Anno
2024
Località
ANTWERP - ANTWERP - Belgium
Cliente
Lantis / Texion Geosynthetics NV
Progettista
Arcadis NV /Lantis

Sfida

The Oosterweel Link project is a new 15km-long motorway connection developed by Lantis for completing the Antwerp ring road R1 (Belgium). It is a major project in Belgium and its design started in the 1990s to find a solution to the congestion problems in and around Antwerp. The total estimated cost of the project is approximately €4.5bn. The Antwerp ring road is a key part of the Trans-European

Transport (TEN-T) Core Network.

Maccaferri collaborated with the design and building of the Mechanically Stabilized Earth (MSE) walls with its main product family „Terramesh“. This is a well-known system used in Europe and in the rest of the world to support or enable the construction of infrastructures in tight urban corridors, forming retaining walls, road embankments, wing walls and bridge abutments known as Geosynthetic Reinforced Soil-Integrated Bridge Systems (GRS-IBS).

„Terramesh“ double twist steel wire mesh reinforcements have been used in combination with ParaLink® and Paragrid® geogrids representing an evolution and a significant advantage for both cost-effectiveness and performance. The project includes 15.000 facing sqm of „Terramesh Green®“, 14.000 facing sqm of „Terramesh Mineral® and System® and 5.000 facing sqm of gabion cladding.

Soluzione

The maximum retaining height of the direct bridge abutment called G03 is 13m with a front inclination of 85°. For the front Terramesh units were used, while for the main reinforcement, ParaLink and Paragrid geogrids were laid with a nominal tensile strength from 150 kN/m up to 700 kN/m. Main challenges have been encountered in the optimization and computation of the materials during the design processes, which have been made with the combined use of LEM, FEM, and BIM technologies, and mainly during installation due to the strict restrictions given by demanding geometry of the facing of the structures provided in the design. The geometry of the constructed structures has been checked with in situ testing, resulting in consistency within the design tolerances with a maximum measured vertical settlement of 160mm.

Scarica
la Storia di Successo

Scarica

I nostri prodotti per
questa Storia di Successo

Mettiti in contatto con noi

Se sei d'accordo con l'Informativa sulla Privacy dell'azienda e ne hai compreso il contenuto, il Titolare del trattamento ti chiede se acconsenti al trattamento secondo le modalità previste dall'informativa sulla privacy dell'azienda per l'invio di comunicazioni promozionali relative ai servizi/alle attività offerte dal Titolare del trattamento. *

Inoltre, il Titolare del trattamento ti chiede se dai il tuo consenso alla comunicazione dei tuoi dati personali alle Affiliate Maccaferri, e al conseguente trasferimento extra-UE che ne potrebbe derivare, per finalità proprie di queste ultime, incluse quelle di natura promozionale (invio di comunicazioni di marketing) *