BARRAGEM CAMPEIRA - CRISTALÂNDIA

Año
2022
Ubicación
CRISTALÂNDIA - TOCANTINS - Brasil
Cliente
IMPERMAX ENGENHARIA LTDA
Diseñador
HATCH CONSULTORIA

Desafío

The Campeira Dam is responsible for supplying water to the city of Cristalândia (TO) for most of the year. A few years ago, after intense periods of rainfall, the dam's spillway, which was 7 metres wide, was not sufficient to release all the excess water from the reservoir, causing it to overflow and consequently the erosion of the shoulders and the dam's structure to be compromised.

Solución

After complex hydrological studies, the dam was resized. The width of the spillway was increased to 125 metres and it was lined with PoliMac® gabions, which made up the whole: sill, staircase and dissipation basin. The choice of technology made it possible to build an efficient hydraulic energy protection and dissipation structure with high abrasion resistance.

Descarga
el Caso de Éxito

BARRAGEM CAMPEIRA - CRISTALÂNDIA

Descargar
BARRAGEM CAMPEIRA - CRISTALÂNDIA

Nuestros productos para
esta Caso de Éxito

Ponte en contacto con nosotros

Si está de acuerdo con la Política de Privacidad de la empresa y ha comprendido su contenido, el Responsable del tratamiento le pregunta si consiente el tratamiento de sus datos, en la forma prevista en la política de privacidad de la empresa, para el envío de comunicaciones promocionales sobre los servicios/actividades ofrecidos por el Responsable del tratamiento. *

Además, el Responsable del tratamiento le pregunta si consiente la comunicación de sus datos personales a las Afiliadas de Maccaferri, y la consiguiente transferencia extracomunitaria que de ello pueda derivarse, para fines propios de estas últimas, incluidos los de carácter promocional (envío de comunicaciones de marketing) *