TRINCHEIRA DRENANTE COM MACDRAIN® TD
A solução adotada para os problemas em questão foi a utilização dos geocompostos MacDrain® TD, dotados de uma bolsa prevista no processo de fabrVisãostar
EXECUÇÃO DE TRINCHEIRA DRENANTE COM MACDRAIN® TD
A solução adotada para os problemas em questão foi a utilização dos geocompostos MacDrain® TD, dotados de uma bolsa prevista no processo de fabrVisãostar
EXPANSÃO DE UNIDADE PRODUTIVA EM LOUVEIRA
Executaram-se sistemas de contenção em solo reforçado com 1 km de extensão e até 20 metros de altura, em linhas retas e curvas, acompanhando sempVisãostar
EXPO HOUSE AT DOHA EXPO 2023
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of geosynthetic products in our portfolio that cVisãostar
EXTENSION OF THE CHANTERAINES PARK
The Conseil Général 92 chose double-twist gabion cages because they allow the filling materials to show through easily. The infill stone chosen comeVisãostar
FÁBRICA DE CARRETAS RANDON
A solução escolhida foi a utilização do sistema Terramesh® System, pois permitia a execução do aterro com a contenção, além de ser uma estruVisãostar
FÁBRICA DE CARRETAS RANDON – PT
A solução escolhida foi a utilização do sistema Terramesh® System, pois permitia a execução do aterro com a contenção, além de ser uma estruVisãostar
FÁBRICA DE CARRETAS RANDON – PT
A solução escolhida foi a utilização do sistema Terramesh® System, pois permitia a execução do aterro com a contenção, além de ser uma estruVisãostar
FARM FRITES – PT
A solução encontrada foi elaborar um pavimento utilizando fibras de aço Wirand® FF3 com espessura de 0,26m numa dosagem de 35 Kg/m³. Desses 26cm Visãostar
FAZENDA TECHO DEL MUNDO
Para a solução do problema, foi proposto a construção de um solo reforçado com o sistema Terramesh® Verde. Felizmente o material de corte cumpriVisãostar
FEDERAL MALL
Se plantea y se construye un muro de suelo reforzado con una longitud de 85 metros lineales y una altura máxima de 12 metros escalonados, esta fue laVisãostar
FERNÃO DIAS KM 18+500
A solução adotada foi a realização de um revestimento simples com SteelGrid® HR 100, para controlar a queda dos pequenos blocos, e nos trechos dVisãostar
FERNÃO DIAS KM 18+500 – PT
A solução adotada foi a realização de um revestimento simples com SteelGrid® HR 100, para controlar a queda dos pequenos blocos, e nos trechos dVisãostar
FERNÃO DIAS KM 18+500 – PT
A solução adotada foi a realização de um revestimento simples com SteelGrid® HR 100, para controlar a queda dos pequenos blocos, e nos trechos dVisãostar
FESTIVAL SUPERMALL MOUND PROMONTORY
After several discussions with FLI engineers, Maccaferri’s robust erosion protection geoblanket (MacMat R) has been approved for the project. DueVisãostar
FLOOD EMERGENCY RESPONSE PROJECT
In May 2019, before the flood reached its peak, the city was able to create flood control barriers using FlexMac DT in multiple strategic locations toVisãostar
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
Maccaferri proposed the use of the MacWall Vertica 4° Segmental Block Retaining Wall System. The 4° batter of this system creVisãostar
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
Maccaferri proposed the use of the MacWall Vertica 4° Segmental Block Retaining Wall System. The 4° batter of this system creVisãostar
FV17 LIAFJELLET-OLVIKVATNET
Maccaferri, in cooperation with its local partner PRETEC AS, proposed an optimized solution to the contractor and the investor, aimed at enhancing theVisãostar
Gabion Defense – Cajuca East Corridor
The Provincial Municipality of Nazca was in charge of the technical file through its technical study department. The hydraulic approach they determineVisãostar
GABION WALLS FOR SAHARA AAMBY VALLEY CITY
A series of self-draining, flexible, eco-friendly Gabion walls have been provided in Sahara Lake City along external/internal roads, mini club area, cVisãostar
GALPÃO LOGÍSTICO
Após avaliação do local e do projeto, foram executados muros à gravidade em gabião caixa, projetados com uma seção máxima de 6,50 metros e extVisãostar
GASDUC III
Foi realizado um estudo da obra, de modo que, a solução em solo reforçado com os elementos Terramesh® System dispostos em faixas de aterro suficieVisãostar
GASDUC III – PT
Foi realizado um estudo da obra, de modo que, a solução em solo reforçado com os elementos Terramesh® System dispostos em faixas de aterro suficieVisãostar
GASDUC III – PT
Foi realizado um estudo da obra, de modo que, a solução em solo reforçado com os elementos Terramesh® System dispostos em faixas de aterro suficieVisãostar
GASODUTO CABIÚNAS (GASDUC III)
Para solucionar o problema, era necessário um material eficiente e de rápida instalação, em substituição à proteção convencional com esteirasVisãostar
GASODUTO CABIÚNAS (GASDUC III) – PT
Para solucionar o problema, era necessário um material eficiente e de rápida instalação, em substituição à proteção convencional com esteirasVisãostar
GASODUTO CABIÚNAS (GASDUC III) – PT
Para solucionar o problema, era necessário um material eficiente e de rápida instalação, em substituição à proteção convencional com esteirasVisãostar
GASODUTO NORTE
Foi projetado para ordenar e controlar o escoamento superficial, uma escada de dissipação. A estrutura da escada foi formada por colchões Reno® deVisãostar
GASODUTO NORTE
Foi projetado para ordenar e controlar o escoamento superficial, uma escada de dissipação. A estrutura da escada foi formada por colchões Reno® deVisãostar
HAROLD COURT EAST REGIONAL SERVICE CENTER
The project was initially designed as a series of 9 ft. tall gravity retaining walls along the steep slope with 10 ft. terraces in between. The challeVisãostar
HASANKEYF ARCHEOPARK PROJECT
The retaining walls, which will reach a height of 27 meters within the scope of the Hasankeyf archeopark project, has been designed with Terramesh SysVisãostar
HELBOR BROOKLIN
A solução para este projeto envolveu a demolição da parede de vedação existente e a instalação de um sistema de drenagem vertical usando o geoVisãostar
HENNEAULAAN ZAVENTEM
Maccaferri´s Corporate Technical Department, in cooperation with the local partner TEXION, has proposed an optimised solution with has supported the Visãostar
HIDRELÉTRICA DE AMOYA
Com a finalidade de proteger o pórtico para cabos no portal do túnel de acesso e garantir a segurança das pessoas que circulam pelo local, a MaccafVisãostar
HIDROELÉCTRICA EL CAFETAL – PT
Para controlar que el material de desprendimientos no golpeara y dañara la tubería, se optó por proteger el talud longitudinalmente con malla de alVisãostar
HIDROELÉTRICA PALO VIEJO
Se decidió implementar una red de malla en doble torsión para controlar la caída de rocas y así evitar daños en el canal. Visãostar
HOSPITAL DO IPASGO
Para evitar qualquer tipo de patologia devido a infiltração de água, foi adotado sistema de drenagem completo, sendo: cortinas drenantes, trincheirVisãostar
HOSPITAL DO IPASGO
Para evitar qualquer tipo de patologia devido a infiltração de água, foi adotado sistema de drenagem completo, sendo: cortinas drenantes, trincheirVisãostar
HOSPITAL DR. PEDRO ELIZALDE – PT
A exigência da construtora DYCASA era que a solução, além de resolver o problema, fosse também esteticamente agradável para a obra. Foi elaboradVisãostar
HUHUGAM HERITAGE CENTER
The aesthetics of gabions were desirable, yet a traditional gabion retaining structure would be very expensive. Therefore Maccaferri suggested the useVisãostar
IGARAPÉ DO SÃO RAIMUNDO – PARQUE RIO NEGRO
O Governo do Amazonas decidiu revitalizar a área, desapropriou os moradores das palafitas e decidiu criar na região uma grande área de lazer, o ParVisãostar
IGARAPÉ DO SÃO RAIMUNDO – PARQUE RIO NEGRO – PT
O Governo do Amazonas decidiu revitalizar a área, desapropriou os moradores das palafitas e decidiu criar na região uma grande área de lazer, o ParVisãostar
IMPERMEABILIZAÇÃO EM ATERRO SANITÁRIO
Para proteger e impermeabilizar el suelo de los lixiviados se utilizó una geomembrana de alta densidad HPDE MacLine® de 1.5 mm de espesor, debido a Visãostar
INSTALAÇÃO MALHA, CHUMBADOR, PASSARELA METÁLICA
El cliente optó por construir un pase peatonal excavando un medio túnel para permitir el tránsito peatonal en épocas de deslizamientos, sin embarVisãostar
INSTALAÇÃO MALHA, CHUMBADOR, PASSARELA METÁLICA
El cliente optó por construir un pase peatonal excavando un medio túnel para permitir el tránsito peatonal en épocas de deslizamientos, sin embarVisãostar
INSTALAÇÃO STEELGRID®
Para controlar la caída de rocas y evitar las paralizaciones de la extracción del mineral, Maccaferri propone un sistema de protección con SteelGriVisãostar
INSTITUTO NACIONAL DE VIAS – INVIAS – PT
Para solucionar el problema y garantizar nuevamente la seguridad y la estabilidad del talud, el Instituto Nacional de Vías ordenó la construcción dVisãostar
INSTITUTO NACIONAL DE VIAS – INVIAS – PT
Para solucionar el problema y garantizar nuevamente la seguridad y la estabilidad del talud, el Instituto Nacional de Vías ordenó la construcción dVisãostar
INVIAS – VIA LA MANSA – PT
