44 YEAR OLD GABION STRUCTURE
44 YEAR OLD GABION STRUCTURE
As the cliff was above the normal high tide level, it was  considered sufficient to construct a stepped retaining wall   from massVisualizar
star
50 YEAR OLD GABION STRUCTURE – RIVER HUMBER
50 YEAR OLD GABION STRUCTURE – RIVER HUMBER
A ‘half-tide’ gabion wall, 2m high on an 18m wide gabion  apron (0.5m thick). The volume of protection was   approximately 13,Visualizar
star
A2 / A282 JUNCTION IMPROVEMENTS
A2 / A282 JUNCTION IMPROVEMENTS
The project team needed a solution that steepened the slope, thereby reducing the land take and saving the hedgerow. The main Contractor on the projecVisualizar
star
AEROPORTO PLÁCIDO DE CASTRO
AEROPORTO PLÁCIDO DE CASTRO
Debido a esto fue necesario la adopción de un geosintético tipo geomembrana para impermeabilización de los laterales de la pista y también de un gVisualizar
star
AEROPUERTO PLÁCIDO DE CASTRO
AEROPUERTO PLÁCIDO DE CASTRO
Nesta situação fez-se necessário a adoção do geossintético tipo geomembrana para impermeabilização das laterais da pista e também do geocompoVisualizar
star
AGRIPORT, MAYDON WHARF
AGRIPORT, MAYDON WHARF
A raft foundation of Paralink ™ basal reinforcement was found to be the most cost-effective solution for this problem. Piled foundations would have Visualizar
star
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
Maccaferri provided support to the project team and  proposed the MacWall Landmark segmental reinforced soil   wall system. MVisualizar
star
ALCALDÍA MUNICIPAL DE NOVA INDEPENDÊNCIA
ALCALDÍA MUNICIPAL DE NOVA INDEPENDÊNCIA
A solução encontrada foi a utilização das geomembranas MacLine®, revestindo todas as superfícies da lagoa de tratamento, formando assim a barreiVisualizar
star
ALPHAVILLE ANÁPOLIS
ALPHAVILLE ANÁPOLIS
A solução que veio atender tanto no quesito econômico quanto técnico, bem como o prazo, foi a utilização de geotêxteis tecidos para separaçãoVisualizar
star
ALTEAMIENTO DE BACIA DE AGUA BRUTA
ALTEAMIENTO DE BACIA DE AGUA BRUTA
A solução encontrada foi à execução de um muro em Gabião Caixa, nas bordas da lagoa existente. O muro foi impermeabilizado com geomembrana MacLiVisualizar
star
ALTO COMEDERO
ALTO COMEDERO
Depois de analisar o projeto, foi feita uma proposta para incorporar as fibras metálicas Wirand® FF1. Estas, permitiram a diminuição da armadura dVisualizar
star
AMBEV DOMINICANA
AMBEV DOMINICANA
Foi construído um muro de contenção em Gabiões Caixa, com extensão de 800m e altura média de 6m, com utilização do geotêxtil MacTex® ao tardVisualizar
star
AMPLIAÇÃO E MODIFICAÇÃO DA COLETORA ROTA 9
AMPLIAÇÃO E MODIFICAÇÃO DA COLETORA ROTA 9
Para avançar o terreno, era necessário fazer um muro de contenção, o qual devia ser aceito pela Direção Provincial de Vias de Salta. A soluçãoVisualizar
star
AMPLIACIÓN DE CALLE CONDOMINIO LAS RAMBLAS
AMPLIACIÓN DE CALLE CONDOMINIO LAS RAMBLAS
Con la finalidad de ampliar la superficie y que pueda pasar la calle y por ser un proyecto residencial se utilizó Terramesh® Verde. Visualizar
star
ANGLO AMERICAN – PROYECTO BARRO ALTO
ANGLO AMERICAN – PROYECTO BARRO ALTO
A impermeabilização consistiu na utilização de uma geomembrana de polietileno com 1,00mm de espessura que foi submetida a um rigoroso processo de Visualizar
star
ANGLOAMERICAN
ANGLOAMERICAN
A solução utilizada foi o SteelGrid® HR, o qual é composto pela malha hexagonal de dupla torção, com cabos de aço espaçados no sentido verticaVisualizar
star
APOYO DE PUENTE VARIANTE EL REPOSO
APOYO DE PUENTE VARIANTE EL REPOSO
Para este proyecto, Maccaferri propone un Terramesh® System, ya que es una solucion que presenta muchas ventajas en los aspectos de durabilidad, defoVisualizar
star
ARENA CORINTHIANS
ARENA CORINTHIANS
Devido as premissas do projeto, a solução Terramesh® System com geogrelhas MacGrid®, foi a melhor solução encontrada, dada a sua viabilidade téVisualizar
star
ARROYO CARRASCO
ARROYO CARRASCO
A solução adotada compreendia o revestimento e reforço dos taludes através do uso de geomantas com trechos em MacMat® L e R, onde esta última trVisualizar
star
ARROYO DE CAPÃO
ARROYO DE CAPÃO
Os técnicos da Prefeitura Municipal de Igarapé, optaram por uma ponte mista padrão DEOP/SETOP com longarinas em viga metálica e tabuleiro em lajesVisualizar
star
ARROYO SANEAGO
ARROYO SANEAGO
Depois de elaboradas as devidas análises e considerações informadas pelo cliente, juntamente com a construtora Hábil, foi possível dimensionar umVisualizar
star
ARTESANO GALLERIA
ARTESANO GALLERIA
The retaining walls were designed using a gravity gabion retaining system. The architectural boundary walls were defined with a maximum thickness of 5Visualizar
star
ASTON HOTEL ANYER BREAKWATER STRUCTURE
ASTON HOTEL ANYER BREAKWATER STRUCTURE
Breakwater is often constructed out of rocks or concrete, forming a wall or a submerged barrier parallel to the shore. Maccaferri Indonesia proposed tVisualizar
star
ATI PORT EXPANSION
ATI PORT EXPANSION
In order to address the challenge of improving the port expansion grounds at the Manila South Harbor, Asian Terminals Inc. (ATI) is implementing a cosVisualizar
star
ATLANDEP
ATLANDEP
Realizando estudios de viabilidad técnica y económica, la solución que presentó mejor resultado y consecuentemente escogida fue la de realizar el Visualizar
star
AUTOPISTA BR 40 – KM 44
AUTOPISTA BR 40 – KM 44
O projetista indicou a utilização de uma barreira com 60 metros de comprimento e 3 metros de altura, posicionada no pé do talude. Os principais eleVisualizar
star
AUTORIDADE PORTUÁRIA DOMINICANA
AUTORIDADE PORTUÁRIA DOMINICANA
Para este projeto, foi realizado uma proposta de um muro de contenção em gabiões caixa com revestimento plástico (PVC) para maior durabilidade, coVisualizar
star
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErVisualizar
star
AVIAR NAVARRO
AVIAR NAVARRO
Para poder satisfazer as necessidades do cliente, necessitou-se 8.700 m² de geomembrana de polietileno de alta densidade de 1 mm de espessura. A obraVisualizar
star
BARRAGEM CAMPEIRA – CRISTALÂNDIA
BARRAGEM CAMPEIRA – CRISTALÂNDIA
After complex hydrological studies, the dam was resized. The width of the spillway was increased to 125 metres and it was lined with PoliMac® gabionsVisualizar
star
BARRERA DINÁMICA CONTRA CAÍDA DE ROCAS RMC 200
BARRERA DINÁMICA CONTRA CAÍDA DE ROCAS RMC 200
Por se tratar de um grande trecho de instabilidade superficial, situado no pé da serra do mar, a melhor opção para a proteção das instalações fVisualizar
star
BARRERAS PH TORO III
– Barrera de protección con capacidad de 2000 kJ de 50 metros de largo por 7 metros de alto. – Barrera de protección con capacidad de 2000 kJ dVisualizar
star
BAY BRIDGE, CALIFORNIA, 112-FOOT-TALL VEGETATED RSS
BAY BRIDGE, CALIFORNIA, 112-FOOT-TALL VEGETATED RSS
Caltrans designed a 112-foot-high reinforced soil slope, sitting on top of a 21-foot-high Terramesh® system mechanically stabilized earth (MSE) wall Visualizar
star
BE-ANTWERP MALINAS
BE-ANTWERP MALINAS
The construction company firstly layed the ParaLink 950 rolls as indicated by Maccaferri´s technicians to create a stable foundation for the planned Visualizar
star
BE-MECHELEN R6
BE-MECHELEN R6
The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the CUR normative (Netherlands). Since tVisualizar
star
BEAVERNETTING EVERTSOORD
BEAVERNETTING EVERTSOORD
