Second Stage MME at Puerto Escondido Airport

Anno
2022
Località
PUERTO ESCONDIDO - OAXACA - México
Cliente
SICT OAXACA
Progettista
HUAROCSO SA DE CV

Sfida

The erosive action of the stream flowing parallel to kilometer 137 on the federal highway Pinotepa Nacional - Salina Cruz has caused the undermining of the embankment, risking its stability. Additionally, the urban expansion brings a larger surface covered with asphalt and concrete, which have a lower infiltration coefficient, resulting in increased hydraulic expenditure, especially during hydro-meteorological events that affect this coastal city.

Soluzione

To strengthen the embankment, a longitudinal containment structure was designed and built, combining gabion walls and the Terramesh System along with Paragrid 200 HF geogrids. Additionally, transverse deflector-type structures and two gabion weirs were included to control the slope of the channel. Also, an increased embedment depth was implemented for this wall, located in a high seismicity zone.

Scarica
la Storia di Successo

Second Stage MME at Puerto Escondido Airport

Scarica
Second Stage MME at Puerto Escondido Airport

I nostri prodotti per
questa Storia di Successo

Mettiti in contatto con noi

Se sei d'accordo con l'Informativa sulla Privacy dell'azienda e ne hai compreso il contenuto, il Titolare del trattamento ti chiede se acconsenti al trattamento secondo le modalità previste dall'informativa sulla privacy dell'azienda per l'invio di comunicazioni promozionali relative ai servizi/alle attività offerte dal Titolare del trattamento. *

Inoltre, il Titolare del trattamento ti chiede se dai il tuo consenso alla comunicazione dei tuoi dati personali alle Affiliate Maccaferri, e al conseguente trasferimento extra-UE che ne potrebbe derivare, per finalità proprie di queste ultime, incluse quelle di natura promozionale (invio di comunicazioni di marketing) *