Para contrarrestar la caída de bloques se realizaron refuerzos activos en algunas partes del talud, mientras en otras se realizó una limpieza del maVisãostar
INVIAS – VIA LA MANSA – PT
Para contrarrestar la caída de bloques se realizaron refuerzos activos en algunas partes del talud, mientras en otras se realizó una limpieza del maVisãostar
IPO DAM SILT CURTAINS
To address the degradation of the Ipo Dam and mitigate the adverse effects of soil erosion and water contamination, various long-term solutions are beVisãostar
ITUPEVA BUSINESS PARK
A solução mais eficiente quanto aos requisitos de resistência foi encontrada com a utilização do concreto reforçado com fibras metálicas WirandVisãostar
ITUPEVA BUSINESS PARK – PT
A solução mais eficiente quanto aos requisitos de resistência foi encontrada com a utilização do concreto reforçado com fibras metálicas WirandVisãostar
K101 ACESSO 1 HAUL ROAD CERRO VERDE
La empresa consultora Fluor consideró en el proyecto la ejecución de muros de suelo reforzado a base del sistema Terramesh® con geomallas MacGrid®Visãostar
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
Byrne Looby and Partners were engaged by main contractor Siac Ltd, to value engineer the originally designed proposals as detailed on the project drawVisãostar
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
Byrne Looby and Partners were engaged by main contractor Siac Ltd, to value engineer the originally designed proposals as detailed on the project drawVisãostar
KOSOVO MOTORWAY PROJECT
Mainly, seven Paramesh system walls have been built: WL 015, WL 024, WL 060, WR 131, WR 134, WR 139, WR 406. The main products used are Terramesh SystVisãostar
KURINGEN BRIDGE 19
The new bridge in Kuringen is built according to the principle of generic bridges used at various locations along the Albert Canal. The bridge has beeVisãostar
LA PASTINA IMP. EXP. LTDA
A solução adotada foi a utilização da geogrelha MacGrid® WG, que atendeu todos os requisitos necessários para esta aplicação, conforme as espeVisãostar
LA PASTINA IMP. EXP. LTDA – PT
A solução adotada foi a utilização da geogrelha MacGrid® WG, que atendeu todos os requisitos necessários para esta aplicação, conforme as espeVisãostar
LA PASTINA IMP. EXP. LTDA – PT
A solução adotada foi a utilização da geogrelha MacGrid® WG, que atendeu todos os requisitos necessários para esta aplicação, conforme as espeVisãostar
LANPING LEAD-ZINC MINING SANCHONGSHAN DUMP RETAINING WALL PROJECT
According to the geological conditions and engineering requirements of the project, the owner and the design unit comprehensively consider the economyVisãostar
LIEBHERR DO BRASIL – PT
Como complemento ao uso das fibras de aço Wirand® e com o intuito de manter o mesmo nível tecnológico elevado no reforço da base do piso, foram uVisãostar
LIGAÇÃO CAJAZEIRAS V E X
Tal melhoria seria a criação de uma plataforma para a ampliação da via, através da construção de uma estrutura de contenção em solo reforçadVisãostar
LINCOLNSHIRE EFW
Consulting engineers, Arup, devised a two stage system of ground level wet and dry holding lagoons. These were impermeably lineVisãostar
LINCOLNSHIRE EFW
Consulting engineers, Arup, devised a two stage system of ground level wet and dry holding lagoons. These were impermeably lineVisãostar
LINHA FERROVIÁRIA DE SÃO PAULO
Foram instalados chumbadores e placas de ancoragem por toda a encosta, juntamente com redes de alta resistência com a função de proteção superficVisãostar
LINHA FERROVIÁRIA DE SÃO PAULO – PT
Foram instalados chumbadores e placas de ancoragem por toda a encosta, juntamente com redes de alta resistência com a função de proteção superficVisãostar
LISTENING MIRRORS HISTORIC SITE
In the first phase of the project the peninsula housing the Mirrors was cut off to create an island linked to the mainland by a swing footbridge, and Visãostar
LITORAL CALETA OLÍVIA – PT
Optou-se pela solução em gabiões revestidos com PVC, onde a solução consiste em uma base de 3m de altura de enrocamento, que suporta o impacto diVisãostar
LOS PORTALES – PT
Para este problema, a Maccaferri propôs, projetou e construiu uma série de muros de contenção que permitiram interceptar o curso da queda de rochaVisãostar
LOS PORTALES – PT
Para este problema, a Maccaferri propôs, projetou e construiu uma série de muros de contenção que permitiram interceptar o curso da queda de rochaVisãostar
LOSA DE ALMACÉN – OWEN ILLINOIS – PT
La empresa GALLEGOS, CASABONNE, ARANGO, QUESADA INGENIEROS tuvo que tomar una decisión entre que solución usar para satisfacer las necesidades de suVisãostar
LOSA TALLER DE MATENIMIENTO – CHUNGAR – PT
Para obtener un alto rendimiento en la ejecución de la obra y una larga vida útil de la estructura en condición de servicio; se presentó una propuVisãostar
LOSAS ALMACENES KIMBERLY CLARK – PT
La solución planteada de acuerdo a las exigencias del proyecto fue el diseño de una losa de concreto reforzada con fibras de acero Wirand FF1. SegúVisãostar
LÖTZGALERIE
The client chose the most economical system. The Maccaferri RB 3000 safety net with an energy of 3000 kJ and a height of 5 m. It was a great challengeVisãostar
Lower Campbell Repair
The erosion control solution consisted of a six to nine-foot-tall, stair-stepped, gabion wall, with a concrete floor base. MaxTex® H 60.1 iVisãostar
LU-A13 DUDELANGE-BURANGE
The loads applied varied from 26 kN/sqm up to 44 kN/m2 in correspondence of the traffic lanes and 5 kN/sqm for the pedestrian and bicycle path. 4,000Visãostar
LUOYANG FOUR RIVER TONGZHI PROJECT
Maccaferri Gabion + Renomesh solutions improve the overall defense capability of protecting the river bank. Overall consideration of the relationshipVisãostar
M606 MOTORWAY / M62 JUNCTION
Maccaferri’s double twist woven gabions have been used to create an approximately 450m, the combined length of road[1]side retaining wallVisãostar
M606 MOTORWAY / M62 JUNCTION
Maccaferri’s double twist woven gabions have been used to create an approximately 450m, the combined length of road[1]side retaining wallVisãostar
MACFORCE EM BRITADOR PRIMÁRIO, MINA CONSTANCIA
Maccaferri propuso un sistema de rampas a ambos lados de la chancadora, con una estructura de suelo reforzado con el Sistema MacForce®. Se diseñó Visãostar
MacSport AC Monza
Per il rifacimento del campo di allenamento, sono state coinvolte diverse aziende specializzate nel settore delle infrastrutture sportive, tra cui ItaVisãostar
MacSport AC Monza
Per il rifacimento del campo di allenamento, sono state coinvolte diverse aziende specializzate nel settore delle infrastrutture sportive, tra cui ItaVisãostar
MACWALL – RESIDÊNCIA FENTON
Se utilizó el sistema Macwall® para el sostenimiento perimetral e interior de la Residencia. Esta solución fue modelada para cada solicitud cargaVisãostar
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
Constructing a slope protection system along these road sections will promote the road's resiliency and is geared to improve the life and well-beiVisãostar
MANUTENÇÃO PREVENTIVA DA ESTRADA LA PAZ
Foi apresentada a rede de alta resistência para revestimento e controle de queda de rochas, já que era necessário o máximo nível de segurança. NVisãostar
MANUTENÇÃO PREVENTIVA DA ESTRADA LA PAZ
Foi apresentada a rede de alta resistência para revestimento e controle de queda de rochas, já que era necessário o máximo nível de segurança. NVisãostar
Marginal Protection for the Tonameca River
Emergency actions such as dredging and the establishment of temporary embankments were implemented. Subsequently, hydrological and topographic studiesVisãostar
MEERHOUT BRIDGE 34
The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the Belgian Annex. The possibility to moVisãostar
MELHORAMENTO DO ESTADIO MUNICIPAL
Basándose en las intensidades de lluvia según Manual de Carreteras de Chile volúmen 3 es que se determinó usar un diseño que incorpora la utilizaVisãostar
METAL DECK COM FIBRAS DE AÇO WIRAND®
Dentre todas as alternativas estudadas, a ideal foi a execução de um deck metálico onde a armadura prevista para os efeitos de retração e temperaVisãostar
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
The comprehensive solution involved Maccaferri's expertise and a strategic selection of materials to optimize the environmental remediation procesVisãostar
MINA CASA DE PEDRA
A solução técnica contemplava um muro de Terramesh® System associado com camadas reforçadas pelas geogrelhas MacGrid® WG. Devido a rápida execuVisãostar
MINA CASA DE PEDRA – PT
A solução técnica contemplava um muro de Terramesh® System associado com camadas reforçadas pelas geogrelhas MacGrid® WG. Devido a rápida execuVisãostar
MINA OMYA ANDINA S.A. – PT
Para evitar poner en riesgo la seguridad del personal, de los operadores y de los equipos que trabajan en la mina, se realizó una limpieza del materiVisãostar
MINA OMYA ANDINA S.A. – PT
Para evitar poner en riesgo la seguridad del personal, de los operadores y de los equipos que trabajan en la mina, se realizó una limpieza del materiVisãostar
MINE D’OR DU TASIAST MASSIF DE L’ADRAR
