ÇÖPLER GOLD MINE ROCK FALL PROJECT

Rok
2018-2019
Lokalita
ERZİNCAN - DOĞU ANADOLU - Turkey
Klient
ANAGOLD MADENCİLİK SAN. ve TİC. A.Ş.

Výzva

The Çöpler mine site is an open pit operation located 8 km away from Ilıc District of Erzincan City, approximately 550 km east of Ankara in Middle Anatolia with the capacity to process approximately 20,000 tonnes of oxide ore per day. During the extension of the waste storage area, rockfall from the rocky slopes next to the construction area forced the company to stop the construction temporarily in order to prevent damage on the membranes and to decrease the risk for the construction crew.

Riešenie

In accordance with the urgency of the situation, the size of the potentially dangerous rocks on the slope and in line with the technical and economic conditions, Steel Grid HR100 has been installed on the steep slopes running along the waste storage area. The total area of approximately 30,000 m² has been installed in a time period of 4-6 weeks under the cooperation with our professional mountainer crew.

Stiahnite si Príbeh Úspechu

ÇÖPLER GOLD MINE ROCK FALL PROJECT

Stiahnuť
ÇÖPLER GOLD MINE ROCK FALL PROJECT

Naše produkty pre
tento Príbeh Úspechu

Spojte sa s nami

Ak súhlasíte so Zásadami ochrany osobných údajov spoločnosti a rozumiete ich obsahu, prevádzkovateľ sa vás pýta, či súhlasíte so spracovaním údajov spôsobom uvedeným v zásadách ochrany osobných údajov spoločnosti na účely zasielania propagačných oznámení o službách/činnostiach poskytovaných prevádzkovateľom. *

Prevádzkovateľ sa vás ďalej pýta, či súhlasíte s poskytnutím vašich osobných údajov pridruženým spoločnostiam Maccaferri a s prípadným následným prenosom mimo EÚ, na ich vlastné účely, vrátane účelov propagačnej povahy (zasielanie marketingových oznámení) *