Facebook pixel

Camel Bridge

Home > Success stories > Camel Bridge

2023

Qatar

Ashghal

Ashghal

Maccaferri

Camel Bridge

Challenge

The Camel Bridge project required the construction of a mechanically stabilized earth retaining wall in a highly constrained geometry, with limited available space behind the wall and strict architectural requirements at the bridge interface. In addition to the structural demands, the wall had to accommodate additional concrete cladding on the front face, increasing loads on the facing system while maintaining alignment, durability, and aesthetic quality. Conventional retaining wall solutions were not suitable due to the narrow footprint and the need for a robust facing capable of supporting the added cladding elements.

Solution

Maccaferri’s MacRes® reinforced soil wall system was selected to address both the geometric constraints and the architectural requirements of the project. The system combines vertical precast concrete facing panels with ParaWeb® high-tenacity polyester Geostrips, providing high tensile capacity, excellent load transfer, and long-term durability. The proprietary MacRes panel-to-reinforcement connection allowed the wall to safely support the additional concrete cladding while maintaining a reduced reinforcement length, ideal for the restricted site conditions. This integrated solution delivered a structurally efficient, durable, and aesthetically compliant retaining wall system tailored to the specific demands of the Camel Bridge project.

Used Products

MACRES
MACRES
Maccaferri offers dedicated engineering support at every stage of your project. From initial consultation and customized desigView
star

Get in contact with our Experts Today

Our team of experts is ready and eager to assist you: whether you have questions about our latest products, or seek customized solutions for your specific challenges, we’re just a click or call away.

Image