KURINGEN BRIDGE 19

Year
2021
Location
KURINGEN - VLAANDEREN - Belgium
Client
Texion Geosynthetics NV
Designer
Arcadis NV / Sweco

Challenge

With almost 40 million tons of goods transported, the Albert Canal is the most important waterway in Flanders from an economic point of view and a crucial hinterland connection between the port of Antwerp, Limburg, the Antwerp Kempen, and the Liège region. The Albert Canal has already been given a major facelift over the years to cope with growing traffic. And a further upgrade is now underway to make the Albert Canal even more attractive for businesses in the near future, thus encouraging a move to waterborne transport. In this way, inland navigation contributes to the solution for traffic congestion in Flanders. To make this possible, De Vlaamse Waterweg nv is putting a lot of effort into upgrading the Albert Canal. Today, the vertical clearance of the current bridges is still too limited. All bridges will therefore be systematically raised to 9.10 meters. The width under the bridges will also be increased. At the end of April 2019, De Vlaamse Waterweg appointed the nv Via T Albert to rebuild another eight bridges over the Albert Canal. These are the bridges in Beringen, Paal-Tervant, Meerhout-Vorst, Lummen, OelegemII (Ranst), Herentals (Herenthoutseweg), Kuringen, Hoogmolenbrug (Schoten).

Solution

The new bridge in Kuringen is built according to the principle of "generic bridges" used at various locations along the Albert Canal. The bridge has been raised about 2 meters to 9.10 m clearance height. The canal has been widened from 50 m to 86 m. Characteristics of the new bridge Length of bridge: 123 m Height of arch: 22 m above the road surface The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the Belgian Annex. The possibility to modify the units to follow the exact shape of the bridge has been very well appreciated by the contractor FRANKI, that later chose the same system for the next bridges on the Albert Canal, like in Hoogmolenbrug and Kuringen. In this case, the original plan was to have a slope inclination equal to 70°. to respect this design requirement Maccaferri prosed to use 70° Green Terramesh element installed on the bridge embankment.

Download
the Success Story

KURINGEN BRIDGE 19

Download
KURINGEN BRIDGE 19

Our products for
this Success Story

Get in touch with us

If you agree with the company's Privacy Policy and understood its content, the Data Controller asks you if you consent to the processing in manner provided in the company's privacy policy for sending promotional communications of the services / activities provided by the Data Controller. *

Furthermore, the Data Controller asks you if you give your consent for the communication of your personal data to the Maccaferri Affiliates, and the consequent extra-EU transfer that may result, for their own purposes, including of a promotional nature (sending marketing communications) *