The Terramesh® system is a system that combines a gabion facing with a continuous wire mesh reinforcement of the facing. The gabion part ensures a neVisãostar
MINERADORA PLANTA DE BARRO ALTO
Primeiramente, foi feita a remoção de todo o material solto proveniente da ruptura. A posteriori, foi feita a execução do muro à gravidade em gabVisãostar
MINERADORA PLANTA DE BARRO ALTO
Primeiramente, foi feita a remoção de todo o material solto proveniente da ruptura. A posteriori, foi feita a execução do muro à gravidade em gabVisãostar
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
Maccaferri worked in a JV to implement slope stabilization solutions for landslide zone between Km 504.00 to Km 505.00 on NH-58. It included shifting Visãostar
MIXED RSS FOR THE RRESHEN-KALIMASH HIGHWAY
Bechtel-Enka brought in geotechnical specialists, Officine Maccaferri in a partnership arrangement to provide engineering design solutions for the walVisãostar
MONUMENTO LA FIESTA DEL SOL – PT
A organização do CTA, optou pela solução MacWall® por ser uma construção a seco, esteticamente agradável, e não requer mão de obra qualificaVisãostar
MPDFT – BRASÍLIA
A Construtora LDN, visando se resguardar dos possíveis problemas apresentados, convidou a Maccaferri para desenvolver uma solução para drenagem dasVisãostar
MPDFT – BRASÍLIA – PT
A Construtora LDN, visando se resguardar dos possíveis problemas apresentados, convidou a Maccaferri para desenvolver uma solução para drenagem dasVisãostar
MPDFT – BRASÍLIA – PT
A Construtora LDN, visando se resguardar dos possíveis problemas apresentados, convidou a Maccaferri para desenvolver uma solução para drenagem dasVisãostar
MRV ITAPUÂ
A solução apresentada foi a construção de taludes e, aterro e muros de contenção em gabiões para estabilização do solo na região com a preseVisãostar
MRV ITAPUÂ – PT
A solução apresentada foi a construção de taludes e, aterro e muros de contenção em gabiões para estabilização do solo na região com a preseVisãostar
MRV ITAPUÂ – PT
A solução apresentada foi a construção de taludes e, aterro e muros de contenção em gabiões para estabilização do solo na região com a preseVisãostar
MURO CABRA CORRAL – PT
A solução proposta foi a construção de um muro de 1.50m, levando a construção de uma contenção de 9.50m. Para a realização da contenção, fVisãostar
MURO DE ACESSO AO TÚNEL SANTA ROSA – GYM – PT
A estrada do túnel Rimac foi um projeto importante, e sua construção englobava dois túneis longitudinais e dois canais viários lineares cada um, Visãostar
MURO DE ACESSO AO TÚNEL SANTA ROSA – GYM – PT
A estrada do túnel Rimac foi um projeto importante, e sua construção englobava dois túneis longitudinais e dois canais viários lineares cada um, Visãostar
MURO DE CONTENÇÃO COMPER
Os consultores do projeto entraram em contato com a Maccaferri para apoio técnico através da elaboração de um estudo de viabilidade. O cliente optVisãostar
MURO DE CONTENÇÃO COMPER
Os consultores do projeto entraram em contato com a Maccaferri para apoio técnico através da elaboração de um estudo de viabilidade. O cliente optVisãostar
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
Os estudos técnicos realizados apontaram que a melhor solução para o problema apresentado, dentre outras encontradas no mercado, seriam dois muros Visãostar
MURO DE CONTENÇÃO EM ALTOS DE BOULEVARD
Antes de iniciar con la construcción del muro, se debió realizar una sustitución de suelos por un piedraplen, pues la capacidad soportante del mismVisãostar
MURO DE CONTENÇÃO EM LLANO VERDE
Los trabajos consisten en la limpieza y relleno de parte de la cárcava con obras de retención de tierra armada en taludes, nuevo sistema colector deVisãostar
MURO DE CONTENÇÃO EM SOLO REFORÇADO
Por sua facilidade de execução e por atender aos requisitos do projeto, foi escolhido como solução, realizar uma contenção em solo reforçado deVisãostar
MURO DE CONTENÇÃO NO RÍO LAS CAÑAS
Se decide colocar un muro de Gavión® Caja con una sección principal de 6 m de alto y 46 m de largo, en total. Además de una sección en escuadra dVisãostar
MURO DE CONTENÇÃO PARA CONTROLE DE EROSÃO
Para proteger la carretera y evitar hundimientos, el propietario diseñó una solución completa en donde recomendó el recubrimiento de los taludes cVisãostar
MURO DE CONTENÇÃO VILLA TOROGOZ
Fue realizada la construcción de una estructura de contención con gaviones caja para contención del talud y harmonización arquitectónica.Visãostar
MURO DE CONTENÇÃO VILLA TOROGOZ
Fue realizada la construcción de una estructura de contención con gaviones caja para contención del talud y harmonización arquitectónica.Visãostar
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
The constructor together with the external supervision and the SICT residence analysed different alternatives for the required retaining works, and thVisãostar
MURO ITAQUERA
A solução adotada para o caso foi a construção de uma estrutura de contenção em solo reforçado com paramento em blocos de concreto MacWall®, dVisãostar
MURO ITAQUERA – PT
A solução adotada para o caso foi a construção de uma estrutura de contenção em solo reforçado com paramento em blocos de concreto MacWall®, dVisãostar
MURO MACFORCE VIA EVITAMIENTO SUR PIURA – PT
Generar un paso a desnivel con el sistema MacForce® en forma de trébol, este proyecto representó varios retos para la Ingeniería Civil, geotécnicVisãostar
MURO MACWALL® ESTAÇÃO BAYOVAR
Los ingenieros de Maccaferri evaluaron la especificaciones del proyecto y decidieron aplicar las solución de suelo reforzado mediante el sistema MacWVisãostar
MURO PONTE TAPANAL
Se propuso un muro en suelo mecánicamente estabilizado para poder ampliar el ancho de la carretera, el cliente decidio utilizar Terramesh® System paVisãostar
MURO PONTE TAPANAL
Se propuso un muro en suelo mecánicamente estabilizado para poder ampliar el ancho de la carretera, el cliente decidio utilizar Terramesh® System paVisãostar
MURO TERRAMESH SYSTEM ACESSO VARIANTE 32
La empresa JACOBS dentro de la ingeniería del proyecto, consideró una estructura en suelo reforzado con el sistema Terramesh® System junto con una Visãostar
MURO TM VALLE DE ANGELES – PT
Fue evaluado que era necesaria la construcción de una estructura de contención en suelo reforzado mista en Terramesh® Verde de aproximadamente 2 meVisãostar
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of products in our portfolio that can achieve thVisãostar
NEW AIRPORT IN MOUNTAINOUS REGION
The cut-and-fill operations would enable the insertion of the 2,800m runway and airport buildings. To stabilise and reinforce the ‘fill’ (valley) Visãostar
NEW ASDA STORE
The chosen solution was the MacWall Diamond dry build a segmental block retaining wall system due to its rapid speed of construction, flexibility and Visãostar
NEW SHARJAH-KHORFAKKAN ROAD
From the previous successful experience of Terramesh system walls, the consultant approached Maccaferri Middle East to propose Terramesh MSE walls as Visãostar
NEWHURST ENERGY FROM WASTE FACILITY
Maccaferri proposed the use of its Macline GCL W20 to impermeably line the attenuation pond and this was accepted by client HitVisãostar
NORTH WALES COASTROAD (A55)
Where the alluvial clay was at its shallowest, after having removed the refuse, a separator geotextile was placed to provide a Visãostar
NOVA FABRICA GRUPO VOLVO
Para solucionar o problema, foi proposto a utilização de um geossintético que atuaria como elemento de reforço e separação entre a camada de solVisãostar
NOVA SUBIDA DA SERRA – BR-040
A solução foi a execução de um muro em solo reforçado em Terramesh® Grid (elementos Terramesh® associados à geogrelhas), aplicando tirantes emVisãostar
NTPC SIDING-GADARWARA PROJECT– BLANKET THICKNESS REDUCTION
Use of geosynthetics solution improves the performance of formation layer, which plays an important role for good performance of track. Also, it helpsVisãostar
OOSTERWEEL VERBINDING -LINKEROEVER, BFL03
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aVisãostar
OOSTERWEEL VERBINDING -LINKEROEVER, G17
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aVisãostar
OOSTERWEEL VERBINDING -LINKEROEVER, K13+G16
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aVisãostar
ORLA DO PORTO
Definiu-se como solução a execução de duas contenções em gabiões, a primeira próximo as margens do Rio Cuiabá, contemplando a utilização deVisãostar
ORLA DO PORTO – PT
Definiu-se como solução a execução de duas contenções em gabiões, a primeira próximo as margens do Rio Cuiabá, contemplando a utilização deVisãostar
ORLA DO PORTO – PT
Definiu-se como solução a execução de duas contenções em gabiões, a primeira próximo as margens do Rio Cuiabá, contemplando a utilização deVisãostar
PAE LOCAÇÃO PETROLEIRA – PT
Optou-se por aumentar a altura do muro em gabiões existente com a finalidade de conformar o talude com uma inclinação mais suave. Como medida princVisãostar
PAE LOCAÇÃO PETROLEIRA – PT
Optou-se por aumentar a altura do muro em gabiões existente com a finalidade de conformar o talude com uma inclinação mais suave. Como medida princVisãostar
PAN AMERICAN ENERGY – PT
