CONSTRUCTION OF DUAL CARRIAGEWAY NATIONAL ROAD NR-32 PHASE-1
Challenge
As part of the continued development of the ‘Road Nos. 1 and 5 and Drainage Systems’ in Duqm, Oman, SEZAD commissioned the consultant NESPAK to design the ‘Construction of Dual Carriageway National Road NR-32 Phase-1.’ The project included a total road length of 16 km, three bridges, and five roundabouts or intersections. However, the project faced significant geotechnical challenges, especially in the first 4 km, where the new road connected to the existing one. This section traversed areas dominated by weak soft clay and sabkha soil, posing difficulties for foundation construction. The remaining 12 km featured intermittent cavities that required a robust pavement stabilization solution to ensure long-term structural integrity. Addressing these complex soil conditions demanded a customized stabilization strategy to meet the technical and economic requirements of the project.
Solution
Given the successful implementation of high-strength basal reinforcement in the earlier project phase, the same approach was adopted for the first 4 km of Road NR-32. Maccaferri Middle East (MME) was engaged as a technical partner to provide ground stabilization solutions tailored to the site conditions. For the weak sabkha soil in the initial stretch, MME recommended Paralink 500 high-strength geogrid for basal reinforcement, underlaid with a thick boulder layer. This design not only served as a working platform but also expedited consolidation settlement and minimized differential settlements through a beam effect. For the remaining 12 km, characterized by intermittent cavities, MME proposed the use of MacGrid EG 30 S geocomposite to stabilize the pavement effectively. All designs adhered to the guidelines of British Standard BS:8006-2010, ensuring compliance with international standards. Maccaferri Middle East provided comprehensive support, including design, material supply, and site assistance, ensuring the stabilization solutions were implemented efficiently. This approach successfully addressed the challenging soil conditions, delivering a durable and cost-effective foundation for the road’s construction and long-term performance.
Our products for
this Success Story
Get in touch with us
[contactForm_txtSuccessSubmit]