Πρόκληση

The Çöpler mine site is an open pit operation located 8 km away from Ilıc District of Erzincan City, approximately 550 km east of Ankara in Middle Anatolia with the capacity to process approximately 20,000 tonnes of oxide ore per day. During the extension of the waste storage area, rockfall from the rocky slopes next to the construction area forced the company to stop the construction temporarily in order to prevent damage on the membranes and to decrease the risk for the construction crew.

Λύση

In accordance with the urgency of the situation, the size of the potentially dangerous rocks on the slope and in line with the technical and economic conditions, Steel Grid HR100 has been installed on the steep slopes running along the waste storage area. The total area of approximately 30,000 m² has been installed in a time period of 4-6 weeks under the cooperation with our professional mountainer crew.

Κατεβάστε
την Ιστορία Επιτυχίας

ÇÖPLER GOLD MINE ROCK FALL PROJECT

Λήψη
ÇÖPLER GOLD MINE ROCK FALL PROJECT

Τα προϊόντα μας για
αυτή Ιστορία Επιτυχίας

Επικοινωνήστε μαζί μας

Εάν συμφωνείτε με την Πολιτική Απορρήτου της εταιρείας και έχετε κατανοήσει το περιεχόμενό της, ο Υπεύθυνος Επεξεργασίας σας ρωτά αν συναινείτε στην επεξεργασία με τον τρόπο που προβλέπεται στην πολιτική απορρήτου της εταιρείας, για την αποστολή διαφημιστικών ανακοινώσεων σχετικά με τις υπηρεσίες/δραστηριότητες που παρέχονται από τον Υπεύθυνο Επεξεργασίας. *

Επιπλέον, ο Υπεύθυνος Επεξεργασίας σας ρωτά αν συναινείτε στην κοινοποίηση των προσωπικών σας δεδομένων στις Συνδεδεμένες Εταιρείες της Maccaferri, και στην ενδεχόμενη εξωενωσιακή διαβίβαση που μπορεί να προκύψει, για δικούς τους σκοπούς, συμπεριλαμβανομένων εκείνων προωθητικού χαρακτήρα (αποστολή διαφημιστικών ανακοινώσεων) *