Para solucionar ambos problemas, realizaram-se dois tipos de trabalho: Primeiro, a parte superior do talude a fim de impedir a formação de sulcos e Visãostar
PARAMESH WALL FOR BAJO – MALAWATAR ROAD SEGMENT
The Retaining Wall Structure for Bajo – Malawatar Road Segment is constructed using Paramesh System with a height of 8.5m, consisting of a TerrameshVisãostar
PARQUE DAS ÁGUAS
A solução adotada foi a realização de um solo grampeado verde, com face flexível em geomanta reforçada MacMat R®, responsável pela proteção Visãostar
PARQUE DAS ÁGUAS – PT
A solução adotada foi a realização de um solo grampeado verde, com face flexível em geomanta reforçada MacMat R®, responsável pela proteção Visãostar
PASEO DE LAS FLORES – PT
O muro foi projetado com Terramesh® System e MacWall®. A tarefa dos trabalhadores foi de colocar os blocos, preenchê-los com geotêxtil e brita no Visãostar
PASSAGEM INFERIOR DA RODOVIA BR-101 EM ESCADA
Foi realizado um projeto de contenção e verticalização do aterro de encontro, utilizando osistema de solo reforçado com muro Terramesh System. A Visãostar
PEACE BRIDGE
A 40m long,8m high Green Terramesh® reinforced soil abutment wall to surround and support the high-level bridge bank seat and integrate seamlessly wiVisãostar
Perilago Path – Reconstruction of Route 82
The most adequate solution for the needs of the work was the reinforced soil. The structure was designed with TerraMesh™ System, the built wall has Visãostar
PESQUEIRA CORDONE
Para a realização do canal de adução de água, que teria função de abastecer o tanque de criação de camarões, seria necessário o seu revestiVisãostar
PISTA DE ATLETISMO DO CE.N.A.R.D. – PT
A solução adotada baseou-se na execução de trincheiras drenantes constituídas por geocompostos MacDrain®, associadas à tVisãostar
PLACA DE CONCRETO LOJAS CORMIN
Os materiais usados deveriam cumprir com altos padrões de qualidade de resistência e durabilidade. Por esta razão, foi decidido utilizar um concretVisãostar
PLANTA DE PROCESSOS TAMBOMAYO
La solución propuesta por el consultor fue construir sistemas de suelo reforzado para generar las plataformas. Fueran hechos muros utilizando TerrameVisãostar
POÇO CAÑAGUATE 1
Para se realizar a proteção do local, se fez necessária a contratação da empresa Bioforestal Colombia Ltda, especializada em projetos de refloresVisãostar
PODLJUBELJ ROCKFALL PROTECTION
MACCAFERRI engineers inspected the site just after the rockfall event to assess and evaluate the scale of the problem and the boundary conditions. MAVisãostar
POLIPISO DO BRASIL LTDA
Após uma avaliação técnico-econômica das soluções idealizadas, concluiu-se que a utilização das fibras de aço Wirand® para o reforço de coVisãostar
POLIPISO DO BRASIL LTDA – PT
Após uma avaliação técnico-econômica das soluções idealizadas, concluiu-se que a utilização das fibras de aço Wirand® para o reforço de coVisãostar
POLIPISO DO BRASIL LTDA – PT
Após uma avaliação técnico-econômica das soluções idealizadas, concluiu-se que a utilização das fibras de aço Wirand® para o reforço de coVisãostar
PONTE LOROMAYO KM 302
Para solucionar esse problema, a CONIRSA solicitou à Maccaferri uma alternativa de um muro de solo reforçado que permitiria a execução de uma platVisãostar
PONTE LOROMAYO KM 302
Para solucionar esse problema, a CONIRSA solicitou à Maccaferri uma alternativa de um muro de solo reforçado que permitiria a execução de uma platVisãostar
PONTES TRILLIZOS
A solução ao problema consistiu na utilização do MacMat® R, para proteger os taludes de alta inclinação e com solos suscetíveis a processos deVisãostar
PONTES TRILLIZOS
A solução ao problema consistiu na utilização do MacMat® R, para proteger os taludes de alta inclinação e com solos suscetíveis a processos deVisãostar
PORTO SUDESTE
Primeiramente foi realizado um mapeamento geomecânico do maciço. Esse sistema possibilitou um estudo criterioso do maciço. Sendo assim, para estabiVisãostar
PREFEITURA MUNICIPAL DE NOVA INDEPENDÊNCIA
A solução encontrada foi a utilização das geomembranas MacLine®, revestindo todas as superfícies da lagoa de tratamento, formando assim a barreiVisãostar
PREFEITURA MUNICIPAL DE NOVA INDEPENDÊNCIA
A solução encontrada foi a utilização das geomembranas MacLine®, revestindo todas as superfícies da lagoa de tratamento, formando assim a barreiVisãostar
PRESA FRANCISCO ABELLÁN
To protect users and maintenance personnel from possible landslides, a specific solution has been chosen for each situation.To ensure the stability ofVisãostar
PRESTONS ROAD FLYOVER
The avoidance of surcharge on the tunnel and the potential for differential movement were resolved by supporting the approach rVisãostar
PROJETO BLUE MALL
Para este projeto, foi recomendado canalizar as águas da chuva presentes nas áreas circundantes à edificação. Foi aplicado o geocomposto drenanteVisãostar
PROJETO LAS MARGARITAS
Para reduzir os efeitos ocasionados nesse projeto, foi feita uma proposta de contenção com geogrelha MacGrid® WG e geotêxtil MacTex®, para a criaVisãostar
PROJETO PRICE SMART
Para a contenção do aterro, utilizou-se uma estrutura de solo reforçado em Terramesh® System de 280m de extensão e alturas variando de 10 à 12,5Visãostar
PROJETO PRICE SMART
Para a contenção do aterro, utilizou-se uma estrutura de solo reforçado em Terramesh® System de 280m de extensão e alturas variando de 10 à 12,5Visãostar
PROJETO TAMBOMAYO
Se presentó la propuesta de Aditivo Acelerante Libre de Álcalis MacFree AF, un aditivo de última generación que no es nocivo para la salud del traVisãostar
PROJETO RAMAL FERROVIÁRIO CARAJAS
A solução proposta para a grande encosta foi a execução de retaludamento com a inserção de uma estrutura de solo reforçado em Terramesh® SysteVisãostar
PROJETO RAMAL FERROVIÁRIO CARAJAS – PT
A solução proposta para a grande encosta foi a execução de retaludamento com a inserção de uma estrutura de solo reforçado em Terramesh® SysteVisãostar
PROTEÇÃO CASA DE MÁQUINAS RENACE III
Se realizó un análisis del local y a partir de un estudio anterior realizado por la Cobra Infraestructuras Hidráulicas, se determinó que la soluciVisãostar
PROTEÇÃO COSTEIRA COM GABIÕES
Para proteção e controle da erosão foi utilizado contenção em Gabião tipo Caixa PoliMac™ aliado a Colchão Reno® PoliMac™, utilizado nas saVisãostar
PROTEÇÃO COSTEIRA CORINTO – NICARAGUA
La propuesta Maccaferri fue crear una estructura de protección longitudinal a la costa con MacTube® P13XL20, estas estructuras serían contínuas a Visãostar
PROTEÇÃO COSTEIRA CORINTO – NICARAGUA
La propuesta Maccaferri fue crear una estructura de protección longitudinal a la costa con MacTube® P13XL20, estas estructuras serían contínuas a Visãostar
PROTEÇÃO DE BASE DE PONTE XALTAYÁ
Como sistema de protección de margen fue propuesta la aplicación de Gaviones tipo Caja y Colchones® Reno. Estos, recubiertos en PVC debido a que ibVisãostar
PROTEÇÃO DE MARGEM DO RIO HUALLAGA – JUANJUI
Debido a la velocidad que presenta el Río Huallaga en sus máximas crecientes (1.52 m/s) y sobre todo a la gran cantidad de material que arrastra, erVisãostar
PROTEÇÃO DE MARGEM PONTE SOBRE RIO MACACO
Foram adotadas como solução as proteções de margem em Gabiões, que além de oferecerem a proteção contra erosão hidráulica necessária, tem cVisãostar
PROTEÇÃO DE MARGEM PONTE SOBRE RIO MACACO
Foram adotadas como solução as proteções de margem em Gabiões, que além de oferecerem a proteção contra erosão hidráulica necessária, tem cVisãostar
PROTEÇÃO DE MARGEM RIO HUALLAGA – BELLAVISTA
Se ejecutó la construcción de 1580 metros lineales de enrocado total, tanto base como muro enrocado; 340 metros lineales más en muro piramidal de gVisãostar
PROTEÇÃO DE MARGEM RIO HUALLAGA – BELLAVISTA
Se ejecutó la construcción de 1580 metros lineales de enrocado total, tanto base como muro enrocado; 340 metros lineales más en muro piramidal de gVisãostar
PROTEÇÃO DE MARGEM RIO HUALLAGA – PICOTA
La Tabacalera “Villa Toscano” presentaba un problema de pérdida de cultivos debido a la creciente del río Huallaga por lo cual solicitó ayuda aVisãostar
PROTEÇÃO DE MARGEM RIO PINHEIROS
Foi fundado o programa Novo Rio Pinheiros com o objetivo de revitalizar este importante curso d’água através da ação de diversos órgãos públiVisãostar
PROTEÇÃO DE MARGEM IGARAPÉ DE SÃO RAIMUNDO
A solução adotada para revestimento das margens foi o colchão Reno®, por sua agilidade executiva e custo final da obra.Visãostar
PROTEÇÃO DE MARGEM – ANTAPARCO
El municipio de San Antonio de Antaparco con el apoyo financiero del Fondo Italo Peruano buscaban una solución que permitiese fijar el curso del ríoVisãostar
PROTEÇÃO DE TALUDE NA PONTE XALTAYA
Fue necesario el revestimiento del talud con SteelGrid® HR 30, que fue anclado con pernos de 9m de profundidad. De esta forma, fue posible contener qVisãostar
PROTEÇÃO DE TALUDE NA PONTE XALTAYA
Fue necesario el revestimiento del talud con SteelGrid® HR 30, que fue anclado con pernos de 9m de profundidad. De esta forma, fue posible contener qVisãostar
PROTEÇÃO DE TALUDE SANTA ELENA
