44 YEAR OLD GABION STRUCTURE
As the cliff was above the normal high tide level, it was considered sufficient to construct a stepped retaining wall from massVistastar
50 YEAR OLD GABION STRUCTURE – RIVER HUMBER
A ‘half-tide’ gabion wall, 2m high on an 18m wide gabion apron (0.5m thick). The volume of protection was approximately 13,Vistastar
A2 / A282 JUNCTION IMPROVEMENTS
The project team needed a solution that steepened the slope, thereby reducing the land take and saving the hedgerow. The main Contractor on the projecVistastar
AEROPORTO PLÁCIDO DE CASTRO
Debido a esto fue necesario la adopción de un geosintético tipo geomembrana para impermeabilización de los laterales de la pista y también de un gVistastar
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
Maccaferri provided support to the project team and proposed the MacWall Landmark segmental reinforced soil wall system. MVistastar
ARTESANO GALLERIA
The retaining walls were designed using a gravity gabion retaining system. The architectural boundary walls were defined with a maximum thickness of 5Vistastar
ATI PORT EXPANSION
In order to address the challenge of improving the port expansion grounds at the Manila South Harbor, Asian Terminals Inc. (ATI) is implementing a cosVistastar
AZUDES SITIO RAMSAR RÍO DESAGUADERO
To date, two of the six planned weirs have been constructed. For the construction of the curtain, approach works and the dissipation basin, gabion boxVistastar
BAHÍA DE PORTMAN
El Ministerio de Agricultura, Alimentación y Medio Ambiente adjudicó las labores de regeneración a la UTE Ciomar Marco. La solución adoptada Vistastar
BARRAGEM CAMPEIRA – CRISTALÂNDIA
After complex hydrological studies, the dam was resized. The width of the spillway was increased to 125 metres and it was lined with PoliMac® gabionsVistastar
BARRERA DINÁMICA RB 1500 CANTERA BITORIKA
Para dar solución al diagnóstico descrito, se ha instalado una barrera dinámica RB 1500, H=4 metros, con una longitud L=60 metros y anclajes de sueVistastar
BELFAST HARBOUR
The works included dregging of the new berth and approaches. This involved the disposal of 500,000m3 of material to sea with trVistastar
BODEGA ARABARTE
Para poder integrar las diferentes fases y partes de la construcción, los técnicos decidieron utilizar un entorno BIM y para ello Maccaferri puso a Vistastar
BONHILL, STIRLING ROAD
Maccaferri was approached by Barratt Homes to come up with a suitable solution for the posed site problems. It was agreed that Vistastar
BORDERS RAIL
Maccaferri's gabions were used to support widened cuttings extensively along the 35-mile route which connects Edinburgh to Vistastar
BOSCASTLE FLOOD DEFENCES
To achieve this solution, Halcrow specified a combination of Reno Mattresses and MacMat-R from Maccaferri. Over 7000 sq metres of Maccaferri wire meshVistastar
BROOMLANDS PRIMARY SCHOOL
Once the overall design had been agreed, Maccaferri was engaged to design, supply and install 8 free standing gabion walls which totalled 78.8m in lenVistastar
CARRETERA MA-2100, ENTRE ALARÓ Y ORIENT
Para dar solución a las inestabilidades generadas se han utilizado diferentes soluciones: En el P.K. 12, ante la presencia de grandes bloques de conVistastar
COBHAM SERVICES HGV PARKING AREA EXPANSION
The proposal was to increase the HVG parking numbers by 79 new spaces, to the west of the petrol filling station. The proposal Vistastar
COLLEY LANE SOUTHERN ACCESS ROAD
The ParaLink LTPs will transfer loads of the mechanically stabilised earth walls into the pile foundations beneath. The maximum heightVistastar
DANFOSS FACTORY
Maccaferri were approached by Quattro Consult Limited in July 2021 to propose a suitable high strength geogrid for use as a basVistastar
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
Maccaferri worked with Wood Patel Engineering to design a hydraulic solution for the microprocessor manufacturer TSMC. To reduce the soil erosion alonVistastar
DEBRIS FLOW PROTECTION LERINI STREAM
After a fierce challenge against the competitor, Maccaferri Balkans won this project thanks to a mix of high performing technical solutions, cost effeVistastar
DISCARICA DI BELLOLAMPO V VASCA
La realizzazione della vasca prevede l'impiego di una membrana in HDPE, di un gesontetico bentonitico e di un gecomposito drenante per la captazioVistastar
Drainage of structures
