Second Stage MME at Puerto Escondido Airport

Ano
2022
Localização
PUERTO ESCONDIDO - OAXACA - México
Cliente
SICT OAXACA
Projetista
HUAROCSO SA DE CV

Desafio

The erosive action of the stream flowing parallel to kilometer 137 on the federal highway Pinotepa Nacional - Salina Cruz has caused the undermining of the embankment, risking its stability. Additionally, the urban expansion brings a larger surface covered with asphalt and concrete, which have a lower infiltration coefficient, resulting in increased hydraulic expenditure, especially during hydro-meteorological events that affect this coastal city.

Solução

To strengthen the embankment, a longitudinal containment structure was designed and built, combining gabion walls and the Terramesh System along with Paragrid 200 HF geogrids. Additionally, transverse deflector-type structures and two gabion weirs were included to control the slope of the channel. Also, an increased embedment depth was implemented for this wall, located in a high seismicity zone.

Descarregue
o Caso de Sucesso

Second Stage MME at Puerto Escondido Airport

Descarregar
Second Stage MME at Puerto Escondido Airport

Os nossos produtos para
esta Caso de Sucesso

Entre em contacto connosco

Se concorda com a Política de Privacidade da empresa e compreendeu o seu conteúdo, o Responsável pelo tratamento pergunta-lhe se consente o tratamento, na forma prevista na política de privacidade da empresa, para o envio de comunicações promocionais relativas aos serviços/atividades disponibilizados pelo Responsável pelo tratamento. *

Além disso, o Responsável pelo tratamento pergunta-lhe se consente a comunicação dos seus dados pessoais às Afiliadas Maccaferri, e a consequente transferência extra-UE que daí possa resultar, para fins próprios destas últimas, incluindo os de natureza promocional (envio de comunicações de marketing) *