ÇÖPLER GOLD MINE ROCK FALL PROJECT

Rok
2018-2019
Lokalita
ERZİNCAN - DOĞU ANADOLU - Turkey
Klient
ANAGOLD MADENCİLİK SAN. ve TİC. A.Ş.

Výzva

The Çöpler mine site is an open pit operation located 8 km away from Ilıc District of Erzincan City, approximately 550 km east of Ankara in Middle Anatolia with the capacity to process approximately 20,000 tonnes of oxide ore per day. During the extension of the waste storage area, rockfall from the rocky slopes next to the construction area forced the company to stop the construction temporarily in order to prevent damage on the membranes and to decrease the risk for the construction crew.

Řešení

In accordance with the urgency of the situation, the size of the potentially dangerous rocks on the slope and in line with the technical and economic conditions, Steel Grid HR100 has been installed on the steep slopes running along the waste storage area. The total area of approximately 30,000 m² has been installed in a time period of 4-6 weeks under the cooperation with our professional mountainer crew.

Stáhněte si Úspěšný Příběh

ÇÖPLER GOLD MINE ROCK FALL PROJECT

Stáhnout
ÇÖPLER GOLD MINE ROCK FALL PROJECT

Naše produkty pro
tento Úspěšný Příběh

Spojte se s námi

Pokud souhlasíte se Zásadami ochrany osobních údajů společnosti a rozumíte jejich obsahu, správce se vás dotazuje, zda souhlasíte se zpracováním způsobem stanoveným v zásadách ochrany osobních údajů společnosti za účelem zasílání propagačních sdělení o službách/činnostech poskytovaných správcem. *

Správce se vás dále dotazuje, zda souhlasíte se sdělením vašich osobních údajů přidruženým společnostem Maccaferri a s případným následným přenosem mimo EU, pro jejich vlastní účely, včetně účelů propagačních (zasílání marketingových sdělení) *