Rok
2024
Lokalita
ANTWERP - ANTWERP - Belgium
Klient
Lantis / Texion Geosynthetics NV
Projektant
Arcadis NV /Lantis

Výzva

The Oosterweel Link project is a new 15km-long motorway connection developed by Lantis for completing the Antwerp ring road R1 (Belgium). It is a major project in Belgium and its design started in the 1990s to find a solution to the congestion problems in and around Antwerp. The total estimated cost of the project is approximately €4.5bn. The Antwerp ring road is a key part of the Trans-European

Transport (TEN-T) Core Network.

Maccaferri collaborated with the design and building of the Mechanically Stabilized Earth (MSE) walls with its main product family „Terramesh“. This is a well-known system used in Europe and in the rest of the world to support or enable the construction of infrastructures in tight urban corridors, forming retaining walls, road embankments, wing walls and bridge abutments known as Geosynthetic Reinforced Soil-Integrated Bridge Systems (GRS-IBS).

„Terramesh“ double twist steel wire mesh reinforcements have been used in combination with ParaLink® and Paragrid® geogrids representing an evolution and a significant advantage for both cost-effectiveness and performance. The project includes 15.000 facing sqm of „Terramesh Green®“, 14.000 facing sqm of „Terramesh Mineral® and System® and 5.000 facing sqm of gabion cladding.

Riešenie

The maximum retaining height of the direct bridge abutment called G03 is 13m with a front inclination of 85°. For the front Terramesh units were used, while for the main reinforcement, ParaLink and Paragrid geogrids were laid with a nominal tensile strength from 150 kN/m up to 700 kN/m. Main challenges have been encountered in the optimization and computation of the materials during the design processes, which have been made with the combined use of LEM, FEM, and BIM technologies, and mainly during installation due to the strict restrictions given by demanding geometry of the facing of the structures provided in the design. The geometry of the constructed structures has been checked with in situ testing, resulting in consistency within the design tolerances with a maximum measured vertical settlement of 160mm.

Stiahnite si Príbeh Úspechu

Stiahnuť

Naše produkty pre
tento Príbeh Úspechu

Spojte sa s nami

Ak súhlasíte so Zásadami ochrany osobných údajov spoločnosti a rozumiete ich obsahu, prevádzkovateľ sa vás pýta, či súhlasíte so spracovaním údajov spôsobom uvedeným v zásadách ochrany osobných údajov spoločnosti na účely zasielania propagačných oznámení o službách/činnostiach poskytovaných prevádzkovateľom. *

Prevádzkovateľ sa vás ďalej pýta, či súhlasíte s poskytnutím vašich osobných údajov pridruženým spoločnostiam Maccaferri a s prípadným následným prenosom mimo EÚ, na ich vlastné účely, vrátane účelov propagačnej povahy (zasielanie marketingových oznámení) *