ÇÖPLER GOLD MINE ROCK FALL PROJECT

Godina
2018-2019
Lokacija
ERZİNCAN - DOĞU ANADOLU - Turkey
Klijent
ANAGOLD MADENCİLİK SAN. ve TİC. A.Ş.

Izazov

The Çöpler mine site is an open pit operation located 8 km away from Ilıc District of Erzincan City, approximately 550 km east of Ankara in Middle Anatolia with the capacity to process approximately 20,000 tonnes of oxide ore per day. During the extension of the waste storage area, rockfall from the rocky slopes next to the construction area forced the company to stop the construction temporarily in order to prevent damage on the membranes and to decrease the risk for the construction crew.

Rešenje

In accordance with the urgency of the situation, the size of the potentially dangerous rocks on the slope and in line with the technical and economic conditions, Steel Grid HR100 has been installed on the steep slopes running along the waste storage area. The total area of approximately 30,000 m² has been installed in a time period of 4-6 weeks under the cooperation with our professional mountainer crew.

Preuzmite Priča o Uspehu

ÇÖPLER GOLD MINE ROCK FALL PROJECT

Preuzmi
ÇÖPLER GOLD MINE ROCK FALL PROJECT

Naši proizvodi za
ovu Priča o Uspehu

Stupite u kontakt sa nama

Ako se slažete sa Politikom privatnosti kompanije i razumeli ste njen sadržaj, Rukovatelj podataka vas pita da li pristajete na obradu na način predviđen politikom privatnosti kompanije radi slanja promotivnih obaveštenja o uslugama/aktivnostima koje pruža Rukovatelj podataka. *

Osim toga, Rukovatelj podataka vas pita da li pristajete na dostavljanje vaših ličnih podataka Povezanim licima Maccaferri, kao i na eventualni prenos van EU koji iz toga može proizaći, u njihove sopstvene svrhe, uključujući promotivne svrhe (slanje marketinških obaveštenja) *