Storie di successo
44 YEAR OLD GABION STRUCTURE
As the cliff was above the normal high tide level, it was considered sufficient to construct a stepped retaining wall from massVisualizzastar
50 YEAR OLD GABION STRUCTURE, RIVER HUMBER
A ‘half-tide’ gabion wall, 2m high on an 18m wide gabion apron (0.5m thick). The volume of protection was approximately 13,Visualizzastar
A2 / A282 JUNCTION IMPROVEMENTS
The project team needed a solution that steepened the slope, thereby reducing the land take and saving the hedgerow. The main Contractor on the projecVisualizzastar
AGRIPORT, MAYDON WHARF
A raft foundation of Paralink ™ basal reinforcement was found to be the most cost-effective solution for this problem. Piled foundations would have Visualizzastar
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
Maccaferri provided support to the project team and proposed the MacWall Landmark segmental reinforced soil wall system. MVisualizzastar
ALLARGAMENTO PISTA DA SCI “PISTA ALOCH” POZZA DI FASSA (TN)
Al fine di allargare la pista da sci, si è reso necessario alzare la quota del terreno in prossimità della sponda della pista. Si è quindi realizzaVisualizzastar
ARTESANO GALLERIA
The retaining walls were designed using a gravity gabion retaining system. The architectural boundary walls were defined with a maximum thickness of 5Visualizzastar
ASTON HOTEL ANYER BREAKWATER STRUCTURE
Breakwater is often constructed out of rocks or concrete, forming a wall or a submerged barrier parallel to the shore. Maccaferri Indonesia proposed tVisualizzastar
ATI PORT EXPANSION
In order to address the challenge of improving the port expansion grounds at the Manila South Harbor, Asian Terminals Inc. (ATI) is implementing a cosVisualizzastar
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErVisualizzastar
AZUDES SITIO RAMSAR RÍO DESAGUADERO
To date, two of the six planned weirs have been constructed. For the construction of the curtain, approach works and the dissipation basin, gabion boxVisualizzastar
BARRAGEM CAMPEIRA – CRISTALÂNDIA
After complex hydrological studies, the dam was resized. The width of the spillway was increased to 125 metres and it was lined with PoliMac® gabionsVisualizzastar
BASE AERONAUTICA MILITARE
La tecnologia dei gabbioni chiodati ha permesso di incrementare le caratteristiche geotecniche di lavoro della gabbionata e contestualmente rinforzareVisualizzastar
BAY BRIDGE, CALIFORNIA, 112-FOOT-TALL VEGETATED RSS
Caltrans designed a 112-foot-high reinforced soil slope, sitting on top of a 21-foot-high Terramesh® system mechanically stabilized earth (MSE) wall Visualizzastar
BE-ANTWERP MALINAS
The construction company firstly layed the ParaLink 950 rolls as indicated by Maccaferri´s technicians to create a stable foundation for the planned Visualizzastar
BE-MECHELEN R6
The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the CUR normative (Netherlands). Since tVisualizzastar
BEAVERNETTING EVERTSOORD
The company Texion Geosynthetics NV, partner of Maccaferri for the BeNeLux market, provided full assistance, proposing a solution with the so-called bVisualizzastar
BELFAST HARBOUR
The works included dregging of the new berth and approaches. This involved the disposal of 500,000m3 of material to sea with trVisualizzastar
BOB 230KV SWITCHYARD
Maccaferri worked in coordination with Power Engineers to develop a proposal that included drawings, calculations and specifications for the channel aVisualizzastar
BONHILL, STIRLING ROAD
Maccaferri was approached by Barratt Homes to come up with a suitable solution for the posed site problems. It was agreed that Visualizzastar
BONIFICA DISCARICA PONTONE PONTONICCHIO LESINA FOGGIA
Il progetto comprende un programma di Messa in Sicurezza (MISP) della vasta area di discarica (11 ettari ovvero l’equivalente di 14 campi da calcio)Visualizzastar
BONIFICA E RIPRISTINO AMBIENTALE DELLA DISCARICA COMUNALE
L'impiego del sistema terramesh Liner costituito dal sistema Terramesh Verde o Liner con inserito all'interno un cassero sul quale è stato poVisualizzastar
BORDERS RAIL
Maccaferri's gabions were used to support widened cuttings extensively along the 35-mile route which connects Edinburgh to Visualizzastar
