MEERHOUT BRIDGE 34

Tipo de proyecto
Reinforced Soil Walls and Slope Reinforcement
Año
2021
Ubicación
MEERHOUT - VLAANDEREN - Belgium
Cliente
Texion Geosynthetics NV
Diseñador
Arcadis NV / Sweco

Desafío

With almost 40 million tons of goods transported, the Albert Canal is the most important waterway in Flanders from an economic point of view and a crucial hinterland connection between the port of Antwerp, Limburg, the Antwerp Kempen and the Liège region. The Albert Canal has already been given a major facelift over the years to cope with growing traffic. And a further upgrade is now underway to make the Albert Canal even more attractive for businesses in the near future, thus encouraging a move to waterborne transport. In this way, inland navigation contributes to the solution for traffic congestion in Flanders. To make this possible, De Vlaamse Waterweg nv is putting a lot of effort into upgrading the Albert Canal. Today, the vertical clearance of the current bridges is still too limited. All bridges will therefore be systematically raised to 9.10 meters. The width under the bridges will also be increased. At the end of April 2019, De Vlaamse Waterweg appointed the nv Via T Albert to rebuild another eight bridges over the Albert Canal. These are the bridges in Beringen, Paal-Tervant, Meerhout-Vorst, Lummen, OelegemII (Ranst), Herentals (Herenthoutseweg), Kuringen, Hoogmolenbrug (Schoten).

Solución

The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the Belgian Annex. The possibility to modify the units to follow the exact shape of the bridge has been very well appreciated by the contractor FRANKI, that later chose the same system for the next bridges on the Albert Canal, like in Hoogmolenbrug and Kuringen. In this case, the original plan was to have a slope inclination equal to 70°. to respect this design requirement Maccaferri prosed to use 70° Green Terramesh element installed on both sides of the bridge embankments.

Descarga
el Caso de Éxito

MEERHOUT BRIDGE 34

Descargar
MEERHOUT BRIDGE 34

Nuestros productos para
esta Caso de Éxito

Ponte en contacto con nosotros

Si está de acuerdo con la Política de Privacidad de la empresa y ha comprendido su contenido, el Responsable del tratamiento le pregunta si consiente el tratamiento de sus datos, en la forma prevista en la política de privacidad de la empresa, para el envío de comunicaciones promocionales sobre los servicios/actividades ofrecidos por el Responsable del tratamiento. *

Además, el Responsable del tratamiento le pregunta si consiente la comunicación de sus datos personales a las Afiliadas de Maccaferri, y la consiguiente transferencia extracomunitaria que de ello pueda derivarse, para fines propios de estas últimas, incluidos los de carácter promocional (envío de comunicaciones de marketing) *