The company Texion Geosynthetics NV, partner of Maccaferri for the BeNeLux market, provided full assistance, proposing a solution with the so-called bVisualizar
star
BELFAST HARBOUR
BELFAST HARBOUR
The works included dregging of the new berth and  approaches. This involved the disposal of 500,000m3 of   material to sea with trVisualizar
star
BEM BRASIL ALIMENTOS
BEM BRASIL ALIMENTOS
Foram propostas quatro lagoas de tratamento de efluentes revestidas e impermeabilizadas com a geomembrana MacLine®, garantindo a estanqueidade do sisVisualizar
star
BOB 230KV SWITCHYARD
BOB 230KV SWITCHYARD
Maccaferri worked in coordination with Power Engineers to develop a proposal that included drawings, calculations and specifications for the channel aVisualizar
star
BONHILL, STIRLING ROAD
BONHILL, STIRLING ROAD
Maccaferri was approached by Barratt Homes to come up  with a suitable solution for the posed site problems. It was   agreed that Visualizar
star
BORDERS RAIL
BORDERS RAIL
Maccaferri's gabions were used to support widened cuttings  extensively along the 35-mile route which connects   Edinburgh to Visualizar
star
BOSCASTLE FLOOD DEFENCES
BOSCASTLE FLOOD DEFENCES
To achieve this solution, Halcrow specified a combination of Reno Mattresses and MacMat-R from Maccaferri. Over 7000 sq metres of Maccaferri wire meshVisualizar
star
BOSCASTLE FLOOD DEFENCES
BOSCASTLE FLOOD DEFENCES
To achieve this solution, Halcrow specified a combination of Reno Mattresses and MacMat-R from Maccaferri. Over 7000 sq metres of Maccaferri wire meshVisualizar
star
BR 101 SUR KM 137
BR 101 SUR KM 137
Por sua facilidade de execução e por atender aos requisitos do projeto, foi escolhido como solução a realização de uma contenção a gravidade eVisualizar
star
BR-116
BR-116
A solução foi composta por uma malha de 2,5m de chumbadores de aço CA-50 de 25mm de diâmetro, com comprimento variando entre 8 e 12m, drenos horizVisualizar
star
BR-282
BR-282
Como existiam diversos pontos afetados, (cerca de 80 ocorrências de deslizamentos) e o prazo de execução das obras era de 180 dias, a solução adoVisualizar
star
BR-381
BR-381
Após estudos e verificações técnico-econômicas, a solução mais indicada para resolver o problema erosivo da rodovia, foi a construção de doisVisualizar
star
BRASAL VEÍCULOS
BRASAL VEÍCULOS
Visando a otimização da área, foi estabelecida a execução do Terramesh® Verde, que consiste na utilização de painéis de malha hexagonal de duVisualizar
star
BRAÚNA MINERADORA DE DIAMANTES
BRAÚNA MINERADORA DE DIAMANTES
A solução foi uma contenção em solo reforçado em Terramesh® Grid, com paramento totalmente vertical com altura de muro de 9,5 metros e geogrelhaVisualizar
star
BROOMLANDS PRIMARY SCHOOL
BROOMLANDS PRIMARY SCHOOL
Once the overall design had been agreed, Maccaferri was engaged to design, supply and install 8 free standing gabion walls which totalled 78.8m in lenVisualizar
star
BRUG VAN DEN AZIJN
BRUG VAN DEN AZIJN
Two 300 m long reinforced soil ramps up to 10.5 m high were designed by Maccaferri. The system chosen is called MacRes and it is comprised of concreteVisualizar
star
BUILDING OF THE HEAD OFFICE- GROUPE CHARIER
BUILDING OF THE HEAD OFFICE- GROUPE CHARIER
As part of this project, the company France MACCAFERRI created a facade cladding and a set of free walls in electro-welded gabions. The gabion claddinVisualizar
star
BUSINESS PARK
BUSINESS PARK
A Maccaferri propôs a utilização do geocomposto drenante MacDrain® 2L, que demonstrou várias vantagens. A execução do sistema foi iniciada com Visualizar
star
CÂMARAS FRIAS – FRIGORÍFICO MODELO
CÂMARAS FRIAS – FRIGORÍFICO MODELO
Após a realização de cálculos para o dimensionamento do piso, chegou-se a um pavimento com 20cm de espessura com uma dosagem de fibras metálicas Visualizar
star
CAMINO PERILAGO
CAMINO PERILAGO
A solução mais adequada para as necessidades da obra foi o solo reforçado. Foi dimensionado uma estrutura em Terramesh® System, onde o muro constrVisualizar
star
CANALIZACION CERRO EL BERRINCHE
CANALIZACION CERRO EL BERRINCHE
Después de los estudios realizados se determinó estabilizar el suelo mediante la canalización de aguas subterráneas, canalización de aguas de lluVisualizar
star
CANALIZACIÓN CO URBAN
A través de la empresa Ecodesing, S.A., se diseñó una estructura en gaviones recubiertos en PVC para realizar el trabajo de contención del rellenoVisualizar
star
CANALIZACION EN CAÑADA EL ELMBRUJO
CANALIZACION EN CAÑADA EL ELMBRUJO
Como sistema de contención, se propuso la construcción de un muro de gaviones con la tecnología PoliMac™, por su alta resistencia a la abrasión Visualizar
star
CANALIZACIÓN PARQUE SOLAR LOS PRADOS, HONDURAS
Se recomendó realizar una canalización trapezoidal con colchonetas y geotextil según sección mostrada la cual se adaptó perfectamente a las condiVisualizar
star
CANALIZACIÓN RÍO BARTOLO
CANALIZACIÓN RÍO BARTOLO
Re-excavación de la geometría del cauce y revestimiento mediante colchones Reno® de 0.23 m de espesor, con anclajes de gavión cada 20 m transversaVisualizar
star
CANALIZACION RIO LAS VACAS
CANALIZACION RIO LAS VACAS
Colocación de una estructura de contención de gaviones sobre una plataforma de deformación utilizando gavión tipo Colchón Reno® y geotextil noteVisualizar
star
CANTERA ZIORDIA
CANTERA ZIORDIA
To secure the area, two types of actions were carried out: 1. An active solution to prevent the larger blocks from being mobilised. This system consisVisualizar
star
CÁRCAVA EN AEROPUERTO DE ILOPANGO
CÁRCAVA EN AEROPUERTO DE ILOPANGO
Para la estabilización del talud se utilizó Terramesh® System, malla recubierta con PVC de 2.7mm. Se colocaron geogrilla MacGrid® hacia adentro deVisualizar
star
CARMEN DE PATAGONES
CARMEN DE PATAGONES
A estrutura projetada para evacuar o escoamento superficial é do tipo escada de dissipação. A mesma está formada somente por gabiões caixa de 1mVisualizar
star
CARRETERA COMENDADOR ALBERTO BONFIGLIOLI, KM 1
CARRETERA COMENDADOR ALBERTO BONFIGLIOLI, KM 1
Como solução de estabilização, a proteção do terrapleno foi realizada com malha hexagonal de dupla torção MacMat® HS 100. A solução propostVisualizar
star
CARRETERA DE ACERO – ACCIONA
CARRETERA DE ACERO – ACCIONA
A solução adotada foi a aplicação de geomanta reforçada MacMat® R aliada a um sistema de chumbadores de até 3m de comprimento, afim de controlaVisualizar
star
CARRETERA DE LA CACHOEIRA
CARRETERA DE LA CACHOEIRA
A solução aplicada seria escolhida em função da combinação de uma rápida instalação, proteção imediata contra os processos erosivos, integrVisualizar
star
CASAS BAHIA
CASAS BAHIA
Foram previstas várias soluções, onde foram instalados chumbadores ao longo dos taludes inferiores, com a finalidade de estabilizar o maciço. TambVisualizar
star
CASINO CALAFATE
CASINO CALAFATE
Foi decidida a construção dessas contenções em muros de gabiões, pois além das questões técnicas e econômicas, o uso dos gabiões ainda resuVisualizar
star
CATO MANOR PIPELINE & ROAD PROTECTION
CATO MANOR PIPELINE & ROAD PROTECTION
Maccaferri Africa /African Gabions was asked to propose a structure that would retain the affected road embankment. The proposed structure was a combiVisualizar
star
CENTRO CULTURAL Y FINANCIERO MAU MAU
Maccaferri propuso el uso de geocompuesto drenante MacDrain® FP 2L, que demostró varías ventajas. La ejecución del sistema se inició con la aplicVisualizar
star
CENTRO DE INVESTIGACIÓN E INNOVACIÓN
CENTRO DE INVESTIGACIÓN E INNOVACIÓN