BOSCASTLE FLOOD DEFENCES
To achieve this solution, Halcrow specified a combination of Reno Mattresses and MacMat-R from Maccaferri. Over 7000 sq metres of Maccaferri wire meshVisualizzastar
BROOMLANDS PRIMARY SCHOOL
Once the overall design had been agreed, Maccaferri was engaged to design, supply and install 8 free standing gabion walls which totalled 78.8m in lenVisualizzastar
BRUG VAN DEN AZIJN
Two 300 m long reinforced soil ramps up to 10.5 m high were designed by Maccaferri. The system chosen is called MacRes and it is comprised of concreteVisualizzastar
BUILDING OF THE HEAD OFFICE- GROUPE CHARIER
As part of this project, the company France MACCAFERRI created a facade cladding and a set of free walls in electro-welded gabions. The gabion claddinVisualizzastar
CANTERA ZIORDIA
To secure the area, two types of actions were carried out: 1. An active solution to prevent the larger blocks from being mobilised. This system consisVisualizzastar
CATO MANOR PIPELINE & ROAD PROTECTION
Maccaferri Africa /African Gabions was asked to propose a structure that would retain the affected road embankment. The proposed structure was a combiVisualizzastar
CHOI YING ESTATE DEVELOPMENT
Maccaferri Gabions are cages which are engineered from double twisted hexagonal woven steel wire mesh. Delivered flat-packed, our gabions are assembleVisualizzastar
CLIPPER WASH BANK PROTECTION
A gabion groyne system was selected to protect the bank from erosion and restore the limits of the bank to its original position. Groynes are finger-lVisualizzastar
CLOSE ROAD – RIO RUIDOSO CROSSING STRUCTURE
The proposed channel is approximately 28 feet wide and 6 feet tall. The proposed channel sidewalls will be stabilized with gabiVisualizzastar
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
Existing rubble mound breakwater was planned to be extended towards sea by about 500m using geotextile tubes (MacTube). The purpose was to reduce the Visualizzastar
COBHAM SERVICES HGV PARKING AREA EXPANSION
The proposal was to increase the HVG parking numbers by 79 new spaces, to the west of the petrol filling station. The proposal Visualizzastar
COLLEY LANE SOUTHERN ACCESS ROAD
The ParaLink LTPs will transfer loads of the mechanically stabilised earth walls into the pile foundations beneath. The maximum heightVisualizzastar
CONSOLIDAMENTO “RUPE PIAZZA NUOVA” – NUMANA (AN)
Dopo l’analisi di stabilità globale del pendio, si sono analizzate le diverse problematiche, ricercando soluzioni ad hoc per ciascuna: • fenomeniVisualizzastar
CONSOLIDAMENTO DELLA RUPE DEL CENTRO STORICO DI CASTIGNANO (AP)
Al fine di salvaguardare i fabbricati del centro storico di Castignano e di mettere in sicurezza l'asse viario situato al di sotto della rupe, è Visualizzastar
CONSOLIDAMENTO DELLA RUPE DEL CENTRO STORICO DI CASTIGNANO (AP)
Al fine di salvaguardare i fabbricati del centro storico di Castignano e di mettere in sicurezza l'asse viario situato al di sotto della rupe, è Visualizzastar
CONSOLIDAMENTO DELLA RUPE DEL CENTRO STORICO DI CASTIGNANO (AP)
Al fine di salvaguardare i fabbricati del centro storico di Castignano e di mettere in sicurezza l'asse viario situato al di sotto della rupe, è Visualizzastar
CONSOLIDAMENTO PARETE ROCCIOSA NORD EX CAVA DI MASO
La soluzione messa in opera ha previsto la realizzazione di un'opera di sostegno in terra rinforzata avente un'altezza complessiva pari a 35 mVisualizzastar
CONSOLIDAMENTO VERSANTE PRESSO RACCORDO R43 – AUTOSTRADA A1
L'intervento di consolidamento ha previsto, oltre alla realizzazione di nuove reti in aderenza e alla manutenzione di quelle esistenti, la costruzVisualizzastar
CONSTRUCTION DE LA ROUTE DE LA CORNICHE DE BRAZZAVILLE
The Paraweb® MD45 geoband reinforcements were used and perfectly adapted to the intermediate material embankments (Type 3 according to NF EN 14475). Visualizzastar
ÇÖPLER GOLD MINE ROCK FALL PROJECT
In accordance with the urgency of the situation, the size of the potentially dangerous rocks on the slope and in line with the technical and economic Visualizzastar
DANFOSS FACTORY
