NANJUNG TUNNEL EROSION CONTROL

Home > Success stories > NANJUNG TUNNEL EROSION CONTROL

Slope Protection

2020

BANDUNG - WEST JAVA - Indonesia

BBWS CITARUM

NANJUNG TUNNEL EROSION CONTROL

Problem

Nanjung Tunnel Project is located in Bandung, West Java, Indonesia. This tunnel is built to facilitate the flow of the Citarum River, so that it can overcome the flooding in Bandung. The operation of the Tunnel is intended to reduce the flooded area from the initial 490 hectares to 80 hectares. The surrounding slopes around the tunnel need to be protected from the potential erosion. The slope which is mainly composed of fine-grained soil required protection from erosion created by rain and surface water flow. The selection of the right solution is necessary in order to prevent failure by the presence of water. Erosion Control Solution by Maccaferri Indonesia was selected considering its ability to allow surface seepage and to grow vegetation (LCC – Legume Cover Crop).

Solution

An Erosion Control System made of a combination between HDPE geomat and double-twisted wire mesh panel with longitudinal high tensile strength steel cables called Macmat HS was installed on the slopes. An array of mulching contained of seeds was then applied onto the Macmat HS to bring vegetation. The vegetation shall bring the nature back as rehabilitation. Available in rolls, Macmat HS has an easy installation procedure with the support of a T-shape deformed bar to hold the mesh onto the cut slope. Maccaferri Erosion Control System shall grant some advantages such as: Easy and Quick Installation; Allows drainage on the surface of the slope; Allows vegetation as rehabilitation; Capable for combination with Soil Nailing; Suitable for steep slopes.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.