A solução adotada seria responsável tanto pela estabilização superficial do maciço quanto pela proteção superficial da instauração de procesVisualizar
star
CHOI YING ESTATE DEVELOPMENT
CHOI YING ESTATE DEVELOPMENT
Maccaferri Gabions are cages which are engineered from double twisted hexagonal woven steel wire mesh. Delivered flat-packed, our gabions are assembleVisualizar
star
CIUDAD DE CONCEPCIÓN DEL URUGUAY
CIUDAD DE CONCEPCIÓN DEL URUGUAY
A obra de defesa está composta por duas partes: uma área de 1.660 metros de comprimento, com um traçado paralelo às ruas em sentido leste-oeste daVisualizar
star
CIUDAD FEDERACIÓN
CIUDAD FEDERACIÓN
Para proteger a região da margem optou-se pela construção de um muro de gabiões e a regularização do talude. Para a zona do aterro de aproximaçVisualizar
star
CLIPPER WASH BANK PROTECTION
CLIPPER WASH BANK PROTECTION
A gabion groyne system was selected to protect the bank from erosion and restore the limits of the bank to its original position. Groynes are finger-lVisualizar
star
CLOSE ROAD – RIO RUIDOSO CROSSING STRUCTURE
CLOSE ROAD – RIO RUIDOSO CROSSING STRUCTURE
The proposed channel is approximately 28 feet wide and 6  feet tall. The proposed channel sidewalls will be stabilized   with gabiVisualizar
star
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
Existing rubble mound breakwater was planned to be extended towards sea by about 500m using geotextile tubes (MacTube). The purpose was to reduce the Visualizar
star
COBHAM SERVICES HGV PARKING AREA EXPANSION
COBHAM SERVICES HGV PARKING AREA EXPANSION
The proposal was to increase the HVG parking numbers by  79 new spaces, to the west of the petrol filling station. The   proposal Visualizar
star
COLEGIO SAN CALIXTO
COLEGIO SAN CALIXTO
Foi proposto um sistema drenante que evite a presença de águas e pontos que possam comprometer o comportamento satisfatório da estrutura. Por isso,Visualizar
star
COLLEY LANE SOUTHERN ACCESS ROAD
COLLEY LANE SOUTHERN ACCESS ROAD
The ParaLink LTPs will transfer loads of the mechanically  stabilised earth walls into the pile foundations beneath. The maximum heightVisualizar
star
COMPANHIA VALE DO RIO DOCE
COMPANHIA VALE DO RIO DOCE
Foi construída uma estrutura de contenção à gravidade e proteção de margem em gabiões. A estrutura foi dimensionada com altura de 6 m por uma eVisualizar
star
CONCEPA – BR 290
CONCEPA – BR 290
A solução adotada consiste em um sistema de drenagem formado pelo geocomposto drenante MacDrain® TD associado a um tubo dreno, aplicado na interfacVisualizar
star
CONDOMINIO LA FONTANA
CONDOMINIO LA FONTANA
La propuesta fue utilizar revestimiento de talud, se aplico MacMat® R, que consiste en una manta de control de erosión producida de filamentos de poVisualizar
star
CONDOMINIO VISTAS DE SANTA ANA
CONDOMINIO VISTAS DE SANTA ANA
Se propuso un muro cabezal para confinar las alcantarillas de concreto de lado a lado. Los muros son simétricos para contener el relleno tanto en la Visualizar
star
CONEXIÓN CAJAZEIRAS V Y X
CONEXIÓN CAJAZEIRAS V Y X
Tal melhoria seria a criação de uma plataforma para a ampliação da via, através da construção de uma estrutura de contenção em solo reforçadVisualizar
star
CONEXIÓN INTERCAMBIO VIAL DE LA CARRERA 80
CONEXIÓN INTERCAMBIO VIAL DE LA CARRERA 80
Para solucionar la necesidad de la obra, y por temas de rapidez y facilidad constructiva, se optó por la construcción de un muro en suelo reforzado Visualizar
star
CONEXIÓN ROBLEDO – MASAVIELLE
CONEXIÓN ROBLEDO – MASAVIELLE
Para solucionar el problema de la estabilidad de la estructura de la bodega, se realizaron anclajes activos bajo la superficie, sosteniendo de esta foVisualizar
star
CONEXIÓN VIAL ABURRÁ – TALUD LOMA HERMOSA
CONEXIÓN VIAL ABURRÁ – TALUD LOMA HERMOSA
La parte alta del talud fue estabilizada estructuralmente por medio de refuerzos conformados por anclajes activos y pantalla de concreto lanzado, por Visualizar
star
CONEXIÓN VIAL ABURRÁ – TALUD OLAYA
CONEXIÓN VIAL ABURRÁ – TALUD OLAYA
Una parte del talud fue estabilizada estructuralmente con el auxilio e instalación de refuerzos conformados por anclajes activos y pantalla de concreVisualizar
star
CONFORMACIÓN MURO PRESA DE RELAVE EL CHOCÓ
CONFORMACIÓN MURO PRESA DE RELAVE EL CHOCÓ
Para realizar el análisis del proyecto se revisan dos opciones de las cuales la opción con mejor aprovechamiento del material de relave que la mina Visualizar
star
CONSTRUCCION DE MUROS DE SUELO REFORZADO FANCESA
CONSTRUCCION DE MUROS DE SUELO REFORZADO FANCESA
La solución utilizada fue la construcción de una estructura de suelo reforzado en Terramesh Grid, que cumplía técnicamente todas las exigencias dVisualizar
star
CONSTRUCTION DE LA ROUTE DE LA CORNICHE DE BRAZZAVILLE
CONSTRUCTION DE LA ROUTE DE LA CORNICHE DE BRAZZAVILLE
The Paraweb® MD45 geoband reinforcements were used and perfectly adapted to the intermediate material embankments (Type 3 according to NF EN 14475). Visualizar
star
CONTENCIÓN A GRAVEDAD EN RIO NEGRO
CONTENCIÓN A GRAVEDAD EN RIO NEGRO
Dentre as opções de soluções apresentadas, foi adotada para contenção do aterro o muro à gravidade em gabiões. Devido à variação do nível Visualizar
star
CONTENCIÓN DE TALUDES ROCOSOS EN FERROCARRILES
CONTENCIÓN DE TALUDES ROCOSOS EN FERROCARRILES
A solução encontrada para eliminação do risco foi a estabilização superficial da encosta, através de chumbadores e tela metálica, dividindo a Visualizar
star
CONTENCIÓN EN GAVIONES CAJA – CARRETERA BR-010
CONTENCIÓN EN GAVIONES CAJA – CARRETERA BR-010
Recomposição do maciço erodido para recuperação do corpo estradal, suavização dos taludes da antiga jazida, que se encontrava vertical e com inVisualizar
star
CONTENCIÓN EN SUELO REFORZADO – TRITURADORA PRIM
CONTENCIÓN EN SUELO REFORZADO – TRITURADORA PRIM
A solução foi executar uma contenção em solo reforçado de Terramesh® System associado à geogrelhas MacGrid® WG 150 para reforço no aterro, coVisualizar
star
CONTENCIÓN EN SUELO REFORZADO-AV. INDEPENDENCIA
CONTENCIÓN EN SUELO REFORZADO-AV. INDEPENDENCIA
Elaborada pela consultoria Hidrosan, com o apoio do corpo técnico da Maccaferri, foi projetado uma estrutura em solo reforçado Terramesh® Grid com Visualizar
star
CONTENCIONES ERS 115 – KM 27 E KM 29
CONTENCIONES ERS 115 – KM 27 E KM 29
A solução encontrada foi a execução de um muro em solo reforçado com Terramesh® System. Quando atingido o fundo da escavação, iniciou-se a conVisualizar
star
CONTROL CAÍDA DE ROCAS EN BULEVAR MONS. ROMERO
CONTROL CAÍDA DE ROCAS EN BULEVAR MONS. ROMERO
Para proteger al tránsito vehicular de cualquier desprendimiento que se pudieran dar en los taludes, se optó por utilizar malla de alta resistencia.Visualizar
star
CONTROL DE EROSIÓN Y CONTENCIÓN A LA GRAVEDAD
CONTROL DE EROSIÓN Y CONTENCIÓN A LA GRAVEDAD
Estabilização do talude com contenção à gravidade em gabiões, com 5 metros de altura e proteção contra erosão com MacMat® R3. A solução prVisualizar
star
ÇÖPLER GOLD MINE ROCK FALL PROJECT
ÇÖPLER GOLD MINE ROCK FALL PROJECT
In accordance with the urgency of the situation, the size of the potentially dangerous rocks on the slope and in line with the technical and economic Visualizar
star
CRECHE HEROÍNAS DO LAR
CRECHE HEROÍNAS DO LAR
O sistema de estabilização concebido é composto por uma rede metálica de alta resistência, MacMat® MO 200, solidarizada à cabeça dos Grampos aVisualizar
star
