44 YEAR OLD GABION STRUCTURE

Lokalita
DOWNDERRY - CORNWALL - United Kingdom
Klient
Caradon District Council
Projektant
Maccaferri Construction

Výzva

Adjacent to the village of Downderry the beach was affected by erosion. Tidal action undermined the toe of the cliff and threatened to cause a major slip. Properties, including a Hotel, were endangered by possible subsidence.

Řešení

As the cliff was above the normal high tide level, it was  considered sufficient to construct a stepped retaining wall   from mass gravity gabions. The work was completed in   1971, and the threat of erosion was removed. The properties   on the cliff were also stabilized and no longer in danger of   possible subsidence. After 44 years, the gabion coating and   structure seems to show no sign of any significant damage   and the gabion structure is perfectly integrated with the   coastal environment.

Stáhněte si Úspěšný Příběh

44 YEAR OLD GABION STRUCTURE

Stáhnout
44 YEAR OLD GABION STRUCTURE

Naše produkty pro
tento Úspěšný Příběh

Spojte se s námi

Pokud souhlasíte se Zásadami ochrany osobních údajů společnosti a rozumíte jejich obsahu, správce se vás dotazuje, zda souhlasíte se zpracováním způsobem stanoveným v zásadách ochrany osobních údajů společnosti za účelem zasílání propagačních sdělení o službách/činnostech poskytovaných správcem. *

Správce se vás dále dotazuje, zda souhlasíte se sdělením vašich osobních údajů přidruženým společnostem Maccaferri a s případným následným přenosem mimo EU, pro jejich vlastní účely, včetně účelů propagačních (zasílání marketingových sdělení) *