The adopted solution was the construction of draining trenches using the MacDrain® TD geocomposite as lateral base drains. These drains are designed Vistastar
EROSION CONTROL AGAINST MAMMAL BURROWING
Maccaferri was approached by contractors Crown Services Ltd and asked for advise on a suitable steel wire mesh system that could provide the required Vistastar
ESTABILIZACIÓN DE TALUD EN MUTRIKU
La solución adoptada consistió en la instalación de un sistema de contención flexible mediante Steelgrid, una cuadrícula de bulones y cables horiVistastar
ESTABILIZACIÓN DE TALUDES EN EL PUERTO EXTERIOR DE A CORUÑA
A fin de proteger las instalaciones contra los desprendimientos, se propuso y diseñó una solución mixta con un sistema de contención flexible en eVistastar
ESTABILIZACIÓN TALUDES PUERTO DE ZIERBENA
Para asegurar la zona, se diseñó e instaló un sistema de contención flexible de alta rigidez, para limitar al máximo la deformación del terreno,Vistastar
EXPANSION PROJECT “FUSTARET”
In this context, a project for the adequacy of the “Fustaret” saline deposit in Súria (Barcelona) has been drafted, where the remnants of potash Vistastar
EXPO HOUSE en DOHA EXPO 2023
Maccaferri fue seleccionado como proveedor de tecnología para el SISTEMA DE CUBIERTA VERDE (GREEN COVER SYSTEM), debido a la gran variedad de productVistastar
EXTENSION OF THE CHANTERAINES PARK
The Conseil Général 92 chose double-twist gabion cages because they allow the filling materials to show through easily. The infill stone chosen comeVistastar
FINALIZACIÓN CUARTO CINTURÓN B-40, ENTRE OLESA Y VILADECAVALLS
Para poder dar solución a la erosión que provoca la inestabilidad superficial de los taludes y permita una revegetación de éstos, se ha optado porVistastar
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
Maccaferri proposed the use of the MacWall Vertica 4° Segmental Block Retaining Wall System. The 4° batter of this system creVistastar
FV17 LIAFJELLET-OLVIKVATNET
Maccaferri, in cooperation with its local partner PRETEC AS, proposed an optimized solution to the contractor and the investor, aimed at enhancing theVistastar
Gabion Defense – Cajuca East Corridor
The Provincial Municipality of Nazca was in charge of the technical file through its technical study department. The hydraulic approach they determineVistastar
GAVIONES DE CERRAMIENTO, BOADILLA DEL MONTE
Desde el principio, una solución de gaviones de malla soldada GAVIARQ parecía la solución más adecuada para cumplir con los requisitos de la propiVistastar
HASANKEYF ARCHEOPARK PROJECT
The retaining walls, which will reach a height of 27 meters within the scope of the Hasankeyf archeopark project, has been designed with Terramesh SysVistastar
HELBOR BROOKLIN
The solution for this project involved the demolition of the existing retaining wall and the installation of a vertical drainage system using the MacdVistastar
HELLOMAC – Ponza – Cala Fonte
Maccaferri has always pursued innovation and has already taken part in this digital transformation developing a new alert system: HELLOMAC. Thanks to Vistastar
HUHUGAM HERITAGE CENTER
The aesthetics of gabions were desirable, yet a traditional gabion retaining structure would be very expensive. Therefore Maccaferri suggested the useVistastar
IPO DAM SILT CURTAINS
To address the degradation of the Ipo Dam and mitigate the adverse effects of soil erosion and water contamination, various long-term solutions are beVistastar
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
Byrne Looby and Partners were engaged by main contractor Siac Ltd, to value engineer the originally designed proposals as detailed on the project drawVistastar
LANPING LEAD-ZINC MINING SANCHONGSHAN DUMP RETAINING WALL PROJECT
According to the geological conditions and engineering requirements of the project, the owner and the design unit comprehensively consider the economyVistastar
LICEO LAS LAGUNAS
Se recomendó realizar un muro Terramesh® System PoliMac™ en todo el perimetro trasero, con altura máxima de 9.0m, para evitar problemas futuros. Vistastar
LINCOLNSHIRE EFW
Consulting engineers, Arup, devised a two stage system of ground level wet and dry holding lagoons. These were impermeably lineVistastar
LISTENING MIRRORS HISTORIC SITE
In the first phase of the project the peninsula housing the Mirrors was cut off to create an island linked to the mainland by a swing footbridge, and Vistastar