Maccaferri were approached by Quattro Consult Limited in July 2021 to propose a suitable high strength geogrid for use as a basVisualizzastar
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
Maccaferri worked with Wood Patel Engineering to design a hydraulic solution for the microprocessor manufacturer TSMC. To reduce the soil erosion alonVisualizzastar
DEBRIS FLOW PROTECTION LERINI STREAM
After a fierce challenge against the competitor, Maccaferri Balkans won this project thanks to a mix of high performing technical solutions, cost effeVisualizzastar
DILMUNIA GRAND CANAL & MARINA (DGCM)
The construction of the Dilmunia canal is the object of an international Tender. The tender design for the waterproofing works has been developed by tVisualizzastar
DISCARICA DI BELLOLAMPO V VASCA
La realizzazione della vasca prevede l'impiego di una membrana in HDPE, di un gesontetico bentonitico e di un gecomposito drenante per la captazioVisualizzastar
EROSION CONTROL AGAINST MAMMAL BURROWING
Maccaferri was approached by contractors Crown Services Ltd and asked for advise on a suitable steel wire mesh system that could provide the required Visualizzastar
EROSION CONTROL AT CISUMDAWU TOLL ROAD-PHASE II-TUNNEL AREA
The inclination of the slopes is 45° degree (V:H = 1:1), referring to Public Works Ministry Specification “Spesifikasi Khusus Interim SKh-1.3.17 PeVisualizzastar
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
Maccaferri has proposed the erosion control system consisting of rolled erosion control products (RECP)-MacMat R (Steel reinforced synthetic geomat) aVisualizzastar
EXPO HOUSE di DOHA EXPO 2023
Maccaferri è stata scelta come fornitore tecnologico per il GREEN COVER SYSTEM, grazie all'ampia gamma di prodotti geosintetici nel nostro portafVisualizzastar
EXTENSION OF THE CHANTERAINES PARK
The Conseil Général 92 chose double-twist gabion cages because they allow the filling materials to show through easily. The infill stone chosen comeVisualizzastar
FESTIVAL SUPERMALL MOUND PROMONTORY
After several discussions with FLI engineers, Maccaferri’s robust erosion protection geoblanket (MacMat R) has been approved for the project. DueVisualizzastar
FLOOD EMERGENCY RESPONSE PROJECT
In May 2019, before the flood reached its peak, the city was able to create flood control barriers using FlexMac DT in multiple strategic locations toVisualizzastar
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
Maccaferri proposed the use of the MacWall Vertica 4° Segmental Block Retaining Wall System. The 4° batter of this system creVisualizzastar
FV17 LIAFJELLET-OLVIKVATNET
Maccaferri, in cooperation with its local partner PRETEC AS, proposed an optimized solution to the contractor and the investor, aimed at enhancing theVisualizzastar
Gabion Defense – Cajuca East Corridor
The Provincial Municipality of Nazca was in charge of the technical file through its technical study department. The hydraulic approach they determineVisualizzastar
GABION WALLS FOR SAHARA AAMBY VALLEY CITY
A series of self-draining, flexible, eco-friendly Gabion walls have been provided in Sahara Lake City along external/internal roads, mini club area, cVisualizzastar
HAROLD COURT EAST REGIONAL SERVICE CENTER
The project was initially designed as a series of 9 ft. tall gravity retaining walls along the steep slope with 10 ft. terraces in between. The challeVisualizzastar
HASANKEYF ARCHEOPARK PROJECT
The retaining walls, which will reach a height of 27 meters within the scope of the Hasankeyf archeopark project, has been designed with Terramesh SysVisualizzastar
HENNEAULAAN ZAVENTEM
Maccaferri´s Corporate Technical Department, in cooperation with the local partner TEXION, has proposed an optimised solution with has supported the Visualizzastar
HUHUGAM HERITAGE CENTER
The aesthetics of gabions were desirable, yet a traditional gabion retaining structure would be very expensive. Therefore Maccaferri suggested the useVisualizzastar
INTERVENTI DI PROTEZIONE DA CADUTA MASSI S.P. 120 – SARNANO (MC)
Al fine della messa in sicurezza dell'asse viario e in particolare di predisporre una protezione dalla caduta di materiale detritico sul tratto diVisualizzastar
