Second Stage MME at Puerto Escondido Airport

Rok
2022
Lokalita
PUERTO ESCONDIDO - OAXACA - México
Klient
SICT OAXACA
Projektant
HUAROCSO SA DE CV

Výzva

The erosive action of the stream flowing parallel to kilometer 137 on the federal highway Pinotepa Nacional - Salina Cruz has caused the undermining of the embankment, risking its stability. Additionally, the urban expansion brings a larger surface covered with asphalt and concrete, which have a lower infiltration coefficient, resulting in increased hydraulic expenditure, especially during hydro-meteorological events that affect this coastal city.

Řešení

To strengthen the embankment, a longitudinal containment structure was designed and built, combining gabion walls and the Terramesh System along with Paragrid 200 HF geogrids. Additionally, transverse deflector-type structures and two gabion weirs were included to control the slope of the channel. Also, an increased embedment depth was implemented for this wall, located in a high seismicity zone.

Stáhněte si Úspěšný Příběh

Second Stage MME at Puerto Escondido Airport

Stáhnout
Second Stage MME at Puerto Escondido Airport

Naše produkty pro
tento Úspěšný Příběh

Spojte se s námi

Pokud souhlasíte se Zásadami ochrany osobních údajů společnosti a rozumíte jejich obsahu, správce se vás dotazuje, zda souhlasíte se zpracováním způsobem stanoveným v zásadách ochrany osobních údajů společnosti za účelem zasílání propagačních sdělení o službách/činnostech poskytovaných správcem. *

Správce se vás dále dotazuje, zda souhlasíte se sdělením vašich osobních údajů přidruženým společnostem Maccaferri a s případným následným přenosem mimo EU, pro jejich vlastní účely, včetně účelů propagačních (zasílání marketingových sdělení) *