LÖTZGALERIE
The client chose the most economical system. The Maccaferri RB 3000 safety net with an energy of 3000 kJ and a height of 5 m. It was a great challengeVistastar
Lower Campbell Repair
The erosion control solution consisted of a six to nine-foot-tall, stair-stepped, gabion wall, with a concrete floor base. MaxTex® H 60.1 iVistastar
LUOYANG FOUR RIVER TONGZHI PROJECT
Maccaferri Gabion + Renomesh solutions improve the overall defense capability of protecting the river bank. Overall consideration of the relationshipVistastar
M606 MOTORWAY / M62 JUNCTION
Maccaferri’s double twist woven gabions have been used to create an approximately 450m, the combined length of road[1]side retaining wallVistastar
MacSport AC Monza
Per il rifacimento del campo di allenamento, sono state coinvolte diverse aziende specializzate nel settore delle infrastrutture sportive, tra cui ItaVistastar
MALLATAS DE PASTOR EN EL PARQUE NACIONAL DE ORDESA Y MONTE PERDIDO
Con el objetivo de reproducir al máximo la arquitectura original de las mallatas de pastor y obtener una integración paisajística acorde a la zona,Vistastar
Marginal Protection for the Tonameca River
Emergency actions such as dredging and the establishment of temporary embankments were implemented. Subsequently, hydrological and topographic studiesVistastar
Mass Gravity Retaining Walls
According to the premises outlined in the Environmental Recovery Plan (PRAD) provided by the client, the best solution among the available options in Vistastar
MEJORA DEL TERRENO PARA LA PLATAFORMA LOGÍSTICA DE LEIXÕES
La estrategia para abordar el desafío en el Polo 1 de la plataforma logística fue la implementación del geosintéticos para incrementar la capacidaVistastar
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
The comprehensive solution involved Maccaferri's expertise and a strategic selection of materials to optimize the environmental remediation procesVistastar
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
The technical studies carried out indicated that the best solution to the problem presented, among others found on the market, would be two gabion retVistastar
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
The constructor together with the external supervision and the SICT residence analysed different alternatives for the required retaining works, and thVistastar
MURO GAVIONES SEASCAPE RESORT – FINESTRAT
La utilización de los gaviones de malla de triple torsión se pudo adaptar perfectamente a la forma requerida. Para el relleno de los gaviones se decVistastar
NEW ASDA STORE
The chosen solution was the MacWall Diamond dry build a segmental block retaining wall system due to its rapid speed of construction, flexibility and Vistastar
NEWHURST ENERGY FROM WASTE FACILITY
Maccaferri proposed the use of its Macline GCL W20 to impermeably line the attenuation pond and this was accepted by client HitVistastar
NORTH WALES COASTROAD (A55)
Where the alluvial clay was at its shallowest, after having removed the refuse, a separator geotextile was placed to provide a Vistastar
OBRA DE EMERGENCIA EN LA A-317 EN VÉLEZ-BLANCO
Para solucionar estos problemas, se realizó una obra de emergencia que fue adjudicada a la empresa Servicios Técnicos Napal, siendo los trabajos ejeVistastar
Ocean Farm 1 – Supply of KikkoNet Net and Net Structure
As a supplier of the new net pen in this project, Maccaferri is in charge of supplying the KikkoNet containment net and its built-in structural reinfoVistastar
OCEANS UMHLANGA MALL
After evaluating the geotechnical parameters, loading constraints and required structure geometry, Maccaferri provided a designVistastar
PARADOR DE NERJA
Para la estabilización superficial de la parte superior del talud, donde se han generado los voladizos, se ha colocado un Sistema Estructural FlexiblVistastar
PARAMESH WALL FOR BAJO – MALAWATAR ROAD SEGMENT
The Retaining Wall Structure for Bajo – Malawatar Road Segment is constructed using Paramesh System with a height of 8.5m, consisting of a TerrameshVistastar
PARTICULAR EN BENAHAVÍS
La solución con gaviones en malla electrosoldada GAVIARQ ha permitido, simultáneamente, obtener pequeños muros de contención con alturas entre 1 yVistastar
PASSAGEM INFERIOR DA RODOVIA BR-101 EM ESCADA
A containment and verticalization project for the meeting embankment was implemented using the reinforced soil system with the Terramesh System wall. Vistastar