INTERVENTO DI AMPLIAMENTO DISCARICA VILLADOSE
Il progetto ha previsto la costruzione di vasche di contenimento con terre rinforzate drenante, che per la particolare natura dei terreni presenti in Visualizzastar
IPO DAM SILT CURTAINS
To address the degradation of the Ipo Dam and mitigate the adverse effects of soil erosion and water contamination, various long-term solutions are beVisualizzastar
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
Byrne Looby and Partners were engaged by main contractor Siac Ltd, to value engineer the originally designed proposals as detailed on the project drawVisualizzastar
KOSOVO MOTORWAY PROJECT
Mainly, seven Paramesh system walls have been built: WL 015, WL 024, WL 060, WR 131, WR 134, WR 139, WR 406. The main products used are Terramesh SystVisualizzastar
KURINGEN BRIDGE 19
The new bridge in Kuringen is built according to the principle of generic bridges used at various locations along the Albert Canal. The bridge has beeVisualizzastar
LÖTZGALERIE
The client chose the most economical system. The Maccaferri RB 3000 safety net with an energy of 3000 kJ and a height of 5 m. It was a great challengeVisualizzastar
LU-A13 DUDELANGE-BURANGE
The loads applied varied from 26 kN/sqm up to 44 kN/m2 in correspondence of the traffic lanes and 5 kN/sqm for the pedestrian and bicycle path. 4,000Visualizzastar
M606 MOTORWAY / M62 JUNCTION
Maccaferri’s double twist woven gabions have been used to create an approximately 450m, the combined length of road[1]side retaining wallVisualizzastar
MacSport AC Monza
Per il rifacimento del campo di allenamento, sono state coinvolte diverse aziende specializzate nel settore delle infrastrutture sportive, tra cui ItaVisualizzastar
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
Constructing a slope protection system along these road sections will promote the road's resiliency and is geared to improve the life and well-beiVisualizzastar
Marginal Protection for the Tonameca River
Emergency actions such as dredging and the establishment of temporary embankments were implemented. Subsequently, hydrological and topographic studiesVisualizzastar
MEERHOUT BRIDGE 34
The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the Belgian Annex. The possibility to moVisualizzastar
MESSA IN SICUREZZA DEI VERSANTI LUNGO LA STRADA STATALE SS 34
Sono stati progettati e realizzati sia interventi di tipo passivo che interventi di rivestimento laddove i costoni rocciosi erano a ridosso della sedeVisualizzastar
MESSA IN SICUREZZA PERMANENTE (MISP) AREA MALCONTENTA ZONA C
L’intervento nell’area Malcontenta zona C ha previsto la realizzazione di:1) diaframma plastico composito perimetrale realizzato con miscela di acVisualizzastar
MESSA IN SICUREZZA S.P. 89 VALFLUVIONE (AP)
Considerato lo stato dei luoghi e l’urgenza di messa in sicurezza della viabilità, sono stati realizzati interventi di rafforzamento corticale, preVisualizzastar
MESSA IN SICUREZZA S.S. 90 “DELLE PUGLIE” A SEGUITO INCENDIO
Per consentire la riapertura in tempi rapidi della strada statale, sono stati effettuati i primi interventi di sistemazione delle aree e per il riprisVisualizzastar
MESSA IN SICUREZZA VERSANTE SAN BENEDETTO BELBO
Le opere previste per il consolidamento del versante sono state rivolte al drenaggio del pendio.I lavori hanno previsto la realizzazione complessiva dVisualizzastar
MESSA IN SICUREZZA VIABILITÀ COMUNALE – GIUNGANO (SA)
Al fine di mettere in sicurezza la viabilità comunale e di proteggere gli edifici residenziali del centro storico esposti al rischio di cauta massi, Visualizzastar
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
The comprehensive solution involved Maccaferri's expertise and a strategic selection of materials to optimize the environmental remediation procesVisualizzastar
MINE D’OR DU TASIAST MASSIF DE L’ADRAR
The Terramesh® system is a system that combines a gabion facing with a continuous wire mesh reinforcement of the facing. The gabion part ensures a neVisualizzastar
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
