PROTEÇÃO COSTEIRA COM GABIÕES

Godina
2021
Lokacija
TIBAU - RIO GRANDE DO NORTE - Brasil
Klijent
Condomínio Mar D'Ouro

Izazov

The sea waves were eroding the seafront in front of the condominium, where the development's leisure area and access ramp are located. These erosions have caused problems getting around and accessing the property.

Rešenje

To protect and control erosion, PoliMac™ box-type gabion containment was used, together with a PoliMac™ Reno® mattress, used at the pipe outlets, thus guaranteeing the protection and revitalisation of the development's waterfront.

Preuzmite Priča o Uspehu

PROTEÇÃO COSTEIRA COM GABIÕES

Preuzmi
PROTEÇÃO COSTEIRA COM GABIÕES

Naši proizvodi za
ovu Priča o Uspehu

Stupite u kontakt sa nama

Ako se slažete sa Politikom privatnosti kompanije i razumeli ste njen sadržaj, Rukovatelj podataka vas pita da li pristajete na obradu na način predviđen politikom privatnosti kompanije radi slanja promotivnih obaveštenja o uslugama/aktivnostima koje pruža Rukovatelj podataka. *

Osim toga, Rukovatelj podataka vas pita da li pristajete na dostavljanje vaših ličnih podataka Povezanim licima Maccaferri, kao i na eventualni prenos van EU koji iz toga može proizaći, u njihove sopstvene svrhe, uključujući promotivne svrhe (slanje marketinških obaveštenja) *