BARRAGEM CAMPEIRA - CRISTALÂNDIA

Anno
2022
Località
CRISTALÂNDIA - TOCANTINS - Brasil
Cliente
IMPERMAX ENGENHARIA LTDA
Progettista
HATCH CONSULTORIA

Sfida

The Campeira Dam is responsible for supplying water to the city of Cristalândia (TO) for most of the year. A few years ago, after intense periods of rainfall, the dam's spillway, which was 7 metres wide, was not sufficient to release all the excess water from the reservoir, causing it to overflow and consequently the erosion of the shoulders and the dam's structure to be compromised.

Soluzione

After complex hydrological studies, the dam was resized. The width of the spillway was increased to 125 metres and it was lined with PoliMac® gabions, which made up the whole: sill, staircase and dissipation basin. The choice of technology made it possible to build an efficient hydraulic energy protection and dissipation structure with high abrasion resistance.

Scarica
la Storia di Successo

BARRAGEM CAMPEIRA - CRISTALÂNDIA

Scarica
BARRAGEM CAMPEIRA - CRISTALÂNDIA

I nostri prodotti per
questa Storia di Successo

Mettiti in contatto con noi

Se sei d'accordo con l'Informativa sulla Privacy dell'azienda e ne hai compreso il contenuto, il Titolare del trattamento ti chiede se acconsenti al trattamento secondo le modalità previste dall'informativa sulla privacy dell'azienda per l'invio di comunicazioni promozionali relative ai servizi/alle attività offerte dal Titolare del trattamento. *

Inoltre, il Titolare del trattamento ti chiede se dai il tuo consenso alla comunicazione dei tuoi dati personali alle Affiliate Maccaferri, e al conseguente trasferimento extra-UE che ne potrebbe derivare, per finalità proprie di queste ultime, incluse quelle di natura promozionale (invio di comunicazioni di marketing) *