Maccaferri worked in a JV to implement slope stabilization solutions for landslide zone between Km 504.00 to Km 505.00 on NH-58. It included shifting Visualizzastar
MITIGAZIONE RISCHIO CROLLI S.R. 44
Officine Maccaferri Italia ha supportato la progettazione della messa in sicurezza, che comprende a sua volta due interventi. Sono state installate, pVisualizzastar
MIXED RSS FOR THE RRESHEN-KALIMASH HIGHWAY
Bechtel-Enka brought in geotechnical specialists, Officine Maccaferri in a partnership arrangement to provide engineering design solutions for the walVisualizzastar
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
The technical studies carried out indicated that the best solution to the problem presented, among others found on the market, would be two gabion retVisualizzastar
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
The constructor together with the external supervision and the SICT residence analysed different alternatives for the required retaining works, and thVisualizzastar
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of products in our portfolio that can achieve thVisualizzastar
NEW AIRPORT IN MOUNTAINOUS REGION
The cut-and-fill operations would enable the insertion of the 2,800m runway and airport buildings. To stabilise and reinforce the ‘fill’ (valley) Visualizzastar
NEW SHARJAH-KHORFAKKAN ROAD
From the previous successful experience of Terramesh system walls, the consultant approached Maccaferri Middle East to propose Terramesh MSE walls as Visualizzastar
NUOVA PISTA CICLABILE LUNGO IL TORRENTE ARZILLA A FANO
L'opera in gabbioni verdi si è rivelata essere la soluzione più adeguata non solo grazie alle sue prestazioni strutturali, ma anche grazie alla Visualizzastar
Ocean Farm 1 – Supply of KikkoNet Net and Net Structure
As a supplier of the new net pen in this project, Maccaferri is in charge of supplying the KikkoNet containment net and its built-in structural reinfoVisualizzastar
OOSTERWEEL VERBINDING -LINKEROEVER, BFL03
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aVisualizzastar
OOSTERWEEL VERBINDING -LINKEROEVER, G17
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aVisualizzastar
OOSTERWEEL VERBINDING -LINKEROEVER, K13+G16
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aVisualizzastar
OPERA DI SOSTEGNO IN TERRA RINFORZATA PER NUOVO HUB AMAZON
Per la realizzazione dell'opera di sostegno del piazzale è stata scelta una soluzione mista, composta per i primi 6 metri di altezza da una terraVisualizzastar
OPERE DI DIFESA – “LIVINALLONGO DEL COL DI LANA/STRADA PALLA-AGAI”
Nell’intervento in oggetto sono stati installate delle barriere paramassi tipo RB 2000 con altezza di intercettazione pari a 4,0 m, al fine di proteVisualizzastar
OPERE DI SOSTEGNO E78 SIENA – GROSSETO
Sono stati realizzati circa 30.000 mq di faccia a vista di Terramesh Verde combinato con geogriglie ad alta Resistenza Paralink impiegati a sostegno dVisualizzastar
PARAMESH WALL FOR BAJO – MALAWATAR ROAD SEGMENT
The Retaining Wall Structure for Bajo – Malawatar Road Segment is constructed using Paramesh System with a height of 8.5m, consisting of a TerrameshVisualizzastar
PASSAGEM INFERIOR DA RODOVIA BR-101 EM ESCADA
A containment and verticalization project for the meeting embankment was implemented using the reinforced soil system with the Terramesh System wall. Visualizzastar
PEACE BRIDGE
A 40m long,8m high Green Terramesh® reinforced soil abutment wall to surround and support the high-level bridge bank seat and integrate seamlessly wiVisualizzastar
Perilago Path – Reconstruction of Route 82
The most adequate solution for the needs of the work was the reinforced soil. The structure was designed with TerraMesh™ System, the built wall has Visualizzastar
PODLJUBELJ ROCKFALL PROTECTION
MACCAFERRI engineers inspected the site just after the rockfall event to assess and evaluate the scale of the problem and the boundary conditions. MAVisualizzastar
PRESA FRANCISCO ABELLÁN
To protect users and maintenance personnel from possible landslides, a specific solution has been chosen for each situation.To ensure the stability ofVisualizzastar
PRESTONS ROAD FLYOVER