Se ha brindado un revestimiento con malla con geomanta para controlar la erosión que el talud pueda presentar y a su vez ha sido utilizado anclajes tVisãostar
PROTEÇÃO DE TUBULAÇAO – CÓRREGO DAS ANTAS
Em tempo, a Saneago (órgão responsável pela área de saneamento do estado), interveio no local projetando um muro em gabião, que funcionou como prVisãostar
PROTEÇÃO DE TUBULAÇÃO PRINCIPAL PETOA
Se determinarón las características fluviales del río Cacaulapa y su influencia en el sector de la comunidad que adolece de protección natural porVisãostar
PROTEÇÃO DE TUBULAÇÃO PRINCIPAL PETOA
Se determinarón las características fluviales del río Cacaulapa y su influencia en el sector de la comunidad que adolece de protección natural porVisãostar
PROTECCIÓN CONTRA CAÍDA DE ROCAS EN ALHABIA
In order to guarantee road safety on the road, emergency work was carried out and awarded to the company Seanto. The work consisted of the following aVisãostar
PROTECTION OF PROMENADE DES ANGLAIS IN NICE
The Nice-Côte-d’Azur municipality decided to install an anti-incursion barrier on the Promenade des Anglais to guarantee the safety of pedestrians.Visãostar
QUEDA DE BARREIRA BR-376, KM 669
Diante do problema, a Maccaferri procurou em seu portfólio, soluções que pudessem iniciar a execução de imediato e entregar a obra num curto espaVisãostar
QUEDA DE BARREIRA BR-376, KM 669
Diante do problema, a Maccaferri procurou em seu portfólio, soluções que pudessem iniciar a execução de imediato e entregar a obra num curto espaVisãostar
QUEDA DE ROCHAS – BOULEVARD MONS. ROMERO
Para proteger al tránsito vehicular de cualquier desprendimiento que se pudieran dar en los taludes, se optó por utilizar malla de alta resistencia.Visãostar
RAILWAY EMBANKMENT BURROWING PREVENTION
Maccaferri’s Anti-Burrowing Mesh has been proven to be a strong rodent deterrent. Unlike any plastic grids or thin rabbit netVisãostar
RECRESCIMENTO DE BARRAGEM DE REJEITO
Minera el Roble contácto al consultor Geoservice Ingeniería SAC de Perú, donde Maccaferri apoyó en el diseño de este recrecimiento para la presa Visãostar
RECRESCIMENTO DE BARRAGEM DE REJEITO
Minera el Roble contácto al consultor Geoservice Ingeniería SAC de Perú, donde Maccaferri apoyó en el diseño de este recrecimiento para la presa Visãostar
RECUPERAÇÃO – MARGEM DO CÓRREGO PROSA
Com a ruptura do muro e formação da erosão no aterro, uma das pistas marginais ao córrego ficou comprometida, exigindo rápida intervenção. O coVisãostar
RECUPERAÇÃO DA LAGOA CATARINA
Foi realizada uma impermeabilização com a geomembrana MacLine®, onde foi possível controlar a perda de água nos tempos de estiagem e estabilizarVisãostar
RECUPERAÇÃO DA LAGOA CATARINA
Foi realizada uma impermeabilização com a geomembrana MacLine®, onde foi possível controlar a perda de água nos tempos de estiagem e estabilizarVisãostar
RECUPERAÇÃO DE TALUDES BAIRRO SÍTIO BRANCO
O projetista apresentou uma solução de contenção e estabilização da encosta utilizando um muro de contenção à gravidade em gabiões caixa e uVisãostar
REDROW HOMES DEVELOPMENT
The excavated chalk was originally scheduled for landscaping and offsite disposal. However, contractor GDL, their designers GES and Maccaferri determiVisãostar
REFORÇO DE BARRAGEM – CÓRREGO AÇUDE
O material adotado como solução pelo projetista foi o tecido técnico MacGrid® Net, onde através de sua alta tenacidade, agregou elevada resistênVisãostar
REFORÇO DE BASE DE PAVIMENTO – MARGINAL BOTAFOGO – PT
A Maccaferri apresentou uma solução com a utilização dos geossintéticos, que substituíssem o convencional e caro agulhamento com rachão. DepoisVisãostar
REFORÇO DE BASE DE PAVIMENTO – MARGINAL BOTAFOGO – PT
A Maccaferri apresentou uma solução com a utilização dos geossintéticos, que substituíssem o convencional e caro agulhamento com rachão. DepoisVisãostar
REFORÇO DE FUNDAÇÃO – BARRAGEM DE ÁGUA TAMBOMAYO
La solución propuesta por el consultor del proyecto fue recomendar el reforzamiento de la cimentación de la presa con geomallas MacGrid® WG, permitVisãostar
REFORÇO DE PAVIMENTAÇÃO – PLAZA VEA
Visando o melhoramento da capacidade de suporte do solo de fundação, chegou-se à solução ideal com o uso de geogrelhas, por conta da rapidez e prVisãostar
REFORÇO DE PAVIMENTAÇÃO – PLAZA VEA
Visando o melhoramento da capacidade de suporte do solo de fundação, chegou-se à solução ideal com o uso de geogrelhas, por conta da rapidez e prVisãostar
Rehabilitation due to Undermining in Villalobos
An environmentally sustainable engineering solution will be implemented. Technologies such as Terramesh System and Macgrid WG will be used to stabilizVisãostar
REINFORCED SOIL WALL AT ABUTMENT OF BRIDGE- 43 IN REASI, J&K
Based on the site conditions and specific requirements of the client, Terramesh units made of gabion fascia along with an integrated tail as reinforceVisãostar
Reinforced Soil Walls and Slope Reinforcement in HUARAZ – ANCASH – Perú
The major challenge was to propose a reinforced soil wall with a considerable height of 19 meters using the technical-economic competitiveness of the Visãostar
RENACE II – PT
Se implementaron 4 barreras, 3 de 50 metros lineales de longitud por 5 metros de altura y una de 40 metros lineales de longitud por 5 metros de alturaVisãostar
RENACE III – PT
Por medio de consultoría externa del cliente, se le indico que debía de colocar una red para controlar la caída de los desprendimientos superficialVisãostar
REPAIR AND IMPROVEMENT OF OUELLETTE DRAIN WEST OUTLET
RC Spencer Associates Inc., a reputable engineering firm in the Windsor area, was tasked by the Town of Amherstburg to devise aVisãostar
REPAVIMENTAÇÃO TÚNEL CARUPÁ
Foi recomendado a solução em geogrelha MacGrid® WG 50×50, combinada com a utilização do geotêxtil Nãotecido MacTex®. Essa solução é utilizaVisãostar
RESERVA NATURALE – NOROESTE/DF
Devido à exigência ambiental, a Maccaferri foi acionada para apresentar soluções que pudessem atender as características particulares dessa obra.Visãostar
RESERVATÓRIO SAN JUAN
Para a execução desse reservatório, foi utilizada nossa geomembrana MacLine® SDH e o geotêxtil nãotecido MacTex® N, para a proteção dos taludVisãostar
RESIDENCIA H11, ECO RESIDENCIAL VILLA REAL – PT
Fue escogido el sistema MacSoil® como solución idónea para cumplir con los objetivos del cliente. El muro tiene una altura pequeña que se adapta cVisãostar
RESIDENCIA H11, ECO RESIDENCIAL VILLA REAL – PT
Fue escogido el sistema MacSoil® como solución idónea para cumplir con los objetivos del cliente. El muro tiene una altura pequeña que se adapta cVisãostar
RESIDENCIAL BUCARESTE
A solução constituiu na execução de trincheiras drenantes com o MacDrain® TD para o rebaixamento do lençol freático, e a execução do MacDrainVisãostar
RESIDENCIAL BUCARESTE – PT
A solução constituiu na execução de trincheiras drenantes com o MacDrain® TD para o rebaixamento do lençol freático, e a execução do MacDrainVisãostar
RESTAURAÇÃO – AUTÓDROMO INTERNACIONAL DE GOIÂNIA
Pensando nisso, a AGETOP , órgão do estado responsável pela administração do autódromo, resolveu utilizar as geogrelhas para reforço de asfaltoVisãostar
RESTAURACIÓN – AUTÓDROMO INTERNACIONAL DE GOIÂNI
Pensando en ello, AGETOP, la agencia estatal responsable de la administración del autódromo, decidió utilizar geomallas para el refuerzo del asfaltVisãostar
RESTORATION OF THE ROAD LINK RR 128 AIN OCTOR – KORBOUS
The acrobatic works company, Hydrokarst, based in France, solicited Maccaferri to propose solutions for protection against rockfalls. Several types ofVisãostar
RETAINING WALL SUPPORTING A630
A PVC-coated welded mesh mass gravity gabion wall was originally proposed within the design. However, the PVC coating on weldedVisãostar
RETENTION WORKS FOR YADAGIRI GUTTA TEMPLE AREA
The site of the presidential suite building area is on hilly terrain and the foundation strata is completely rock. The height of the retention is varyVisãostar
REVESTIMENTO DE TALUDE – HOLCIM
Las mallas de doble torsión se utilizaron para controlar los desprendimientos superficiales en los taludes, y se fijan mediante anclajes de 1m Visãostar
REVESTIMENTO DE TALUDE EM ALTOS DE BOULEVARD
Se decide colocar dos muros de Gavión Caja con una sección principal de 7 m de alto y 136 m de largo, en total. Además de una sección en escuadra Visãostar
REVESTIMENTO DE TALUDE ROCHOSO
Para garantir a proteção de vidas, dos equipamentos, bem como a vida útil dos galpões contra a queda destes blocos de rocha, algo precisa ser feitVisãostar
REVESTIMENTO SUPERFICIAL EM CERRO SANTA ANA
Maccaferri de Ecuador realizó una evaluación de la condición actual del macizo rocoso que forma parte del Cerro Santa Ana, evidenciando el desprendVisãostar
RINGFIETSPAD ANTWERP
Mainly, four different types of facing inclinations have been used for this project: 27°, 34°, 45° and 60° The main product used is Terramesh GreeVisãostar
RIO ARICANDUVA
Decidiu-se canalizar este tão importante curso d’água de São Paulo. Para a obra em questão, fazia-se necessária uma solução que apresentasse Visãostar
RIO ARICANDUVA – PT
