KOSOVO MOTORWAY PROJECT

Rok
2020
Lokalita
PRISHTINE - KOSOVO - Kosovo
Klient
Republic of Kosovo, Ministry of Infrastructure
Projektant
TEMPUS PROJECT Ltd.

Výzva

This project has implied reinforced soil wall design, material supply and installation. The main contractor was Bechtel Enka general partnership. Bechtel Enka joint-venture completed Kosovo’s first two motorways – Route 6 and Route 7. Route 6 Prishtine – Hani i Elezit is an integral part of road corridor which connects capital cities, Prishtine and Skopje (FYR Macedonia). Together these motorways create a transport corridor from Kosovo’s border with Albania, via its capital, to its border with North Macedonia. The walls have been built in a seismic and montainous area for a total of more than 13800 sqm of reinforced soil facing.

Řešení

Mainly, seven Paramesh system walls have been built: WL 015, WL 024, WL 060, WR 131, WR 134, WR 139, WR 406. The main products used are Terramesh System 3x2x0.5 and 3x2x1, MacTex H35.1, ParaLink 500, ParaLink 300 and ParaGrid 150. The project included also gabions walls, soil nailing with MacMat and rockfall protection. Most of the walls comprises of box culverts at the bottom for the runoff of water. The maximum height of the reinforced soil walls is nearly 25 meters.

Stáhněte si Úspěšný Příběh

KOSOVO MOTORWAY PROJECT

Stáhnout
KOSOVO MOTORWAY PROJECT

Naše produkty pro
tento Úspěšný Příběh

Spojte se s námi

Pokud souhlasíte se Zásadami ochrany osobních údajů společnosti a rozumíte jejich obsahu, správce se vás dotazuje, zda souhlasíte se zpracováním způsobem stanoveným v zásadách ochrany osobních údajů společnosti za účelem zasílání propagačních sdělení o službách/činnostech poskytovaných správcem. *

Správce se vás dále dotazuje, zda souhlasíte se sdělením vašich osobních údajů přidruženým společnostem Maccaferri a s případným následným přenosem mimo EU, pro jejich vlastní účely, včetně účelů propagačních (zasílání marketingových sdělení) *