KAMP-EROSION CONTROL

Rok
2021
Lokalita
KAMP - OBERÖSTERREICH - Austria
Klient
SGS GEOTECHNIK GMBH
Projektant
Werner Consult

Výzva

The company Werner Consult was designing a spillway for the Kamp River, located in the lower part of Austria. The initial design considered a 2m-height earth dam with erosion protection on the two side slopes. This slope protection was made of stones (Ø 30cm) and concrete.

Řešení

Maccaferri proposed a cost-effective alternative solution with RENO mattresses®. Based on the different sections the mattresses had different lengths (3, 5, and 6m) but the same width (3m) and height (0.23m). The wire diameter was Ø 2.2-3.2mm with an additional polymer coating to protect it from abrasion and UV radiation. Considering the extent of the project and the disposition of the mattresses it was convenient to use rolls of DT-netting instead of single lids for each mattress. The installation has been carried out smoothly and fast.

Stáhněte si Úspěšný Příběh

KAMP-EROSION CONTROL

Stáhnout
KAMP-EROSION CONTROL

Naše produkty pro
tento Úspěšný Příběh

Spojte se s námi

Pokud souhlasíte se Zásadami ochrany osobních údajů společnosti a rozumíte jejich obsahu, správce se vás dotazuje, zda souhlasíte se zpracováním způsobem stanoveným v zásadách ochrany osobních údajů společnosti za účelem zasílání propagačních sdělení o službách/činnostech poskytovaných správcem. *

Správce se vás dále dotazuje, zda souhlasíte se sdělením vašich osobních údajů přidruženým společnostem Maccaferri a s případným následným přenosem mimo EU, pro jejich vlastní účely, včetně účelů propagačních (zasílání marketingových sdělení) *