BE-MECHELEN R6

Rok
2020
Lokalizacja
MECHELEN - MECHELEN - Belgium
Klient
Texion Geosynthetics NV
Projektant
Arcadis NV

Wyzwanie

The construction of part of the new ring-road R6 in the municipality of Mechelen, Belgium, required the construction of 2 new road bridges. The designer adopted a very particular shape of the bridge abutment, where the two access ramps had to be built using a reinforced soil structure. The choice of Mineral Terramesh was very well appreciated because of the ease of construction and because of the nice external finishing. Moreover, the Municipality did not want to carry any maintenance of green facings, therefore the stone facing has been very well appreciated by the public authority.

Rozwiązanie

The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the CUR normative (Netherlands). Since the CUR Norms are more demanding, the Mineral Terramesh units have been additionally reinforced with Maccaferri´s geogrids. The possibility to modify the units to follow the exact shape of the bridge has been very well appreciated by the contractor Stadsbader NV, that later chose the same system for the big project "Oosterweel Linkeroever".

Pobierz Historia Sukcesu

BE-MECHELEN R6

Pobierz
BE-MECHELEN R6

Nasze produkty dla
tej Historia Sukcesu

Skontaktuj się z nami

Jeśli zgadzasz się z Polityką Prywatności firmy i zrozumiałeś jej treść, Administrator danych pyta, czy zgadzasz się na przetwarzanie danych w sposób przewidziany w polityce prywatności firmy w celu przesyłania komunikacji promocyjnej dotyczącej usług/działań świadczonych przez Administratora danych. *

Ponadto Administrator danych pyta, czy zgadzasz się na przekazanie Twoich danych osobowych Podmiotom Powiązanym Maccaferri oraz na wynikający z tego ewentualny transfer danych poza UE, do ich własnych celów, w tym o charakterze promocyjnym (wysyłanie komunikacji marketingowej) *