REINFORCED SOIL WALL AT ABUTMENT OF BRIDGE- 43 IN REASI, J&K

Año
2021
Ubicación
DIST. REASI, KATRA - JAMMU & KASHMIR - India
Cliente
Indian Railways-USBRL
Diseñador
Maccaferri / KRCL

Desafío

Udhampur-Srinagar-Baramulla Rail link Project (USBRL) is a project of national importance under Indian Railways with a view to provide an alternative and a reliable transportation system to Jammu & Kashmir. 272 Km long railway line from Udhampur to Baramulla joining the Kashmir valley is proposed which will entail the most challenging works undertaken post-independence by Indian Railways. The alignment of USBRL involves construction of a large number of tunnels and bridges in highly rugged and mountainous terrain with most difficult and complex Himalayan geology. At one of the locations near Katra (Chenab bridge), there was a requirement of earth retaining structure at Bakkal (Jammu) side for abutment of bridge no 43 to support the installation cranes for world's highest railway bridge from Bakkal (Jammu side) to Kauri (Srinagar side) at Chenab river in the Reasi district of Jammu and Kashmir India. The client was looking for a system which is economical and fast to construct.

Solución

Based on the site conditions and specific requirements of the client, Terramesh units made of gabion fascia along with an integrated tail as reinforcement of length 2m which is made of mechanically woven, double twisted, hexagonal shaped steel wire mesh was used. On the upper reaches of the structure, Green Terramesh units consisting of double twisted hexagonal shaped steel woven wire mesh along with a biodegradable erosion control blanket and a welded mesh panel with three steel tie rods were installed. For composite soil reinforcement system on which cranes could work, high strength flexible geogrids made of polyester core with polyethylene coating, ParaLink were installed as a primary reinforcement. Drainage composite, MacDrain W was used for drainage purposes between two different fills. Polyester needle punched non woven geotextile, MacTex was used as a filter media behind gabion facia units and wrapped around PVC pipe which allowed free movement of water and prevented backfill soil from entering in the voids between stone filling. Further, continuous threaded anchors of min. 3m length were embedded into the rock strata. Paralink was connected with anchors.

Descarga
el Caso de Éxito

REINFORCED SOIL WALL AT ABUTMENT OF BRIDGE- 43 IN REASI, J&K

Descargar
REINFORCED SOIL WALL AT ABUTMENT OF BRIDGE- 43 IN REASI, J&K

Nuestros productos para
esta Caso de Éxito

Ponte en contacto con nosotros

Si está de acuerdo con la Política de Privacidad de la empresa y ha comprendido su contenido, el Responsable del tratamiento le pregunta si consiente el tratamiento de sus datos, en la forma prevista en la política de privacidad de la empresa, para el envío de comunicaciones promocionales sobre los servicios/actividades ofrecidos por el Responsable del tratamiento. *

Además, el Responsable del tratamiento le pregunta si consiente la comunicación de sus datos personales a las Afiliadas de Maccaferri, y la consiguiente transferencia extracomunitaria que de ello pueda derivarse, para fines propios de estas últimas, incluidos los de carácter promocional (envío de comunicaciones de marketing) *