CRECHE HEROÍNAS DO LAR
CRECHE HEROÍNAS DO LAR
El sistema de estabilización está compuesto por una malla metálica de alta resistencia, MacMat® MO 200, unida a la cabeza de las grapas a través deVisualizar
star
DANFOSS FACTORY
DANFOSS FACTORY
Maccaferri were approached by Quattro Consult Limited in  July 2021 to propose a suitable high strength geogrid for use   as a basVisualizar
star
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
Maccaferri worked with Wood Patel Engineering to design a hydraulic solution for the microprocessor manufacturer TSMC. To reduce the soil erosion alonVisualizar
star
DEBRIS FLOW PROTECTION LERINI STREAM
DEBRIS FLOW PROTECTION LERINI STREAM
After a fierce challenge against the competitor, Maccaferri Balkans won this project thanks to a mix of high performing technical solutions, cost effeVisualizar
star
DELTA MARINA GUARDERÍA NÁUTICA
DELTA MARINA GUARDERÍA NÁUTICA
Para acelerar el proceso de consolidación y evitar daños a la infraestructura por asentamientos, se instalaron drenes verticales MacDrain® V. Esta Visualizar
star
DEPÓSITO DE COMBUSTIBLE DE LA MARINA
DEPÓSITO DE COMBUSTIBLE DE LA MARINA
Uma parte importante das soluções utilizadas em todo o estado, foram as obras de revestimento e estabilização de encostas com a solução em solo Visualizar
star
DEPÓSITO SAN JUAN
DEPÓSITO SAN JUAN
Para a execução desse reservatório, foi utilizada nossa geomembrana MacLine® SDH e o geotêxtil nãotecido MacTex® N, para a proteção dos taludVisualizar
star
DER – SP
DER – SP
A solução adotada foi a substituição dos drenos convencionais pelo sistema de drenagem MacDrain® TD, por ter um método construtivo rápido e de Visualizar
star
DESHIDRATACIÓN DE LODOS
DESHIDRATACIÓN DE LODOS
Incorporou-se um sistema de desidratação de lodos mediante os geotubos MacTube® para fazer uma limpeza inicial de ambas lagoas e funcionar como umVisualizar
star
DILMUNIA GRAND CANAL & MARINA (DGCM)
DILMUNIA GRAND CANAL & MARINA (DGCM)
The construction of the Dilmunia canal is the object of an international Tender. The tender design for the waterproofing works has been developed by tVisualizar
star
DISIPADORES DE GAVIONES PONTAL SUL
DISIPADORES DE GAVIONES PONTAL SUL
O maior desafio era a elevada vazão dos bueiros, sendo eles: um duplo celular de seção 2,5 x 2,5 m , um tubular de 1,0m e outro de 0,80m de diâmeVisualizar
star
Drainage of structures
Drainage of structures
The adopted solution was the construction of draining trenches using the MacDrain® TD geocomposite as lateral base drains. These drains are designed Visualizar
star
DRENAGEM DE FLOREIRAS EM JARDIM ELEVADO
DRENAGEM DE FLOREIRAS EM JARDIM ELEVADO
As floreiras foram criadas a partir de pequenos muros de alvenaria impermeabilizados por manta asfáltica, assim como o fundo das floreiras e o pátioVisualizar
star
DRENAJE DE AGUAS LLUVIAS  RESIDENCIAL LOS SUEÑOS
DRENAJE DE AGUAS LLUVIAS  RESIDENCIAL LOS SUEÑOS
Ante dicha necesidad, se optó por la construcción de un dren francés, compuesto por piedra, geotextil y un recubrimiento de malla doble torsión paVisualizar
star
DRENAJE EN MURO DE HORMIGON
DRENAJE EN MURO DE HORMIGON
El dren de grava se reemplazó por el MacDrain® FP, el cual, aportó los siguientes beneficios al proyecto: disminución del tiempo de ejecución delVisualizar
star
DRENAJE PLUVIAL BR 230 KM 40
DRENAJE PLUVIAL BR 230 KM 40
Por sua facilidade de execução e por atender aos requisitos do projeto, foi escolhido como solução a realização de uma canaleta retangular e proVisualizar
star
DRENAJE SUBSUPERFICIAL – RN 123 FELIPE YOFRE
DRENAJE SUBSUPERFICIAL – RN 123 FELIPE YOFRE
Se adoptó como solución la ejecución de un sistema de drenaje subsuperficial del tipo trinchera drenante, con MacDrain® TD, ubicados a ambos costaVisualizar
star
DRENAJE SUBSUPERFICIAL – RODOVIA PA-287
DRENAJE SUBSUPERFICIAL – RODOVIA PA-287
A solução adotada foi a substituição do dreno convencional (DPS 07) por um sistema formado por geocomposto para drenagem, que é um geossintéticoVisualizar
star
DRENAJES RUTA 27
DRENAJES RUTA 27
Se propuso realizar un sistema de drenajes a lo largo de la ruta 27 con la utilización de Geocompuestos para drenaje MacDrain® TD que fue especialmVisualizar
star
ECOVIA BR – 277
ECOVIA BR – 277
Para retificar o problema, optou-se pela execução de uma estrutura de contenção em gabiões que apresentava vantagens econômicas, além de ser umVisualizar
star
EDIFÍCIO PROSPERE
EDIFÍCIO PROSPERE
A solução adotada para esta obra foi a substituição dos drenos convencionais por um sistema interligado, formado pelos geocompostos drenantes MacDVisualizar
star
EDIFÍCIO VIA BRISA
EDIFÍCIO VIA BRISA
Foram elaboradas cortinas, colchão e trincheiras drenantes. Na cortina e no colchão drenante, optou-se pela utilização do MacDrain® FP, que cobriVisualizar
star
EJECUCIÓN DE TRINCHERA DRENANTE CON MACDRAIN® TD
EJECUCIÓN DE TRINCHERA DRENANTE CON MACDRAIN® TD
A solução adotada para os problemas em questão foi a utilização dos geocompostos MacDrain® TD, dotados de uma bolsa prevista no processo de fabrVisualizar
star
ELEGANCE PARK SUL
ELEGANCE PARK SUL
O projeto original previa a utilização do sistema convencional, entretanto, o sistema de drenagem MacDrain® conseguiu sobressair nos quesitos técnVisualizar
star
EROSION CONTROL AGAINST MAMMAL BURROWING
EROSION CONTROL AGAINST MAMMAL BURROWING
Maccaferri was approached by contractors Crown Services Ltd and asked for advise on a suitable steel wire mesh system that could provide the required Visualizar
star
EROSION CONTROL AT CISUMDAWU TOLL ROAD-PHASE II-TUNNEL AREA
EROSION CONTROL AT CISUMDAWU TOLL ROAD-PHASE II-TUNNEL AREA
The inclination of the slopes is 45° degree (V:H = 1:1), referring to Public Works Ministry Specification “Spesifikasi Khusus Interim SKh-1.3.17 PeVisualizar
star
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
Maccaferri has proposed the erosion control system consisting of rolled erosion control products (RECP)-MacMat R (Steel reinforced synthetic geomat) aVisualizar
star
EROSIÓN VILA FORMOSA
EROSIÓN VILA FORMOSA
Foram elaborados projetos de engenharia com a aplicação de soluções em gabiões e geossintéticos, com o objetivo de mitigar o processo erosivo seVisualizar
star
ESCALERA DE DISIPACIÓN ARROYO VACA BRAVA
ESCALERA DE DISIPACIÓN ARROYO VACA BRAVA
Após elaboração dos estudos hidrológicos, hidráulicos e geotécnicos do local afetado, foram adotadas soluções em estruturas de contenção e dVisualizar
star
ESCOLA WALDORF
ESCOLA WALDORF
O telhado verde foi projetado em toda a cobertura da escola e foi sustentado em paredes moldadas com um composto de solo aglutinado com baba de cupim Visualizar
star
ESCUELA CAMPO ALEGRE
ESCUELA CAMPO ALEGRE
La propuesta consistió en desarrollar una obra de estabilización de taludes con sistemas de anclajes y protección superficial con MacSteel® asociaVisualizar
star
ESTABILIZACIÓN DE TALUDES
ESTABILIZACIÓN DE TALUDES
Las cárcavas de los taludes fueron rellenadas con tenzontle para restaurar la continuidad geométrica y estructural, la superficie del talud se proteVisualizar
star
ESTABILIZACION TALUD HIDROELECTRICA PALO VIEJO
ESTABILIZACION TALUD HIDROELECTRICA PALO VIEJO
Se decidió implementar una red de malla en doble torsión para controlar la caída de rocas y así evitar daños en el canal. Visualizar
star
ESTABILIZACIÓN TALUD, CLUB DE GOLF, CD. MX.   
ESTABILIZACIÓN TALUD, CLUB DE GOLF, CD. MX.   