The avoidance of surcharge on the tunnel and the potential for differential movement were resolved by supporting the approach rVisualizzastar
PROTEÇÃO COSTEIRA COM GABIÕES
To protect and control erosion, PoliMac™ box-type gabion containment was used, together with a PoliMac™ Reno® mattress, used at the pipe outlets,Visualizzastar
PROTECTION OF PROMENADE DES ANGLAIS IN NICE
The Nice-Côte-d’Azur municipality decided to install an anti-incursion barrier on the Promenade des Anglais to guarantee the safety of pedestrians.Visualizzastar
PROTEZIONE CADUTA MASSI – S.P. 477 DI CASTELLUCCIO DI NORCIA (PG)
Considerato lo stato dei luoghi, l’ampiezza dell’area oggetto di possibili distacchi e l’urgenza di messa in sicurezza della viabilità, è statVisualizzastar
RADDOPPIO LINEA CIRCUMVESUVIANA
Da analisi in condizioni sismiche (ma anche statiche) si può notare che non vengono garantiti adeguati fattori di sicurezza di stabilità globale, inVisualizzastar
RAILWAY EMBANKMENT BURROWING PREVENTION
Maccaferri’s Anti-Burrowing Mesh has been proven to be a strong rodent deterrent. Unlike any plastic grids or thin rabbit netVisualizzastar
REALIZZAZIONE DI DRENAGGI PROFONDI (TRINCEE DRENANTI)
Si prevede di realizzare un intervento atto all'abbattimento della superficie freatica e, nello stesso tempo, alla riprofilatura del versante con Visualizzastar
REDEVELOPMENT OF “PINETA” TRAINING CENTER
Our partner Limonta Sport Spa decided to include MACSPORT in their LND (Italian FA) approved system to allow the best drainage capacity combined with Visualizzastar
REDROW HOMES DEVELOPMENT
The excavated chalk was originally scheduled for landscaping and offsite disposal. However, contractor GDL, their designers GES and Maccaferri determiVisualizzastar
Rehabilitation due to Undermining in Villalobos
An environmentally sustainable engineering solution will be implemented. Technologies such as Terramesh System and Macgrid WG will be used to stabilizVisualizzastar
Reinforced Soil Retaining Structure and Slope Reinforcement
The client required a solution that met technical, architectural, and environmental requirements, incorporating a green face to transform the retaininVisualizzastar
REINFORCED SOIL WALL AT ABUTMENT OF BRIDGE- 43 IN REASI, J&K
Based on the site conditions and specific requirements of the client, Terramesh units made of gabion fascia along with an integrated tail as reinforceVisualizzastar
Reinforced Soil Walls and Slope Reinforcement in HUARAZ – ANCASH – Perú
The major challenge was to propose a reinforced soil wall with a considerable height of 19 meters using the technical-economic competitiveness of the Visualizzastar
REPAIR AND IMPROVEMENT OF OUELLETTE DRAIN WEST OUTLET
RC Spencer Associates Inc., a reputable engineering firm in the Windsor area, was tasked by the Town of Amherstburg to devise aVisualizzastar
RESTORATION OF THE ROAD LINK RR 128 AIN OCTOR – KORBOUS
The acrobatic works company, Hydrokarst, based in France, solicited Maccaferri to propose solutions for protection against rockfalls. Several types ofVisualizzastar
RETENTION WORKS FOR YADAGIRI GUTTA TEMPLE AREA
The site of the presidential suite building area is on hilly terrain and the foundation strata is completely rock. The height of the retention is varyVisualizzastar
RINGFIETSPAD ANTWERP
Mainly, four different types of facing inclinations have been used for this project: 27°, 34°, 45° and 60° The main product used is Terramesh GreeVisualizzastar
RISPRISTINO E MESSA IN SICUREZZA SP7-SP194, ACQUASANTA TERME (AP)
Per mettere in sicurezza le scarpate sono stati necessari una serie di interventi di rafforzamento corticale con rivestimento flessibile mediante la sVisualizzastar
Road stabilization in Totonicanapá
The use of mono-oriented MacGrid WG geogrids integrated into the Terramesh system offers a superior technical solution for the containment project in Visualizzastar
ROB FOR CONNECTIVITY BETWEEN MUNDRA AND NH 8A
The stone column technique, also known as vibro-replacement or vibro-displacement, is a ground improvement process where vertical columns of compactedVisualizzastar
ROCK SUPPORT IN VÍCAR, ALMERÍA