PEACE BRIDGE
A 40m long,8m high Green Terramesh® reinforced soil abutment wall to surround and support the high-level bridge bank seat and integrate seamlessly wiVistastar
PRESA FRANCISCO ABELLÁN
Para proteger a los usuarios y personal de mantenimiento de los posibles desprendimientos, se ha optado por una solución específica para cada situacVistastar
PRESTONS ROAD FLYOVER
The avoidance of surcharge on the tunnel and the potential for differential movement were resolved by supporting the approach rVistastar
PROTEÇÃO COSTEIRA COM GABIÕES
To protect and control erosion, PoliMac™ box-type gabion containment was used, together with a PoliMac™ Reno® mattress, used at the pipe outlets,Vistastar
PROTECCIÓN CONTRA CAÍDA DE ROCAS EN ALHABIA
Para garantizar la seguridad vial de la carretera, se realizó una obra de emergencia que fue adjudicada a la empresa Seanto. Dicha obra consta dVistastar
PROTECCIÓN CONTRA DESPRENDIMIENTOS C-13 FONT DE LES BAGASSES
La solución adoptada, además del desbroce y saneo del talud para retirar bloques inestables, incluía la instalación de una serie de barreras dináVistastar
PROTECCIÓN DEL YACIMENTO ARQUEOLÓGICO DE “LES COVES DEL FEM “
Se ha optado por la flexibilidad de los gaviones en malla de doble torsión, con marca CE acorde a ETA-15/0219, que ha permitido adaptar la intervenciVistastar
PROYECTO DE AMPLIACIÓN FUSTARET
En este contexto se ha redactado un proyecto para la adecuación del depósito salino del Fustaret en Súria (Barcelona), emplazamiento en el cual se Vistastar
RAILWAY EMBANKMENT BURROWING PREVENTION
Maccaferri’s Anti-Burrowing Mesh has been proven to be a strong rodent deterrent. Unlike any plastic grids or thin rabbit netVistastar
REDROW HOMES DEVELOPMENT
The excavated chalk was originally scheduled for landscaping and offsite disposal. However, contractor GDL, their designers GES and Maccaferri determiVistastar
Rehabilitation due to Undermining in Villalobos
An environmentally sustainable engineering solution will be implemented. Technologies such as Terramesh System and Macgrid WG will be used to stabilizVistastar
Reinforced Soil Retaining Structure and Slope Reinforcement
The client required a solution that met technical, architectural, and environmental requirements, incorporating a green face to transform the retaininVistastar
Reinforced Soil Walls and Slope Reinforcement in HUARAZ – ANCASH – Perú
The major challenge was to propose a reinforced soil wall with a considerable height of 19 meters using the technical-economic competitiveness of the Vistastar
REPAIR AND IMPROVEMENT OF OUELLETTE DRAIN WEST OUTLET
RC Spencer Associates Inc., a reputable engineering firm in the Windsor area, was tasked by the Town of Amherstburg to devise aVistastar
RESTAURACIÓN – AUTÓDROMO INTERNACIONAL DE GOIÂNI
Pensando en ello, AGETOP, la agencia estatal responsable de la administración del autódromo, decidió utilizar geomallas para el refuerzo del asfaltVistastar
RESTORATION OF THE ROAD LINK RR 128 AIN OCTOR – KORBOUS
The acrobatic works company, Hydrokarst, based in France, solicited Maccaferri to propose solutions for protection against rockfalls. Several types ofVistastar
RETAINING WALL SUPPORTING A630
A PVC-coated welded mesh mass gravity gabion wall was originally proposed within the design. However, the PVC coating on weldedVistastar
RETENTION WORKS FOR YADAGIRI GUTTA TEMPLE AREA
The site of the presidential suite building area is on hilly terrain and the foundation strata is completely rock. The height of the retention is varyVistastar
Road stabilization in Totonicanapá
The use of mono-oriented MacGrid WG geogrids integrated into the Terramesh system offers a superior technical solution for the containment project in Vistastar
ROCKFALL MITIGATION WORKS- RAILWAY LINE-NEAR CH 14 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. RVistastar
ROCKFALL PROTECTION AT SIMPANG PULAI, PERAK, MALAYSIA
Based on the rockfall trajectory analysis, the design energy level required is 2000 kJ. Flexible barrier with post height of 4m in installed over 500mVistastar
SADAWARNA DAM PARAMESH WALL
The Retaining Wall Structure for Stilling Basin in Sadawarna Dam is constructed using Paramesh System with a height of 5m, consisting of the TerrameshVistastar
SAFETY WORKS ON THE RD 900 IN THE ROCHAILL SECTOR