Debido a la ocurrencia de una falla global, se optó por realizar una estabilización profunda por medio de anclas de tensión y fijación, mientras Visualizar
star
ESTABILIZACIÓN TALUDES UF4 RUMICHACA PASTO
ESTABILIZACIÓN TALUDES UF4 RUMICHACA PASTO
En los cortes realizados para la construcción de la vía y los taludes altos que la rodean existen variedad de materiales, algunos con únicamente unVisualizar
star
ESTABILIZACIÓN TRONCAL CENTRAL DEL NORTE
ESTABILIZACIÓN TRONCAL CENTRAL DEL NORTE
Para solucionar el problema y garantizar nuevamente la seguridad y la estabilidad del talud, Alca Ingenieria buscó apoyo en Maccaferri para buscar unVisualizar
star
ESTABILIZACIÓN ZONAS CONCESIÓN PACIFICO 2
ESTABILIZACIÓN ZONAS CONCESIÓN PACIFICO 2
Dentro del proyecto , el km 33 tenía que ser intervenido con soluciones que fueran sostenibles y permitieran el crecimiento de la vegetación y la peVisualizar
star
ESTACIÓN DE TRATAMIENTO
ESTACIÓN DE TRATAMIENTO
Para obter um ótimo armazenamento e evitar a fuga das águas contaminadas, procedemos com a instalação da nossa geomembrana MacLine® SDH, com a quVisualizar
star
ESTÁDIO BENTO DE ABREU
ESTÁDIO BENTO DE ABREU
Após serem realizados estudos de viabilidade, foi definido que os geocompostos MacDrain® TD são a melhor solução técnica e econômica para a obrVisualizar
star
ESTADIO DE BAETÃO
ESTADIO DE BAETÃO
Foi realizada no estádio do Baetão a substituição de seu gramado natural utilizando um novo sistema de drenagem com a utilização de geocompostosVisualizar
star
ESTÁDIO ORLANDO SCARPELLI
ESTÁDIO ORLANDO SCARPELLI
Como a reconstrução do sistema de drenagem deveria ser o primeiro trabalho a ser executado, era imprescindível que a solução a ser adotada fosse Visualizar
star
ESTRADA RJ-153
ESTRADA RJ-153
O projeto de recuperação elaborado pela Geomecânica em parceria com o DER, consistia em uma estrutura em solo reforçado em Terramesh® System, MacVisualizar
star
ESTUÁRIO DO RIO ESMERALDAS
ESTUÁRIO DO RIO ESMERALDAS
Foi proposto a utilização do Terramesh® System para a execução da plataforma. A estrutura em solo reforçado necessitou de uma altura máxima de Visualizar
star
EX-MUSEO KUSILLO
EX-MUSEO KUSILLO
A estabilização do setor começou com a modificação geométrica do talude dando a ele um fator de segurança adequado, foram realizadas posteriormVisualizar
star
EXPANSIÓN DE UNIDAD PRODUCTIVA EN LOUVEIRA
EXPANSIÓN DE UNIDAD PRODUCTIVA EN LOUVEIRA
Executaram-se sistemas de contenção em solo reforçado com 1 km de extensão e até 20 metros de altura, em linhas retas e curvas, acompanhando sempVisualizar
star
EXPO HOUSE AT DOHA EXPO 2023
EXPO HOUSE AT DOHA EXPO 2023
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of geosynthetic products in our portfolio that cVisualizar
star
EXTENSION OF THE CHANTERAINES PARK
EXTENSION OF THE CHANTERAINES PARK
The Conseil Général 92 chose double-twist gabion cages because they allow the filling materials to show through easily. The infill stone chosen comeVisualizar
star
FÁBRICA DE CARRETAS RANDON
FÁBRICA DE CARRETAS RANDON
A solução escolhida foi a utilização do sistema Terramesh® System, pois permitia a execução do aterro com a contenção, além de ser uma estruVisualizar
star
FARM FRITES
FARM FRITES
A solução encontrada foi elaborar um pavimento utilizando fibras de aço Wirand® FF3 com espessura de 0,26m numa dosagem de 35 Kg/m³. Desses 26cm Visualizar
star
FEDERAL MALL
Se plantea y se construye un muro de suelo reforzado con una longitud de 85 metros lineales y una altura máxima de 12 metros escalonados, esta fue laVisualizar
star
FERNÃO DIAS KM 18+500
FERNÃO DIAS KM 18+500
A solução adotada foi a realização de um revestimento simples com SteelGrid® HR 100, para controlar a queda dos pequenos blocos, e nos trechos dVisualizar
star
FERROVIA CARAJÁS
FERROVIA CARAJÁS
A consultoria ASTEP, realizou um estudo de viabilidade para estrutura de contenção em solo reforçado com geogrelhas, a ser construída na LocaçãoVisualizar
star
FESTIVAL SUPERMALL MOUND PROMONTORY
FESTIVAL SUPERMALL MOUND PROMONTORY
After several discussions with FLI engineers, Maccaferri’s robust erosion protection geoblanket (MacMat R) has been approved for the project. DueVisualizar
star
FLOOD EMERGENCY RESPONSE PROJECT
FLOOD EMERGENCY RESPONSE PROJECT
In May 2019, before the flood reached its peak, the city was able to create flood control barriers using FlexMac DT in multiple strategic locations toVisualizar
star
FORTALECIMIENTO DE PISO INDUSTRIAL
La solución para abordar la problemática geomecánica en suelos de rellenos no controlados y la ejecución del piso industrial de almacenamiento es Visualizar
star
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
Maccaferri proposed the use of the MacWall Vertica 4°  Segmental Block Retaining Wall System. The 4° batter of   this system creVisualizar
star
FV17 LIAFJELLET-OLVIKVATNET
FV17 LIAFJELLET-OLVIKVATNET
Maccaferri, in cooperation with its local partner PRETEC AS, proposed an optimized solution to the contractor and the investor, aimed at enhancing theVisualizar
star
Gabion Defense – Cajuca East Corridor
Gabion Defense – Cajuca East Corridor
The Provincial Municipality of Nazca was in charge of the technical file through its technical study department. The hydraulic approach they determineVisualizar
star
GABION WALLS FOR SAHARA AAMBY VALLEY CITY
GABION WALLS FOR SAHARA AAMBY VALLEY CITY
A series of self-draining, flexible, eco-friendly Gabion walls have been provided in Sahara Lake City along external/internal roads, mini club area, cVisualizar
star
GALPÓN LOGÍSTICO
GALPÓN LOGÍSTICO
Após avaliação do local e do projeto, foram executados muros à gravidade em gabião caixa, projetados com uma seção máxima de 6,50 metros e extVisualizar
star
GASDUC III
GASDUC III
Foi realizado um estudo da obra, de modo que, a solução em solo reforçado com os elementos Terramesh® System dispostos em faixas de aterro suficieVisualizar
star
GASODUCTO NORTE
GASODUCTO NORTE
Foi projetado para ordenar e controlar o escoamento superficial, uma escada de dissipação. A estrutura da escada foi formada por colchões Reno® deVisualizar
star
GASODUTO CABIÚNAS (GASDUC III)
GASODUTO CABIÚNAS (GASDUC III)
Para solucionar o problema, era necessário um material eficiente e de rápida instalação, em substituição à proteção convencional com esteirasVisualizar
star
HACIENDA TECHO DEL MUNDO
HACIENDA TECHO DEL MUNDO
Para a solução do problema, foi proposto a construção de um solo reforçado com o sistema Terramesh® Verde. Felizmente o material de corte cumpriVisualizar
star
HAROLD COURT EAST REGIONAL SERVICE CENTER
HAROLD COURT EAST REGIONAL SERVICE CENTER
The project was initially designed as a series of 9 ft. tall gravity retaining walls along the steep slope with 10 ft. terraces in between. The challeVisualizar
star
HASANKEYF ARCHEOPARK PROJECT
HASANKEYF ARCHEOPARK PROJECT
The retaining walls, which will reach a height of 27 meters within the scope of the Hasankeyf archeopark project, has been designed with Terramesh SysVisualizar
star
HELBOR BROOKLIN
HELBOR BROOKLIN
The solution for this project involved the demolition of the existing retaining wall and the installation of a vertical drainage system using the MacdVisualizar
star
HENNEAULAAN ZAVENTEM
HENNEAULAAN ZAVENTEM
Maccaferri´s Corporate Technical Department, in cooperation with the local partner TEXION, has proposed an optimised solution with has supported the Visualizar
star
HIDROELÉCTRICA EL CAFETAL
HIDROELÉCTRICA EL CAFETAL
Para controlar que el material de desprendimientos no golpeara y dañara la tubería, se optó por proteger el talud longitudinalmente con malla de alVisualizar
star
HIDROELÉTRICA DE AMOYA
HIDROELÉTRICA DE AMOYA
Com a finalidade de proteger o pórtico para cabos no portal do túnel de acesso e garantir a segurança das pessoas que circulam pelo local, a MaccafVisualizar
star
HORMIGONADO DE DUCTO
HORMIGONADO DE DUCTO
Através da parceria formada pela OAS, COPPE-UFRJ e Maccaferri, foram realizados testes supervisionados pela Petrobrás, que comprovaram a eficiênciaVisualizar
star
HOSPITAL DEL IPASGO
HOSPITAL DEL IPASGO