Decidiu-se canalizar este tão importante curso d’água de São Paulo. Para a obra em questão, fazia-se necessária uma solução que apresentasse Visãostar
RIO ARICANDUVA – PT
Decidiu-se canalizar este tão importante curso d’água de São Paulo. Para a obra em questão, fazia-se necessária uma solução que apresentasse Visãostar
RIO BERMEJO
A Prefeitura de Tarija juntamente com o Governo da Bolívia, escolheu usar os gabiões, colchões Reno® e os geotêxteis nãotecido MacTex® nas obraVisãostar
RIO BERMEJO
A Prefeitura de Tarija juntamente com o Governo da Bolívia, escolheu usar os gabiões, colchões Reno® e os geotêxteis nãotecido MacTex® nas obraVisãostar
RIO CHALLUAYACU – PT
Devidos aos benefícios de propiciar trabalho à mão de obra local não especializada, o baixo custo total da solução e sua excelente performance tVisãostar
RIO CHALLUAYACU – PT
Devidos aos benefícios de propiciar trabalho à mão de obra local não especializada, o baixo custo total da solução e sua excelente performance tVisãostar
RIO CHIJRA – PT
Foi realizada obras nas margens do rio, com o objetivo de proteção para permitir o desenvolvimento social na região. O projeto consistiu na proteçVisãostar
RIO CHIMORE – PT
O governo da Bolívia, com apoio do governo dos Estados Unidos, solicitou imediatamente a proteção contra a água acima da ponte, onde a Maccaferri Visãostar
RIO CHIMORE – PT
O governo da Bolívia, com apoio do governo dos Estados Unidos, solicitou imediatamente a proteção contra a água acima da ponte, onde a Maccaferri Visãostar
RÍO HUALLABAMBA – PT
La Municipalidad distrital de Huicungo solicitó apoyo a la empresa Hidroconsult E.I.R.L quien, luego de familiarizarse con nuestras soluciones, deciVisãostar
RÍO HUALLABAMBA – PT
La Municipalidad distrital de Huicungo solicitó apoyo a la empresa Hidroconsult E.I.R.L quien, luego de familiarizarse con nuestras soluciones, deciVisãostar
RIO HUALLAGA
Debido al peligro que corría, la población del distrito de Campanilla, el municipio se vio en la necesidad solicitar al empresa Hidroconsult E.I.R.LVisãostar
RIO HUALLAGA
Debido al peligro que corría, la población del distrito de Campanilla, el municipio se vio en la necesidad solicitar al empresa Hidroconsult E.I.R.LVisãostar
RIO LOS ANTIGUOS
O projeto de controle de inundações e proteção de margens foi elaborado por técnicos do Laboratório de Hidráulica do Instituto Nacional de ÁguVisãostar
RIO PESCADO
Sucesivas etapas de proyectos de control de erosión se concluyeron con el desarrollo de un proyecto integral diseñado y construido por la empresa INVisãostar
RIO PESCADO
Sucesivas etapas de proyectos de control de erosión se concluyeron con el desarrollo de un proyecto integral diseñado y construido por la empresa INVisãostar
RIO TIETÊ – PT
Foi iniciado em 1995 a maior obra de Saneamento da América Latina: o Projeto Tietê, onde foi realizado a coleta e tratamento de esgoto, rebaixamentoVisãostar
Road stabilization in Totonicanapá
The use of mono-oriented MacGrid WG geogrids integrated into the Terramesh system offers a superior technical solution for the containment project in Visãostar
ROB FOR CONNECTIVITY BETWEEN MUNDRA AND NH 8A
The stone column technique, also known as vibro-replacement or vibro-displacement, is a ground improvement process where vertical columns of compactedVisãostar
ROCK SUPPORT IN VÍCAR, ALMERÍA
To address this problem, the following support measures were implemented:LEA 300-8 cable net with a tensile strength of 130 kN/m and a puncture resistVisãostar
ROCKFALL MITIGATION WORKS- RAILWAY LINE-NEAR CH 14 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. RVisãostar
ROCKFALL PROTECTION AT SIMPANG PULAI, PERAK, MALAYSIA
Based on the rockfall trajectory analysis, the design energy level required is 2000 kJ. Flexible barrier with post height of 4m in installed over 500mVisãostar
RODOVIA BR 40 – KM 44
O projetista indicou a utilização de uma barreira com 60 metros de comprimento e 3 metros de altura, posicionada no pé do talude. Os principais eleVisãostar
RODOVIA COMENDADOR ALBERTO BONFIGLIOLI, KM 1
Como solução de estabilização, a proteção do terrapleno foi realizada com malha hexagonal de dupla torção MacMat® HS 100. A solução propostVisãostar
RODOVIA COMENDADOR ALBERTO BONFIGLIOLI, KM 1
Como solução de estabilização, a proteção do terrapleno foi realizada com malha hexagonal de dupla torção MacMat® HS 100. A solução propostVisãostar
RODOVIA DO AÇO – ACCIONA
A solução adotada foi a aplicação de geomanta reforçada MacMat® R aliada a um sistema de chumbadores de até 3m de comprimento, afim de controlaVisãostar
RODOVIA DO AÇO – ACCIONA
A solução adotada foi a aplicação de geomanta reforçada MacMat® R aliada a um sistema de chumbadores de até 3m de comprimento, afim de controlaVisãostar
RODOVIA INTEROCEÂNICA NORTE
Foi realizada a construção de um muro em solo reforçado, onde foi utilizado o Terramesh® System. A importância e particularidade deste projeto seVisãostar
ROTA NACIONAL Nº 234
O traçado que executado havia sido projetado nos anos 60, cumprindo os requerimentos necessários para melhoramento, assim como diminuir ao máximo oVisãostar
ROTA NACIONAL Nº 234
O traçado que executado havia sido projetado nos anos 60, cumprindo os requerimentos necessários para melhoramento, assim como diminuir ao máximo oVisãostar
ROTA NACIONAL Nº3 E RIO SAUCE CHICO
Foi realizado um talude que foi protegido com colchões Reno® e gabiões caixa. A proteção se estende até encontrar-se com a proteção dos estribVisãostar
ROTA PROVINCIAL Nº 33
Para recompor as seções afetadas do aterro viário, decidiu-se utilizar o sistema Terramesh® Verde. Os principais motivos que levaram a escolha porVisãostar
SAAE ITAPIRA
O armazenamento e o tratamento do efluente são feitos em lagoas de solo escavado, onde foi aplicado a geomembrana MacLine® e previsto um sistema de Visãostar
SAAE ITAPIRA – PT
O armazenamento e o tratamento do efluente são feitos em lagoas de solo escavado, onde foi aplicado a geomembrana MacLine® e previsto um sistema de Visãostar
SADAWARNA DAM PARAMESH WALL
The Retaining Wall Structure for Stilling Basin in Sadawarna Dam is constructed using Paramesh System with a height of 5m, consisting of the TerrameshVisãostar
SADIA S.A. – PT
A Maccaferri do Brasil Ltda, que já tem um histórico de serviços prestados à Sadia S.A., buscando a melhor solução técnica e econômica para esVisãostar
SADIA S.A. – PT
A Maccaferri do Brasil Ltda, que já tem um histórico de serviços prestados à Sadia S.A., buscando a melhor solução técnica e econômica para esVisãostar
SAFETY WORKS ON THE RD 900 IN THE ROCHAILL SECTOR
As part of the MBC project in the Alpes de Haute Provence department, EPC France called on France Maccaferri to provide a wide range of solutions for Visãostar
SANEPAR – PT
Foi realizado um estudo de viabilidade técnica que atendesse a necessidade de impermeabilização de toda a lagoa, incluindo o eixo dos pilares. NestVisãostar
SANEPAR – PT
Foi realizado um estudo de viabilidade técnica que atendesse a necessidade de impermeabilização de toda a lagoa, incluindo o eixo dos pilares. NestVisãostar
SANTA MÔNICA JARDINS
Após a realização de um estudo de viabilidade, decidiu-se pela substituição do sistema já instalado por um geocomposto drenante, que possibilitaVisãostar
SANTA MÔNICA JARDINS – PT
Após a realização de um estudo de viabilidade, decidiu-se pela substituição do sistema já instalado por um geocomposto drenante, que possibilitaVisãostar
SANTA MÔNICA JARDINS – PT
Após a realização de um estudo de viabilidade, decidiu-se pela substituição do sistema já instalado por um geocomposto drenante, que possibilitaVisãostar
SÃO SEBASTIÃO – LITORAL NORTE
Durante visita ao local constatou-se que o talude apresentava uma inclinação e estava muito próximo da edificação, descartando a possibilidade daVisãostar
SÃO SEBASTIÃO – LITORAL NORTE – PT
Durante visita ao local constatou-se que o talude apresentava uma inclinação e estava muito próximo da edificação, descartando a possibilidade daVisãostar
SCHINCARIOL
Para possibilitar o aumento da capacidade da estação de tratamento do Grupo, foi projetada e construída uma nova lagoa de tratamento de efluentes. Visãostar
SCHINCARIOL – PT
Para possibilitar o aumento da capacidade da estação de tratamento do Grupo, foi projetada e construída uma nova lagoa de tratamento de efluentes. Visãostar
SCHINCARIOL – PT
Para possibilitar o aumento da capacidade da estação de tratamento do Grupo, foi projetada e construída uma nova lagoa de tratamento de efluentes. Visãostar
SEATION TRAMWAY
The site is situated above an area of soft soil that required substantial ground improvement.The new platform area adjacent to Visãostar
Second Stage MME at Puerto Escondido Airport
To strengthen the embankment, a longitudinal containment structure was designed and built, combining gabion walls and the Terramesh System along with Visãostar
SERRA DOS CARAJÁS
Para o devido encaminhamento da água acumulada, e dissipação desta energia, foi adotada como solução a escada hidráulica em colchões Reno®, reVisãostar
SERRA DOS CARAJÁS – PT
Para o devido encaminhamento da água acumulada, e dissipação desta energia, foi adotada como solução a escada hidráulica em colchões Reno®, reVisãostar