To address this problem, the following support measures were implemented:LEA 300-8 cable net with a tensile strength of 130 kN/m and a puncture resistVisualizzastar
ROCKFALL MITIGATION WORKS- RAILWAY LINE-NEAR CH 14 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. RVisualizzastar
ROCKFALL PROTECTION AT SIMPANG PULAI, PERAK, MALAYSIA
Based on the rockfall trajectory analysis, the design energy level required is 2000 kJ. Flexible barrier with post height of 4m in installed over 500mVisualizzastar
SADAWARNA DAM PARAMESH WALL
The Retaining Wall Structure for Stilling Basin in Sadawarna Dam is constructed using Paramesh System with a height of 5m, consisting of the TerrameshVisualizzastar
SAFETY WORKS ON THE RD 900 IN THE ROCHAILL SECTOR
As part of the MBC project in the Alpes de Haute Provence department, EPC France called on France Maccaferri to provide a wide range of solutions for Visualizzastar
Second Stage MME at Puerto Escondido Airport
To strengthen the embankment, a longitudinal containment structure was designed and built, combining gabion walls and the Terramesh System along with Visualizzastar
SISTEMAZIONE AREA LIMITROFA ALLA POSTAZIONE DEL POZZO PISTICCI 19
E’ stata realizzata un’opera di sostegno in terra rinforzata Paramesh con paramento in pietrame, lunga 175 m e alta 6 m, realizzata con elementi dVisualizzastar
SISTEMAZIONE DISCARICA ABBANDONATA DI CAVA DE TIRRENI
La soluzione di Maccaferri alle sfide ambientali poste dalla discarica abbandonata di Cava de’ Tirreni prevedeva l’applicazione di geosintetici aVisualizzastar
SISTEMAZIONE FRANA PRESSO STABILIMENTO BENELLI ARMI (PU)
Per questa situazione è stata ritenuta idonea la realizzazione di un'opera di sostegno a gravità del tipo muro in gabbioni, accompagnata da una Visualizzastar
SISTEMAZIONE IDRAULICA SUL FIUME METAURO
La realizzazione di un'opera di sostegno in gabbioni si è rivelata, grazie alla flessibilità che la caratterizza, la soluzione più adeguata perVisualizzastar
SISTEMAZIONI IDRAULICHE INVASO DI CAMPOLATTARO
Per evitare il degenerare di questi fenomeni sono state progettate e realizzate dalla Provincia di Benevento (ente gestore dell’invaso) una serie diVisualizzastar
SLOPE PROTECTION MEASURES- RAILWAY LINE- NEAR CH 13 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. VVisualizzastar
SLOPE STABILIZATION AND PROTECTION AT ULU SLIM RIVER, PERAK
After careful considerations, Jabatan Kerja Raya (JKR) Batang Padang adopted Maccaferri Gabions Retaining Wall to solve this problem and increase safeVisualizzastar
Small green lung in the Metelliana Valley
Maccaferri’s solution to the environmental challenges posed by the abandoned landfill in Cava de’ Tirreni involved the application of advanced geoVisualizzastar
SMRITIVAN EARTHQUAKE MEMORIAL
Maccaferri was involved in the supply, design and supervision of double twisted, mechanically woven gabions structures for the project. Gabions designVisualizzastar
SNCF LINE 930 000 FROM MARSEILLE TO VINTIMILLE
The work involved installing 3 lines of protective screens on the rock faces located on the slope and in the access trench to the Cap Martin tunnel, fVisualizzastar
SPOORLIJN 51A – ZWANKENDAMME
The tender specifications were very strict asking PVA geogrids that were provided by the local partner Texion Geosynthetics NV, while Maccaferri supplVisualizzastar
St Andrews Royal & Ancient Golf Club
The approved scheme was designed by HR Wallingford, to include both ‘hard’ and ‘soft’ engineering solutions and the contract was supervised byVisualizzastar
STRENGTHENING OF THE ROADBED LAYER OF THE RN4
Initially, a granular drain mat was installed at the PST (Upper Part of Earthworks) level to capture flows and percolations from surrounding water basVisualizzastar
STRUTTURE IN TERRA RINFORZATA – “VARIANTE DI MORBEGNO” (SO)
La realizzazione di opere in terra rinforzata si è rivelata essere la soluzione più adatta e vantaggiosa ai problemi di stabilizzazione del terreno Visualizzastar
SUMELA MONASTERY ROCKFALL PROTECTION PROJECT
Within the guidelines of a technical committee consisting of several professors from various, prestigious technical universities of the country, MaccaVisualizzastar
SUNSET CLIFF