As part of the MBC project in the Alpes de Haute Provence department, EPC France called on France Maccaferri to provide a wide range of solutions for Vistastar
SEATION TRAMWAY
The site is situated above an area of soft soil that required substantial ground improvement.The new platform area adjacent to Vistastar
Second Stage MME at Puerto Escondido Airport
To strengthen the embankment, a longitudinal containment structure was designed and built, combining gabion walls and the Terramesh System along with Vistastar
SLOPE PROTECTION MEASURES- RAILWAY LINE- NEAR CH 13 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. VVistastar
SLOPE STABILIZATION AND PROTECTION AT ULU SLIM RIVER, PERAK
After careful considerations, Jabatan Kerja Raya (JKR) Batang Padang adopted Maccaferri Gabions Retaining Wall to solve this problem and increase safeVistastar
Small green lung in the Metelliana Valley
Maccaferri’s solution to the environmental challenges posed by the abandoned landfill in Cava de’ Tirreni involved the application of advanced geoVistastar
SNCF LINE 930 000 FROM MARSEILLE TO VINTIMILLE
The work involved installing 3 lines of protective screens on the rock faces located on the slope and in the access trench to the Cap Martin tunnel, fVistastar
SOSTENIMIENTO ROCALLA EN VÍCAR, ALMERÍA
Para solucionar este problema, se realizó el siguiente sostenimiento:- Red de cable LEA 300-8 de 130 kN/m de resistencia a la tracción y 204 kN de rVistastar
St Andrews Royal & Ancient Golf Club
The approved scheme was designed by HR Wallingford, to include both ‘hard’ and ‘soft’ engineering solutions and the contract was supervised byVistastar
SUNSET CLIFF
La solución adoptada para los muros del “Sunset Cliff” está formada por dos tipos de sistemas: Muros de gravedad mediante gaviones en el caso deVistastar
TERRAMESH RD PATRIMONIAL
The slope, characterized by its steep incline, created a challenging situation that required the implementation of containment measures to ensure the Vistastar
TERRAMESH® VERDE CARRETERA MATARANI KM. 24
This road uses engineering solutions with reinforced soil walls, Terramesh® System and Terramesh® Verde, which economised the project by saving on bVistastar
TERZO VALICO DEI GIOVI – GENOVA JUNCTION
Maccaferri proposed an innovative approach involving Automated Tunnel Ribs HEB 300 complete with automated hinges and automated links (covering a lengVistastar
The Ash Yard of the Thermal Power Plant
The creation of cells was carried out, protected with geosynthetics both at their base and in the closure, with three levels of impermeable protectionVistastar
THE GRAND BOHEMIAN HOTEL
Initially, the project specifications called for S8 Aluminum anchors to be driven to a depth of 16'. However, during the installation, numerous prVistastar
THE NEW ROUTE DU LITTORAL
The solution defined by the project management for the landward embankments was a geosynthetic stiffened embankment with a double-twist gabion facing.Vistastar
THREE CITIES TRAIL
The civil engineers at Halff successfully designed and implemented a tie-back reinforced gabion retaining wall to act as the slVistastar
TK 2018 – 006 – MRV
The solution adopted for this construction case involves a rectangular channel with cross-sectional heights varying between 2 and 4 meters. Gabion BoxVistastar
URBANIZACIÓN SAN SEBASTIAN DE LOS REYES
Para elaborar la propuesta técnica, debido a que la geometría del muro es variable a lo largo de todo el trazado, A. Bianchini Ingeniero decidió deVistastar
VOID SPANNING IN HOUSING DEVELOPMENT
The Developer’s Engineer approached Maccaferri to providedesign and supply of a high-strength geogrid solution. The proposed site topography was comVistastar
WALTHAM HIGH SCHOOL
Based on the rock wall’s height, geotechnical characteristics and the proximity of it to the school, a pinned drapery solution was the recommended mVistastar
¿No encontraste lo que estabas buscando?
Conoce a nuestros expertos
Representamos un socio ganador para el complejo mundo de las construcciones civiles e industriales. Gracias a una amplia gama, nuestros productos son la respuesta a las diversas demandas técnicas del sector: desde drenaje y protección hasta el agua y la impermeabilización de estructuras y revestimientos, pasando por el ahorro energético y la comodidad en la vivienda, desde el control de vapor hasta los problemas relacionados.