SERRA DOS CARAJÁS – PT
Para o devido encaminhamento da água acumulada, e dissipação desta energia, foi adotada como solução a escada hidráulica em colchões Reno®, reVisãostar
SERVIÇOS SAN ROQUE
O projeto contemplou a impermeabilização da lagoa de tratamento anaeróbio de 77m de comprimento por 37m de largura e profundidade de 3,5m, com uma Visãostar
SEVEN EMPREENDIMENTOS
A solução inicialmente analisada caracterizava-se pelo uso das macro fibras sintéticas, onde no projeto estimava-se uma dosagem de 5 quilos deste mVisãostar
SEVEN EMPREENDIMENTOS – PT
A solução inicialmente analisada caracterizava-se pelo uso das macro fibras sintéticas, onde no projeto estimava-se uma dosagem de 5 quilos deste mVisãostar
SEVEN EMPREENDIMENTOS – PT
A solução inicialmente analisada caracterizava-se pelo uso das macro fibras sintéticas, onde no projeto estimava-se uma dosagem de 5 quilos deste mVisãostar
SISTEMA DE DRENAGEM BR-020
A solução adotada foi a utilização de linhas de bueiros cujas saídas e proteções estavam dimensionadas utilizando concreto armado. Devido a necVisãostar
SLOPE PROTECTION MEASURES- RAILWAY LINE- NEAR CH 13 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. VVisãostar
SLOPE STABILISATION PORT OF ZIERBENA
To secure the area, a highly rigid flexible containment system was designed and installed to limit ground deformation as much as possible, with a veryVisãostar
SLOPE STABILIZATION AND PROTECTION AT ULU SLIM RIVER, PERAK
After careful considerations, Jabatan Kerja Raya (JKR) Batang Padang adopted Maccaferri Gabions Retaining Wall to solve this problem and increase safeVisãostar
Small green lung in the Metelliana Valley
Maccaferri’s solution to the environmental challenges posed by the abandoned landfill in Cava de’ Tirreni involved the application of advanced geoVisãostar
SMRITIVAN EARTHQUAKE MEMORIAL
Maccaferri was involved in the supply, design and supervision of double twisted, mechanically woven gabions structures for the project. Gabions designVisãostar
SNCF LINE 930 000 FROM MARSEILLE TO VINTIMILLE
The work involved installing 3 lines of protective screens on the rock faces located on the slope and in the access trench to the Cap Martin tunnel, fVisãostar
SOLEIRA SUBMERSA EM ESTACAS PRANCHA – RENOMAC®
O barramento executado foi protegido com a solução Renomac®, especialmente desenvolvida para aplicações submersas, com malha hexagonal de dupla tVisãostar
SOLEIRA SUBMERSA EM ESTACAS PRANCHA – RENOMAC®
O barramento executado foi protegido com a solução Renomac®, especialmente desenvolvida para aplicações submersas, com malha hexagonal de dupla tVisãostar
SOLO GRAMPEADO CLINICA SÃO GONÇALO
Após o corte do talude, fez-se necessária a aplicação de uma solução que fosse capaz de proteger a superfície da instauração de processos eroVisãostar
SOLO GRAMPEADO CLINICA SÃO GONÇALO
Após o corte do talude, fez-se necessária a aplicação de uma solução que fosse capaz de proteger a superfície da instauração de processos eroVisãostar
SOLO GRAMPEADO COM FACE VEGETADA
O solo grampeado consiste em uma solução de estabilização global por meio de inserção de grampos. Com o objetivo de estabilizar a camada superfiVisãostar
SOLO GRAMPEADO COM FACE VEGETADA
O solo grampeado consiste em uma solução de estabilização global por meio de inserção de grampos. Com o objetivo de estabilizar a camada superfiVisãostar
SOLO GRAMPEADO VERDE
Ocorreu uma estabilização do talude através da técnica de solo grampeado com revestimento flexível, que consiste na inserção de chumbadores parVisãostar
SOLO REFORÇADO – PROJETO MICHIQUILLAY
Este proyecto incluyó la construcción de 24 plataformas reforzadas con la solución Terramesh® Verde, con alturas que van desde 1,20 m 4,80 m al laVisãostar
SOLO REFORÇADO – PROJETO MICHIQUILLAY
Este proyecto incluyó la construcción de 24 plataformas reforzadas con la solución Terramesh® Verde, con alturas que van desde 1,20 m 4,80 m al laVisãostar
SOLO REFORÇADO BR-163
Foi proposto um sistema de contenção em solo reforçado com utilização do Terramesh System®, geogrelhas MacGrid® e Gabiões Caixa. Por conta da Visãostar
SOLO REFORÇADO BR-163
Foi proposto um sistema de contenção em solo reforçado com utilização do Terramesh System®, geogrelhas MacGrid® e Gabiões Caixa. Por conta da Visãostar
SOLO REFORÇADO – REFUGIO LA MOLINA
Se propuso una solución técnicamente confiable y económicamente más conveniente para los usuarios, que és el Terramesh® System, que por la dismiVisãostar
SP 344 – KM 209 – RENOVIAS
A solução foi encontrada na utilização dos geocompostos MacDrain® TD atuando com “drenos de pavimento”, que quando inseridos entre as camadasVisãostar
SP 344 – KM 209 – RENOVIAS – PT
A solução foi encontrada na utilização dos geocompostos MacDrain® TD atuando com “drenos de pavimento”, que quando inseridos entre as camadasVisãostar
SP 344 – KM 209 – RENOVIAS – PT
A solução foi encontrada na utilização dos geocompostos MacDrain® TD atuando com “drenos de pavimento”, que quando inseridos entre as camadasVisãostar
SPOORLIJN 51A – ZWANKENDAMME
The tender specifications were very strict asking PVA geogrids that were provided by the local partner Texion Geosynthetics NV, while Maccaferri supplVisãostar
St Andrews Royal & Ancient Golf Club
The approved scheme was designed by HR Wallingford, to include both ‘hard’ and ‘soft’ engineering solutions and the contract was supervised byVisãostar
STRENGTHENING OF THE ROADBED LAYER OF THE RN4
Initially, a granular drain mat was installed at the PST (Upper Part of Earthworks) level to capture flows and percolations from surrounding water basVisãostar
SUB-DRENAGENS ROTA 27
Se optó por utilizar el geocompuesto drenante MacDrain® TD en sustitución de una trinchera convencional de gravilla. El sistema consistió en la exVisãostar
SUB-DRENAGENS ROTA 27
Se optó por utilizar el geocompuesto drenante MacDrain® TD en sustitución de una trinchera convencional de gravilla. El sistema consistió en la exVisãostar
SUBDRENAGEM DA RODOVIA IQUITOS – NAUTA
El consorcio Vial Nauta fue el encargado del estudio y construcción de la carretera. Buscando satisfacer las Visãostar
SUBESTAÇÃO JOÃO CÂMARA III – 500/230 KV
Por sua facilidade de execução e por atender aos requisitos do projeto, foi escolhido como solução a realização de uma contenção a gravidade eVisãostar
SUBESTAÇÃO JOÃO CÂMARA III – 500/230 KV
Por sua facilidade de execução e por atender aos requisitos do projeto, foi escolhido como solução a realização de uma contenção a gravidade eVisãostar
SUMELA MONASTERY ROCKFALL PROTECTION PROJECT
Within the guidelines of a technical committee consisting of several professors from various, prestigious technical universities of the country, MaccaVisãostar
SUNSET CLIFF
The solution adopted for the Sunset Cliff walls consists of two types of systems:Gravity walls using gabions for walls with heights less than 6 metersVisãostar
SUSTENTAÇÃO COM SHOTCRETE NA MINA COLQUIJIRCA
Los asesores de Maccaferri propusieron un diseño de mezcla que se adecue a lo requerido por el cliente, logrando cumplir con las especificaciones téVisãostar
TALUDE CANRASH
Criou-se a necessidade da proteção superficial, onde era necessária uma garantia da interrupção provisória do transporte de sedimentos do taludeVisãostar
TALUDE NO AEROPORTO DE ILOPANGO
Para la estabilización del talud se utilizó Terramesh® System, malla recubierta con PVC de 2.7mm. Se colocaron geogrilla MacGrid® hacia adentro deVisãostar
TARLAC-NUEVA ECIJA PROVINCIAL ROAD
In this, Maccaferri engineers designed an asphalt reinforcement system using MacGrid ARVG fiberglass geocomposite, which was primarily designed tVisãostar
TELAL EL SOKHNA’ PROJECT
Maccaferri’s Paramesh MSE Wall system (with Terramesh facia units & Paralink geogrids) was eventually implemented, being a cost and time-effectiVisãostar
TERRAMESH – RJ142
Elaborada pela consultoria PCE, consiste em uma estrutura de solo reforçado Terramesh® System com painéis duplos de tela hexagonal de dupla torçãVisãostar
TERRAMESH – RJ142 – PT
Elaborada pela consultoria PCE, consiste em uma estrutura de solo reforçado Terramesh® System com painéis duplos de tela hexagonal de dupla torçãVisãostar
TERRAMESH – RJ142 – PT
Elaborada pela consultoria PCE, consiste em uma estrutura de solo reforçado Terramesh® System com painéis duplos de tela hexagonal de dupla torçãVisãostar
TERRAMESH RD PATRIMONIAL
O talude, caracterizado por sua inclinação acentuada, criou uma situação desafiadora que exigiu a implementação de medidas de contenção para gVisãostar
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
Firstly we redesigned the solution using Terramesh units with dimensions 3x3x1x1m. To ensure stability, Terramesh System was reinforced with ParaVisãostar
TERRAMESH VERDE – ACESSO AO ATERRO CÁRCAVA 1
Para este fin, se utilizó la solución con el sistema de suelo reforzado con Terramesh Verde. Este sistema consiste en un elemento con paramento fronVisãostar
TERRAMESH VERDE – PUENTE CONTINENTAL – PT
