OOSTERWEEL VERBINDING -LINKEROEVER, SB12-SB13 SOUND BARRIERS

Year
2022
Location
ANTWERP - ANTWERP - Belgium
Client
Lantis / Texion Geosynthetics NV
Designer
Arcadis NV /Lantis

Challenge

The Oosterweel Link project is a new 15km-long motorway connection developed by Lantis for completing the Antwerp ring road R1 (Belgium). It is a major project in Belgium and its design started in the 1990s to find a solution to the congestion problems in and around Antwerp. The total estimated cost of the project is approximately €4.5bn. The Antwerp ring road is a key part of the Trans-European

Transport (TEN-T) Core Network.

Maccaferri collaborated with the design and building of the Mechanically Stabilized Earth (MSE) walls with its main product family „Terramesh“. This is a well-known system used in Europe and in the rest of the world to support or enable the construction of infrastructures in tight urban corridors, forming retaining walls, road embankments, wing walls and bridge abutments known as Geosynthetic Reinforced Soil-Integrated Bridge Systems (GRS-IBS).

„Terramesh“ double twist steel wire mesh reinforcements have been used in combination with ParaLink® and Paragrid® geogrids representing an evolution and a significant advantage for both cost-effectiveness and performance. The project includes 15.000 facing sqm of „Terramesh Green®“, 14.000 facing sqm of „Terramesh Mineral® and System® and 5.000 facing sqm of gabion cladding.

Solution

Along the main road E34 the design foresaw the construction of noise barriers up to 9m of height. The front inclination was planned by 70° to ease the re-greening of the slopes.

Terramesh Green and Terramesh Mineral were used in accordance to the plan. in the area under the bridges, the Terramesh Mineral was used to avoid any maintenance of the green slopes. Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global and Internal stability checks with Limit Equilibrium Method (LEM) analyses carried out with MacStars Software to Finite Element Method (FEM)

deformation analyses due to the strict restrictions on displacements. Maccaferri provided the designers with all material properties for correct modeling.

Download
the Success Story

OOSTERWEEL VERBINDING -LINKEROEVER, SB12-SB13 SOUND BARRIERS

Download
OOSTERWEEL VERBINDING -LINKEROEVER, SB12-SB13 SOUND BARRIERS

Our products for
this Success Story

Get in touch with us

If you agree with the company's Privacy Policy and understood its content, the Data Controller asks you if you consent to the processing in manner provided in the company's privacy policy for sending promotional communications of the services / activities provided by the Data Controller. *

Furthermore, the Data Controller asks you if you give your consent for the communication of your personal data to the Maccaferri Affiliates, and the consequent extra-EU transfer that may result, for their own purposes, including of a promotional nature (sending marketing communications) *