MODERNIZATION OF THE RAILWAY TRACK SUDOMERICE-VOTICE
Výzva
The project involves the reconstruction of a single-track railway line to a double-track line, primarily through realignments in the section between Sudoměřice and Votice. The modernization of the line includes the installation of track rails, a new railway station, two railway tunnels, bridge structures, and all other related components, with the goal of achieving a line speed of up to 160 km/h. Various cuts formed by soil and rock which had to be secured and stabilized are located on the section of railway.
Řešení
Based on the conducted engineering-geological survey, two main stabilization methods were proposed according to the geological conditions. For soil cuts, the slopes were shaped with an inclination of 1:1.5 and stabilized using an erosion control mat reinforced with double-twisted steel mesh, MacMat R1 8127, secured to the ground with steel pins. Rock slopes were stabilized using SteelGrid HR50 and SteelGrid HR100 GN highstrength rockfall meshes in combination with self-drilling steel bars R32 and SteelGrid HR plates. In locations with loose soil, an additional layer of MacMat was installed below the steel mesh. In partial very unstable locations HEA panels were used. Due to an unexpected extreme alkaline environment causing rapid corrosion, the system had to be upgraded to SteelGrid HR with Polimac coating, which is resistant even in extreme cases like this, in order to meet the required design life. Additionally, the SteelGrid HR plates coating was upgraded to epoxy polymeric coating PC-Coat. The nails were replaced with a glass fiber system. All other system components were from stainless steel.
Naše produkty pro
tento Úspěšný Příběh
Spojte se s námi
[contactForm_txtSuccessSubmit]