Para este fin se planteó la construcción de un muro de suelo reforzado a doble cara, que combinaba la utilización de dos sistemas de suelo reforzadVisãostar
TERRAMESH® SYSTEM CARRETERA MATARANI KM. 14 – PT
A fin de crear la plataforma que conformará la vía y tratar de no invadir las propiedades privadas aledañas al proyecto, fue diseñada una solucióVisãostar
TERRAMESH® VERDE CARRETERA MATARANI KM. 24
This road uses engineering solutions with reinforced soil walls, Terramesh® System and Terramesh® Verde, which economised the project by saving on bVisãostar
TERRAMESH® VERDE CARRETERA MATARANI KM. 29 – PT
A fin de crear la plataforma que conformará la vía y, asimismo, tratar de no invadir las propiedades privadas aledañas al proyecto, se proyectó unVisãostar
TERRAMESH® VERDE – PARQUE LETÔNIA
Para este fin se utilizó la solución con el sistema de suelo reforzado con Terramesh Verde. Este sistema consiste en un elemento con paramento frontVisãostar
TERZO VALICO DEI GIOVI – GENOVA JUNCTION
Maccaferri proposed an innovative approach involving Automated Tunnel Ribs HEB 300 complete with automated hinges and automated links (covering a lengVisãostar
The Ash Yard of the Thermal Power Plant
The creation of cells was carried out, protected with geosynthetics both at their base and in the closure, with three levels of impermeable protectionVisãostar
THE EXTENSION OF SITARSKA STREET OVER THE RAILWAY TRACKS
The MacRes system with concrete facing was proposed as a technology for retaining wall because of the space limitations and fast installation. The MacVisãostar
THE GRAND BOHEMIAN HOTEL
Initially, the project specifications called for S8 Aluminum anchors to be driven to a depth of 16'. However, during the installation, numerous prVisãostar
THE NEW ROUTE DU LITTORAL
The solution defined by the project management for the landward embankments was a geosynthetic stiffened embankment with a double-twist gabion facing.Visãostar
THREE CITIES TRAIL
The civil engineers at Halff successfully designed and implemented a tie-back reinforced gabion retaining wall to act as the slVisãostar
TK 2018 – 006 – MRV
A solução adotada para este caso de obra compreende em uma canalização retangular com seções transversais cuja altura varia entre 2 e 4m. Os murVisãostar
TRANSPORTADORA ATLAS
Com o objetivo de atender as necessidades do cliente, que exigia para a escolha da solução o tripé Segurança, Economia e Estética, foi adotado o Visãostar
TRANSPORTADORA ATLAS – PT
Com o objetivo de atender as necessidades do cliente, que exigia para a escolha da solução o tripé Segurança, Economia e Estética, foi adotado o Visãostar
TRANSPORTADORA ATLAS – PT
Com o objetivo de atender as necessidades do cliente, que exigia para a escolha da solução o tripé Segurança, Economia e Estética, foi adotado o Visãostar
TRANSZILLI APARECIDA DE GOIÂNIA
Para garantir a funcionalidade do piso, foi utilizada a solução de concreto reforçado com fibras de aço Wirand®, com uma dosagem de 20 Kg/m³ de Visãostar
TRANSZILLI APARECIDA DE GOIÂNIA – PT
Para garantir a funcionalidade do piso, foi utilizada a solução de concreto reforçado com fibras de aço Wirand®, com uma dosagem de 20 Kg/m³ de Visãostar
TRANSZILLI APARECIDA DE GOIÂNIA – PT
Para garantir a funcionalidade do piso, foi utilizada a solução de concreto reforçado com fibras de aço Wirand®, com uma dosagem de 20 Kg/m³ de Visãostar
TRASVASE DAULE VINCES – PT
O projeto consiste na regularização e revestimento das margens do rio Daule com geomembranas, sistema de drenagem sub-superficial para rebaixamento Visãostar
TRAVESSIA DUTO TRANSPETRO – LOT. CAMPO BELO
Para evitar carregamento adicional sobre os dutos devido a passagem dos veículos, foi proposto e aprovado a construção da base reforçada com geogrVisãostar
TRAVESSIA DUTO TRANSPETRO – LOT. CAMPO BELO
Para evitar carregamento adicional sobre os dutos devido a passagem dos veículos, foi proposto e aprovado a construção da base reforçada com geogrVisãostar
TRAVESSIA URBANA DE SANTA MARIA
Optou-se pela aplicação da geomanta MacMat® 10.1 e sobre esta a projeção de hidrossemeadura. Com isso, foi possível controlar os processos erosiVisãostar
TREM DAS SERRAS
A fim de estabilizar e controlar a queda das rochas, foi realizada a instalação de revestimento cortical (SteelGrid® BO, SteelGrid® MO), e revestiVisãostar
TREM DAS SERRAS
A fim de estabilizar e controlar a queda das rochas, foi realizada a instalação de revestimento cortical (SteelGrid® BO, SteelGrid® MO), e revestiVisãostar
Trincheiras Drenantes
A solução adotada foi a execução de trincheiras drenantes com o geocomposto MacDrain® TD como drenos laterais de base, os quais tem a função deVisãostar
TÚNEL OLMOS – PT
Diante do requerimentos do projeto, os materiais usados deveriam cumprir com altos padrões de qualidade de resistência e durabilidade, assim, como oVisãostar
UNIDADE ESCOLAR SETE LAGOAS
A fim de vencer este desnível sem invadir os limites e edificações previstos no projeto, foi proposto um muro em solo reforçado Terramesh® SystemVisãostar
UNIDADE ESCOLAR SETE LAGOAS
A fim de vencer este desnível sem invadir os limites e edificações previstos no projeto, foi proposto um muro em solo reforçado Terramesh® SystemVisãostar
USINA DE ASFALTO COTREL
Como a nova usina de asfalto seria locada ao lado da central de britagem da empresa, a solução de estrutura de contenção em Terramesh® System foiVisãostar
USINA UBERABA
Como solução, foi proposto e executado uma estrutura em Gabiões Caixa para contenção do aterro nas alas da ponte e proteção da margem. PrevendoVisãostar
USINA UBERABA – PT
Como solução, foi proposto e executado uma estrutura em Gabiões Caixa para contenção do aterro nas alas da ponte e proteção da margem. PrevendoVisãostar
VALE EDECONSIL – KM 514
A estrutura de contenção idealizada, deveria proteger o corpo do aterro da sazonalidade temporal de um curso d'água existente. Foi projetado umVisãostar
VALE EDECONSIL – KM 514 – PT
A estrutura de contenção idealizada, deveria proteger o corpo do aterro da sazonalidade temporal de um curso d'água existente. Foi projetado umVisãostar
VÍA BOGOTÁ-VILLAVICENCIO – PT
Foram realizadas as remoções de materiais mais soltos e obras de controle de águas de escoamento superficial. Adicionalmente, utilizou-se a malha eVisãostar
VIA CALDERÓN – GUAYLLABAMBA – PT
Como o layout da estrada exigiu grandes cortes por sua realização, em um solo cuja granulometria heterogênea e baixa coesão foram acompanhadas de Visãostar
VIA CUSCO SETOR MOLLECITO
Se llevo a cabo la ejecución de muros de suelo reforzado “back to back” de altura mayor a los 17m para dar continuidad a la vía y canalizar las Visãostar
VIA DE ACESSO PUG MEDELLÍN
Para solucionar la necesidad de la obra y por temas de rapidez, facilidad constructiva, considerable ahorro económico con respecto a otras solucionesVisãostar
VIA DE ACESSO PUG MEDELLÍN
Para solucionar la necesidad de la obra y por temas de rapidez, facilidad constructiva, considerable ahorro económico con respecto a otras solucionesVisãostar
VIADUTO AUTOPORTANTE EM MACWALL
A solução adotada foi uma contenção em solo reforçado com bloco modular de concreto MacWall® e geogrelha MacGrid® WG, com seção crítica de 8Visãostar
VIADUTO AV. DAS TORRES – PT
Definiu-se a criação de um viaduto para melhorar o fluxo de carros, atingindo diretamente e indiretamente quase 100mil pessoas com essa intervençãVisãostar
VIADUTO AV. DAS TORRES – PT
Definiu-se a criação de um viaduto para melhorar o fluxo de carros, atingindo diretamente e indiretamente quase 100mil pessoas com essa intervençãVisãostar
Village Brow, Crawfordsburn
Maccaferri Green Terramesh Reinforced Soil Slope was proposed and accepted as an appropriate solution. The total length of the slope was 70m, reachingVisãostar
VOID SPANNING IN HOUSING DEVELOPMENT
The Developer’s Engineer approached Maccaferri to providedesign and supply of a high-strength geogrid solution. The proposed site topography was comVisãostar
WALTHAM HIGH SCHOOL
Based on the rock wall’s height, geotechnical characteristics and the proximity of it to the school, a pinned drapery solution was the recommended mVisãostar
YAMANA DESENVOLVIMENTO MINERAL S/A
A empresa Consulgeo Consultoria e Projetos Geotécnicos, realizou um projeto de contenção em solo reforçado Terramesh® System, reforçado com geogVisãostar
YAMANA DESENVOLVIMENTO MINERAL S/A – PT
A empresa Consulgeo Consultoria e Projetos Geotécnicos, realizou um projeto de contenção em solo reforçado Terramesh® System, reforçado com geogVisãostar
YELLOWSTONE HWY 20
The barrier was impacted on May 27, 2019, the opening day of summer travel to Yellowstone National Park. Wyoming DOT was notified of the large rockfaVisãostar
Não encontrou o que estava procurando?
Conheça nossos especialistas
Representamos um parceiro vencedor para o complexo mundo da construção civil e industrial. Graças a uma ampla gama, nossos produtos são a resposta às diversas demandas técnicas do setor: desde drenagem e proteção até água e impermeabilização de estruturas e revestimentos, passando por economia de energia e conforto na habitação, controle de vapor e questões relacionadas.