Para evitar qualquer tipo de patologia devido a infiltração de água, foi adotado sistema de drenagem completo, sendo: cortinas drenantes, trincheirVisualizar
star
HOSPITAL DR. PEDRO ELIZALDE
HOSPITAL DR. PEDRO ELIZALDE
A exigência da construtora DYCASA era que a solução, além de resolver o problema, fosse também esteticamente agradável para a obra. Foi elaboradVisualizar
star
HUHUGAM HERITAGE CENTER
HUHUGAM HERITAGE CENTER
The aesthetics of gabions were desirable, yet a traditional gabion retaining structure would be very expensive. Therefore Maccaferri suggested the useVisualizar
star
IGARAPÉ DO SÃO RAIMUNDO – PARQUE RIO NEGRO
IGARAPÉ DO SÃO RAIMUNDO – PARQUE RIO NEGRO
O Governo do Amazonas decidiu revitalizar a área, desapropriou os moradores das palafitas e decidiu criar na região uma grande área de lazer, o ParVisualizar
star
IMPERMEABILIZACIÓN EN RELLENO SANITARIO
IMPERMEABILIZACIÓN EN RELLENO SANITARIO
Para proteger e impermeabilizar el suelo de los lixiviados se utilizó una geomembrana de alta densidad HPDE MacLine® de 1.5 mm de espesor, debido a Visualizar
star
INSTALACION DE MALLAS CERRO SANTA ANA
INSTALACION DE MALLAS CERRO SANTA ANA
Maccaferri de Ecuador realizó una evaluación de la condición actual del macizo rocoso que forma parte del Cerro Santa Ana, evidenciando el desprendVisualizar
star
INSTITUTO NACIONAL DE VIAS – INVIAS
INSTITUTO NACIONAL DE VIAS – INVIAS
Para solucionar el problema y garantizar nuevamente la seguridad y la estabilidad del talud, el Instituto Nacional de Vías ordenó la construcción dVisualizar
star
INVIAS – VIA LA MANSA
INVIAS – VIA LA MANSA
Para contrarrestar la caída de bloques se realizaron refuerzos activos en algunas partes del talud, mientras en otras se realizó una limpieza del maVisualizar
star
IPO DAM SILT CURTAINS
IPO DAM SILT CURTAINS
To address the degradation of the Ipo Dam and mitigate the adverse effects of soil erosion and water contamination, various long-term solutions are beVisualizar
star
ITUPEVA BUSINESS PARK
ITUPEVA BUSINESS PARK
A solução mais eficiente quanto aos requisitos de resistência foi encontrada com a utilização do concreto reforçado com fibras metálicas WirandVisualizar
star
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
Byrne Looby and Partners were engaged by main contractor Siac Ltd, to value engineer the originally designed proposals as detailed on the project drawVisualizar
star
KOSOVO MOTORWAY PROJECT
KOSOVO MOTORWAY PROJECT
Mainly, seven Paramesh system walls have been built: WL 015, WL 024, WL 060, WR 131, WR 134, WR 139, WR 406. The main products used are Terramesh SystVisualizar
star
KURINGEN BRIDGE 19
KURINGEN BRIDGE 19
The new bridge in Kuringen is built according to the principle of generic bridges used at various locations along the Albert Canal. The bridge has beeVisualizar
star
LA PASTINA IMP. EXP. LTDA
LA PASTINA IMP. EXP. LTDA
A solução adotada foi a utilização da geogrelha MacGrid® WG, que atendeu todos os requisitos necessários para esta aplicação, conforme as espeVisualizar
star
LAGUNA RIEGO-RESERVORIO 7
Se diseño un conjunto de lagunas, siendo la presente el reservorio no. 7, con una extensión de aproximadamente 30,000 mts2, la cual fue impermeabiliVisualizar
star
LANPING LEAD-ZINC MINING SANCHONGSHAN DUMP RETAINING WALL PROJECT
LANPING LEAD-ZINC MINING SANCHONGSHAN DUMP RETAINING WALL PROJECT
According to the geological conditions and engineering requirements of the project, the owner and the design unit comprehensively consider the economyVisualizar
star
LICEO LAS LAGUNAS
LICEO LAS LAGUNAS
Se recomendó realizar un muro Terramesh® System PoliMac™ en todo el perimetro trasero, con altura máxima de 9.0m, para evitar problemas futuros. Visualizar
star
LIEBHERR DO BRASIL
LIEBHERR DO BRASIL
Como complemento ao uso das fibras de aço Wirand® e com o intuito de manter o mesmo nível tecnológico elevado no reforço da base do piso, foram uVisualizar
star
LINCOLNSHIRE EFW
LINCOLNSHIRE EFW
Consulting engineers, Arup, devised a two stage system of  ground level wet and dry holding lagoons. These were   impermeably lineVisualizar
star
LINHA FERROVIÁRIA DE SÃO PAULO
LINHA FERROVIÁRIA DE SÃO PAULO
Foram instalados chumbadores e placas de ancoragem por toda a encosta, juntamente com redes de alta resistência com a função de proteção superficVisualizar
star
LISTENING MIRRORS HISTORIC SITE
LISTENING MIRRORS HISTORIC SITE
In the first phase of the project the peninsula housing the Mirrors was cut off to create an island linked to the mainland by a swing footbridge, and Visualizar
star
LITORAL CALETA OLÍVIA
LITORAL CALETA OLÍVIA
Optou-se pela solução em gabiões revestidos com PVC, onde a solução consiste em uma base de 3m de altura de enrocamento, que suporta o impacto diVisualizar
star
LÖTZGALERIE
LÖTZGALERIE
The client chose the most economical system. The Maccaferri RB 3000 safety net with an energy of 3000 kJ and a height of 5 m. It was a great challengeVisualizar
star
Lower Campbell Repair
Lower Campbell Repair
The erosion control solution consisted of a six to nine-foot-tall, stair-stepped, gabion wall, with a concrete floor base. MaxTex® H 60.1 iVisualizar
star
LU-A13 DUDELANGE-BURANGE
LU-A13 DUDELANGE-BURANGE
The loads applied varied from 26 kN/sqm up to 44 kN/m2 in correspondence of the traffic lanes and 5 kN/sqm for the pedestrian and bicycle path. 4,000Visualizar
star
LUOYANG FOUR RIVER TONGZHI PROJECT
LUOYANG FOUR RIVER TONGZHI PROJECT
Maccaferri Gabion + Renomesh solutions improve the overall defense capability of protecting the river bank. Overall consideration of the relationshipVisualizar
star
M606 MOTORWAY / M62 JUNCTION
M606 MOTORWAY / M62 JUNCTION
Maccaferri’s double twist woven gabions have been used to  create an approximately 450m, the combined length of road[1]side retaining wallVisualizar
star
MacSport AC Monza
MacSport AC Monza
Per il rifacimento del campo di allenamento, sono state coinvolte diverse aziende specializzate nel settore delle infrastrutture sportive, tra cui ItaVisualizar
star
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
Constructing a slope protection system along these road sections will promote the road's resiliency and is geared to improve the life and well-beiVisualizar
star
MANTEMINIENTO PREVENTIVO DE LA CARRETERA LA PAZ
MANTEMINIENTO PREVENTIVO DE LA CARRETERA LA PAZ
Foi apresentada a rede de alta resistência para revestimento e controle de queda de rochas, já que era necessário o máximo nível de segurança. NVisualizar
star
Marginal Protection for the Tonameca River
Marginal Protection for the Tonameca River
Emergency actions such as dredging and the establishment of temporary embankments were implemented. Subsequently, hydrological and topographic studiesVisualizar
star
Mass Gravity Retaining Walls
Mass Gravity Retaining Walls
According to the premises outlined in the Environmental Recovery Plan (PRAD) provided by the client, the best solution among the available options in Visualizar
star
MEERHOUT BRIDGE 34
MEERHOUT BRIDGE 34
The design of the reinforced soil structure has been carried out following the Eurocode 7 in combination with the Belgian Annex. The possibility to moVisualizar
star
MEJORAMIENTO ESTADIO MUNICIPAL
MEJORAMIENTO ESTADIO MUNICIPAL
Basándose en las intensidades de lluvia según Manual de Carreteras de Chile volúmen 3 es que se determinó usar un diseño que incorpora la utilizaVisualizar
star
METAL DECK CON FIBRAS DE ACERO WIRAND®
METAL DECK CON FIBRAS DE ACERO WIRAND®
Dentre todas as alternativas estudadas, a ideal foi a execução de um deck metálico onde a armadura prevista para os efeitos de retração e temperaVisualizar
star
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
The comprehensive solution involved Maccaferri's expertise and a strategic selection of materials to optimize the environmental remediation procesVisualizar
star
MINA CASA DE PEDRA
MINA CASA DE PEDRA
A solução técnica contemplava um muro de Terramesh® System associado com camadas reforçadas pelas geogrelhas MacGrid® WG. Devido a rápida execuVisualizar
star
MINA OMYA ANDINA S.A.
MINA OMYA ANDINA S.A.
