Godina
2022
Lokacija
ANTWERP - ANTWERP - Belgium
Klijent
Lantis / Texion Geosynthetics NV
Projektant
Arcadis NV /Lantis

Izazov

The Oosterweel Link project is a new 15km-long motorway connection developed by Lantis for completing the Antwerp ring road R1 (Belgium). It is a major project in Belgium and its design started in the 1990s to find a solution to the congestion problems in and around Antwerp. The total estimated cost of the project is approximately €4.5bn. The Antwerp ring road is a key part of the Trans-European

Transport (TEN-T) Core Network.

Maccaferri collaborated with the design and building of the Mechanically Stabilized Earth (MSE) walls with its main product family „Terramesh“. This is a well-known system used in Europe and in the rest of the world to support or enable the construction of infrastructures in tight urban corridors, forming retaining walls, road embankments, wing walls and bridge abutments known as Geosynthetic Reinforced Soil-Integrated Bridge Systems (GRS-IBS).

„Terramesh“ double twist steel wire mesh reinforcements have been used in combination with ParaLink® and Paragrid® geogrids representing an evolution and a significant advantage for both cost-effectiveness and performance. The project includes 15.000 facing sqm of „Terramesh Green®“, 14.000 facing sqm of „Terramesh Mineral® and System® and 5.000 facing sqm of gabion cladding.

Rešenje

Along the main road E34 the design foresaw the construction of noise barriers up to 9m of height. The front inclination was planned by 70° to ease the re-greening of the slopes.

Terramesh Green and Terramesh Mineral were used in accordance to the plan. in the area under the bridges, the Terramesh Mineral was used to avoid any maintenance of the green slopes. Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global and Internal stability checks with Limit Equilibrium Method (LEM) analyses carried out with MacStars Software to Finite Element Method (FEM)

deformation analyses due to the strict restrictions on displacements. Maccaferri provided the designers with all material properties for correct modeling.

Preuzmite Priča o Uspehu

Preuzmi

Naši proizvodi za
ovu Priča o Uspehu

Stupite u kontakt sa nama

Ako se slažete sa Politikom privatnosti kompanije i razumeli ste njen sadržaj, Rukovatelj podataka vas pita da li pristajete na obradu na način predviđen politikom privatnosti kompanije radi slanja promotivnih obaveštenja o uslugama/aktivnostima koje pruža Rukovatelj podataka. *

Osim toga, Rukovatelj podataka vas pita da li pristajete na dostavljanje vaših ličnih podataka Povezanim licima Maccaferri, kao i na eventualni prenos van EU koji iz toga može proizaći, u njihove sopstvene svrhe, uključujući promotivne svrhe (slanje marketinških obaveštenja) *