The solution adopted for the Sunset Cliff walls consists of two types of systems:Gravity walls using gabions for walls with heights less than 6 metersVisualizzastar
TELAL EL SOKHNA’ PROJECT
Maccaferri’s Paramesh MSE Wall system (with Terramesh facia units & Paralink geogrids) was eventually implemented, being a cost and time-effectiVisualizzastar
TERRAMESH RD PATRIMONIAL
The slope, characterized by its steep incline, created a challenging situation that required the implementation of containment measures to ensure the Visualizzastar
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
Firstly we redesigned the solution using Terramesh units with dimensions 3x3x1x1m. To ensure stability, Terramesh System was reinforced with ParaVisualizzastar
TERRAMESH® VERDE CARRETERA MATARANI KM. 24
This road uses engineering solutions with reinforced soil walls, Terramesh® System and Terramesh® Verde, which economised the project by saving on bVisualizzastar
TERZO VALICO DEI GIOVI – GENOVA JUNCTION
Maccaferri proposed an innovative approach involving Automated Tunnel Ribs HEB 300 complete with automated hinges and automated links (covering a lengVisualizzastar
test italia
Se recomendó realizar un muro Terramesh® System PoliMac™ en todo el perimetro trasero, con altura máxima de 9.0m, para evitar problemas futuros. Visualizzastar
The Ash Yard of the Thermal Power Plant
The creation of cells was carried out, protected with geosynthetics both at their base and in the closure, with three levels of impermeable protectionVisualizzastar
THE EXTENSION OF SITARSKA STREET OVER THE RAILWAY TRACKS
The MacRes system with concrete facing was proposed as a technology for retaining wall because of the space limitations and fast installation. The MacVisualizzastar
THE GRAND BOHEMIAN HOTEL
Initially, the project specifications called for S8 Aluminum anchors to be driven to a depth of 16'. However, during the installation, numerous prVisualizzastar
THE NEW ROUTE DU LITTORAL
The solution defined by the project management for the landward embankments was a geosynthetic stiffened embankment with a double-twist gabion facing.Visualizzastar
THREE CITIES TRAIL
The civil engineers at Halff successfully designed and implemented a tie-back reinforced gabion retaining wall to act as the slVisualizzastar
TK 2018 – 006 – MRV
The solution adopted for this construction case involves a rectangular channel with cross-sectional heights varying between 2 and 4 meters. Gabion BoxVisualizzastar
VARIANTE DI VALICO
Nella Tratta: Aglio-Barberino – Lotto 12 si osservano svariate Terre rinforzate con paramento rinverdibile a mascheramento degli imbocchi delle gallerVisualizzastar
VASCA DI ACCUMULO IN TERRE RINFORZATE – GROTTAMINARDA (AV)
La vasca di accumulo è inserita in un’ansa del Torrente S. Nicola. La particolare orografia e forma dell’area di sedime ha richiesto l’utilizzoVisualizzastar
Village Brow, Crawfordsburn
Maccaferri Green Terramesh Reinforced Soil Slope was proposed and accepted as an appropriate solution. The total length of the slope was 70m, reachingVisualizzastar
VOID SPANNING IN HOUSING DEVELOPMENT
The Developer’s Engineer approached Maccaferri to providedesign and supply of a high-strength geogrid solution. The proposed site topography was comVisualizzastar
WALTHAM HIGH SCHOOL
Based on the rock wall’s height, geotechnical characteristics and the proximity of it to the school, a pinned drapery solution was the recommended mVisualizzastar
YELLOWSTONE HWY 20
The barrier was impacted on May 27, 2019, the opening day of summer travel to Yellowstone National Park. Wyoming DOT was notified of the large rockfaVisualizzastar
Non hai trovato quello che stavi cercando?
Contatta i nostri esperti
Rappresentiamo un partner vincente per il complesso mondo delle costruzioni civili e industriali. Grazie a una vasta gamma di prodotti, siamo in grado di rispondere alle varie esigenze tecniche del settore: dal drenaggio alla protezione, dalla gestione dell’acqua all’impermeabilizzazione di strutture e rivestimenti, fino al risparmio energetico e al comfort abitativo, al controllo del vapore e alle problematiche correlate.