Para evitar poner en riesgo la seguridad del personal, de los operadores y de los equipos que trabajan en la mina, se realizó una limpieza del materiVisualizar
star
MINE D’OR DU TASIAST MASSIF DE L’ADRAR
The Terramesh® system is a system that combines a gabion facing with a continuous wire mesh reinforcement of the facing. The gabion part ensures a neVisualizar
star
MINERA  PLANTA DE BARRO ALTO
MINERA  PLANTA DE BARRO ALTO
Primeiramente, foi feita a remoção de todo o material solto proveniente da ruptura. A posteriori, foi feita a execução do muro à gravidade em gabVisualizar
star
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
Maccaferri worked in a JV to implement slope stabilization solutions for landslide zone between Km 504.00 to Km 505.00 on NH-58. It included shifting Visualizar
star
MIXED RSS FOR THE RRESHEN-KALIMASH HIGHWAY
MIXED RSS FOR THE RRESHEN-KALIMASH HIGHWAY
Bechtel-Enka brought in geotechnical specialists, Officine Maccaferri in a partnership arrangement to provide engineering design solutions for the walVisualizar
star
MONUMENTO LA FIESTA DEL SOL
MONUMENTO LA FIESTA DEL SOL
A organização do CTA, optou pela solução MacWall® por ser uma construção a seco, esteticamente agradável, e não requer mão de obra qualificaVisualizar
star
MPDFT – BRASÍLIA
MPDFT – BRASÍLIA
A Construtora LDN, visando se resguardar dos possíveis problemas apresentados, convidou a Maccaferri para desenvolver uma solução para drenagem dasVisualizar
star
MRV ITAPUÂ
MRV ITAPUÂ
A solução apresentada foi a construção de taludes e, aterro e muros de contenção em gabiões para estabilização do solo na região com a preseVisualizar
star
MURO CABRA CORRAL
MURO CABRA CORRAL
A solução proposta foi a construção de um muro de 1.50m, levando a construção de uma contenção de 9.50m. Para a realização da contenção, fVisualizar
star
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
The technical studies carried out indicated that the best solution to the problem presented, among others found on the market, would be two gabion retVisualizar
star
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
The constructor together with the external supervision and the SICT residence analysed different alternatives for the required retaining works, and thVisualizar
star
MURO DE CONTENCIÓN DE SUELO REFORZADO
MURO DE CONTENCIÓN DE SUELO REFORZADO
Por sua facilidade de execução e por atender aos requisitos do projeto, foi escolhido como solução, realizar uma contenção em solo reforçado deVisualizar
star
MURO DE CONTENCIÓN PARA CONTROL DE EROSIÓN
MURO DE CONTENCIÓN PARA CONTROL DE EROSIÓN
Para proteger la carretera y evitar hundimientos, el propietario diseñó una solución completa en donde recomendó el recubrimiento de los taludes cVisualizar
star
MURO DE CONTENCIÓN VILLA TOROGOZ
MURO DE CONTENCIÓN VILLA TOROGOZ
Fue realizada la construcción de una estructura de contención con gaviones caja para contención del talud y harmonización arquitectónica.Visualizar
star
MURO DE RETENCIÓN EN ALTOS DEL BOULEVARD
MURO DE RETENCIÓN EN ALTOS DEL BOULEVARD
Antes de iniciar con la construcción del muro, se debió realizar una sustitución de suelos por un piedraplen, pues la capacidad soportante del mismVisualizar
star
MURO DE RETENCIÓN EN LLANO VERDE
MURO DE RETENCIÓN EN LLANO VERDE
Los trabajos consisten en la limpieza y relleno de parte de la cárcava con obras de retención de tierra armada en taludes, nuevo sistema colector deVisualizar
star
MURO DE RETENCIÓN EN RÍO LAS CAÑAS
MURO DE RETENCIÓN EN RÍO LAS CAÑAS
Se decide colocar un muro de Gavión® Caja con una sección principal de 6 m de alto y 46 m de largo, en total. Además de una sección en escuadra dVisualizar
star
MURO DE SUELO REFORZADO EN LAS CATALINAS
La solución consistió en un muro de suelo reforzado de 19 m de altura; su cimentación se realizó sobre un piso duro y con adecuada capacidad portaVisualizar
star
MURO ITAQUERA
MURO ITAQUERA
A solução adotada para o caso foi a construção de uma estrutura de contenção em solo reforçado com paramento em blocos de concreto MacWall®, dVisualizar
star
MURO PUENTE TAPANAL
MURO PUENTE TAPANAL
Se propuso un muro en suelo mecánicamente estabilizado para poder ampliar el ancho de la carretera, el cliente decidio utilizar Terramesh® System paVisualizar
star
MURO QUEBRADORA PARA STOCKPILE
MURO QUEBRADORA PARA STOCKPILE
Las opciones de solución para la construcción del muro fueron varias, rígidas, flexibles y semi-rigidos; La elección final fue un sistema flexibleVisualizar
star
MURO TM VALLE DE ANGELES
MURO TM VALLE DE ANGELES
Fue evaluado que era necesaria la construcción de una estructura de contención en suelo reforzado mista en Terramesh® Verde de aproximadamente 2 meVisualizar
star
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of products in our portfolio that can achieve thVisualizar
star
NEW AIRPORT IN MOUNTAINOUS REGION
NEW AIRPORT IN MOUNTAINOUS REGION
The cut-and-fill operations would enable the insertion of the 2,800m runway and airport buildings. To stabilise and reinforce the ‘fill’ (valley) Visualizar
star
NEW ASDA STORE
NEW ASDA STORE
The chosen solution was the MacWall Diamond dry build a segmental block retaining wall system due to its rapid speed of construction, flexibility and Visualizar
star
NEW SHARJAH-KHORFAKKAN ROAD
NEW SHARJAH-KHORFAKKAN ROAD
From the previous successful experience of Terramesh system walls, the consultant approached Maccaferri Middle East to propose Terramesh MSE walls as Visualizar
star
NEWHURST ENERGY FROM WASTE FACILITY
NEWHURST ENERGY FROM WASTE FACILITY
Maccaferri proposed the use of its Macline GCL W20 to  impermeably line the attenuation pond and this was   accepted by client HitVisualizar
star
NORTH WALES COASTROAD (A55)
NORTH WALES COASTROAD (A55)
Where the alluvial clay was at its shallowest, after having  removed the refuse, a separator geotextile was placed to   provide a Visualizar
star
NUEVA PLANTA GRUPO VOLVO
NUEVA PLANTA GRUPO VOLVO
Para solucionar o problema, foi proposto a utilização de um geossintético que atuaria como elemento de reforço e separação entre a camada de solVisualizar
star
NUEVA SUBIDA DE LA SIERRA – BR-040
NUEVA SUBIDA DE LA SIERRA – BR-040
A solução foi a execução de um muro em solo reforçado em Terramesh® Grid (elementos Terramesh® associados à geogrelhas), aplicando tirantes emVisualizar
star
OBRAS DE CONTROL DE INUNDACIONES DEL RÍO JIBOA
OBRAS DE CONTROL DE INUNDACIONES DEL RÍO JIBOA
Se propusieron obras que incluyen bordas y espigones de protección con gaviones y colchonetas, buscando volver a recobrar el cauce naturVisualizar
star
Ocean Farm 1 – Supply of KikkoNet Net and Net Structure
Ocean Farm 1 – Supply of KikkoNet Net and Net Structure
As a supplier of the new net pen in this project, Maccaferri is in charge of supplying the KikkoNet containment net and its built-in structural reinfoVisualizar
star
OCEANS UMHLANGA MALL
OCEANS UMHLANGA MALL
After evaluating the geotechnical parameters, loading  constraints and required structure geometry, Maccaferri   provided a designVisualizar
star
OOSTERWEEL VERBINDING -LINKEROEVER, BFL03
OOSTERWEEL VERBINDING -LINKEROEVER, BFL03
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aVisualizar
star
OOSTERWEEL VERBINDING -LINKEROEVER, G17
OOSTERWEEL VERBINDING -LINKEROEVER, G17
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aVisualizar
star
OOSTERWEEL VERBINDING -LINKEROEVER, K13+G16
OOSTERWEEL VERBINDING -LINKEROEVER, K13+G16
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aVisualizar
star
ORLA DO PORTO
ORLA DO PORTO
Definiu-se como solução a execução de duas contenções em gabiões, a primeira próximo as margens do Rio Cuiabá, contemplando a utilização deVisualizar
star
PAE
PAE
Como sistema de revestimento, foi proposta a aplicação de MacMat® R, que consiste em uma manta composta por malha hexagonal de dupla torção unidaVisualizar
star
PAE LOCAÇÃO PETROLEIRA
PAE LOCAÇÃO PETROLEIRA
Optou-se por aumentar a altura do muro em gabiões existente com a finalidade de conformar o talude com uma inclinação mais suave. Como medida princVisualizar
star
PAN AMERICAN ENERGY
PAN AMERICAN ENERGY
Para solucionar ambos problemas, realizaram-se dois tipos de trabalho: Primeiro, a parte superior do talude a fim de impedir a formação de sulcos e Visualizar
star
PARAMESH WALL FOR BAJO – MALAWATAR ROAD SEGMENT
PARAMESH WALL FOR BAJO – MALAWATAR ROAD SEGMENT
The Retaining Wall Structure for Bajo – Malawatar Road Segment is constructed using Paramesh System with a height of 8.5m, consisting of a TerrameshVisualizar
star
PARQUE DAS ÁGUAS
PARQUE DAS ÁGUAS
A solução adotada foi a realização de um solo grampeado verde, com face flexível em geomanta reforçada MacMat R®, responsável pela proteção Visualizar
star
PASEO DE LAS FLORES
PASEO DE LAS FLORES
O muro foi projetado com Terramesh® System e MacWall®. A tarefa dos trabalhadores foi de colocar os blocos, preenchê-los com geotêxtil e brita no Visualizar
star
PASO DE DUCTO TRANSPETRO – LOT. CAMPO BELO
PASO DE DUCTO TRANSPETRO – LOT. CAMPO BELO
Para evitar carregamento adicional sobre os dutos devido a passagem dos veículos, foi proposto e aprovado a construção da base reforçada com geogrVisualizar
star
PASO URBANO DE SANTA MARIA
PASO URBANO DE SANTA MARIA
Optou-se pela aplicação da geomanta MacMat® 10.1 e sobre esta a projeção de hidrossemeadura. Com isso, foi possível controlar os processos erosiVisualizar
star
PASSAGEM INFERIOR DA RODOVIA BR-101 EM ESCADA
PASSAGEM INFERIOR DA RODOVIA BR-101 EM ESCADA
A containment and verticalization project for the meeting embankment was implemented using the reinforced soil system with the Terramesh System wall. Visualizar
star
PEACE BRIDGE
PEACE BRIDGE
A 40m long,8m high Green Terramesh® reinforced soil abutment wall to surround and support the high-level bridge bank seat and integrate seamlessly wiVisualizar
star
Perilago Path – Reconstruction of Route 82
Perilago Path – Reconstruction of Route 82
The most adequate solution for the needs of the work was the reinforced soil. The structure was designed with TerraMesh™ System, the built wall has Visualizar
star
PESQUERA CORDONE
PESQUERA CORDONE
Para a realização do canal de adução de água, que teria função de abastecer o tanque de criação de camarões, seria necessário o seu revestiVisualizar
star
PISTA DE ATLETISMO DO CE.N.A.R.D.
PISTA DE ATLETISMO DO CE.N.A.R.D.
A solução adotada baseou-se na execução de trincheiras drenantes constituídas por geocompostos MacDrain®, associadas à tVisualizar
star
PLANTA DE ASFALTO COTREL
PLANTA DE ASFALTO COTREL
Como a nova usina de asfalto seria locada ao lado da central de britagem da empresa, a solução de estrutura de contenção em Terramesh® System foiVisualizar
star
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES BELLO
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES BELLO
Para la construcción de la planta, fue diseñado un sistema de drenaje consistente en geocompuestos sintéticos para drenaje MacDrain® 2R y geotextiVisualizar
star
PODLJUBELJ ROCKFALL PROTECTION
PODLJUBELJ ROCKFALL PROTECTION
MACCAFERRI engineers inspected the site just after the rockfall event to assess and evaluate the scale of the problem and the boundary conditions. MAVisualizar
star
POLIPISO DO BRASIL LTDA
POLIPISO DO BRASIL LTDA
Após uma avaliação técnico-econômica das soluções idealizadas, concluiu-se que a utilização das fibras de aço Wirand® para o reforço de coVisualizar
star
POZO CAÑAGUATE 1
POZO CAÑAGUATE 1
Para se realizar a proteção do local, se fez necessária a contratação da empresa Bioforestal Colombia Ltda, especializada em projetos de refloresVisualizar
star
PRESA FRANCISCO ABELLÁN
PRESA FRANCISCO ABELLÁN
To protect users and maintenance personnel from possible landslides, a specific solution has been chosen for each situation.To ensure the stability ofVisualizar
star
PRESA SANTA ANA
PRESA SANTA ANA
O projeto realizado pela Comissão Técnica Mista de Salto Grande em conjunto com a Maccaferri, constituiu-se em um muro de contenção com a extensãVisualizar
star
PRESA SANTA HELENA
PRESA SANTA HELENA
Para solucionar o problema foi realizado um solo grampeado com face verde. O sistema utiliza, basicamente, chumbadores e uma geomanta reforçada, tendVisualizar
star
PRESA T2 JARDINS NÁPOLE E BOLOGNA
PRESA T2 JARDINS NÁPOLE E BOLOGNA
Pensando na rapidez executiva, segurança da obra e viabilidade técnica-econcômica, o projetista optou pelas soluções Maccaferri para reforço de Visualizar
star
PRESTONS ROAD FLYOVER
PRESTONS ROAD FLYOVER
The avoidance of surcharge on the tunnel and the potential  for differential movement were resolved by supporting the   approach rVisualizar
star
PROJETO  RAMAL FERROVIÁRIO CARAJAS
PROJETO  RAMAL FERROVIÁRIO CARAJAS
A solução proposta para a grande encosta foi a execução de retaludamento com a inserção de uma estrutura de solo reforçado em Terramesh® SysteVisualizar
star
PROTEÇÃO COSTEIRA COM GABIÕES
PROTEÇÃO COSTEIRA COM GABIÕES
To protect and control erosion, PoliMac™ box-type gabion containment was used, together with a PoliMac™ Reno® mattress, used at the pipe outlets,Visualizar
star
PROTECCIÓN CASA DE MAQUINAS RENACE III
PROTECCIÓN CASA DE MAQUINAS RENACE III
Se realizó un análisis del local y a partir de un estudio anterior realizado por la Cobra Infraestructuras Hidráulicas, se determinó que la soluciVisualizar
star
PROTECCIÓN CONTRA CAÍDA DE ROCAS EN ALHABIA
PROTECCIÓN CONTRA CAÍDA DE ROCAS EN ALHABIA
In order to guarantee road safety on the road, emergency work was carried out and awarded to the company Seanto. The work consisted of the following aVisualizar
star
PROTECCIÓN COSTERA CORINTO
PROTECCIÓN COSTERA CORINTO
La propuesta Maccaferri fue crear una estructura de protección longitudinal a la costa con MacTube® P13XL20, estas estructuras serían contínuas a Visualizar
star
PROTECCION DE BASES DE PUENTE XALTAYÁ
PROTECCION DE BASES DE PUENTE XALTAYÁ
Como sistema de protección de margen fue propuesta la aplicación de Gaviones tipo Caja y Colchones® Reno. Estos, recubiertos en PVC debido a que ibVisualizar
star
PROTECCIÓN DE COLECTOR PRINCIPAL PETOA
PROTECCIÓN DE COLECTOR PRINCIPAL PETOA
Se determinarón las características fluviales del río Cacaulapa y su influencia en el sector de la comunidad que adolece de protección natural porVisualizar
star
PROTECCIÓN DE MÁRGEN – PUENTE SOBRE RÍO MACACO
PROTECCIÓN DE MÁRGEN – PUENTE SOBRE RÍO MACACO
Foram adotadas como solução as proteções de margem em Gabiões, que além de oferecerem a proteção contra erosão hidráulica necessária, tem cVisualizar
star
PROTECCIÓN DE MARGEN  IGARAPÉ DE SÃO RAIMUNDO
PROTECCIÓN DE MARGEN  IGARAPÉ DE SÃO RAIMUNDO
A solução adotada para revestimento das margens foi o colchão Reno®, por sua agilidade executiva e custo final da obra.Visualizar
star
PROTECCIÓN DE MÁRGENES RÍO CALAMUCHITA
La protección contra la socavación de las márgenes se llevó a cabo con muros a gravedad de gaviones y muros Terramesh. En todos los casos, los murVisualizar
star
PROTECCIÓN DE TALUD PUENTE XALTAYA
PROTECCIÓN DE TALUD PUENTE XALTAYA
Fue necesario el revestimiento del talud con SteelGrid® HR 30, que fue anclado con pernos de 9m de profundidad. De esta forma, fue posible contener qVisualizar
star
PROTECCIÓN DE TUBERIA- ARROYO DE LAS ANTAS
PROTECCIÓN DE TUBERIA- ARROYO DE LAS ANTAS
Em tempo, a Saneago (órgão responsável pela área de saneamento do estado), interveio no local projetando um muro em gabião, que funcionou como prVisualizar
star
PROTECCIÓN DEL PUENTE SOBRE EL RÍO JARÚ
PROTECCIÓN DEL PUENTE SOBRE EL RÍO JARÚ
Para isso a solução adotada englobou a proteção e contenção dos encabeçamentos da ponte, com a construção de um muro de contenção à gravidVisualizar
star
PROTECCIÓN TALUD SANTA ELENA
PROTECCIÓN TALUD SANTA ELENA
Se ha brindado un revestimiento con malla con geomanta para controlar la erosión que el talud pueda presentar y a su vez ha sido utilizado anclajes tVisualizar
star
PROTECCIÓN TALUDES GIGANTE GARZÓN
PROTECCIÓN TALUDES GIGANTE GARZÓN
Para el tratamiento y protección de la vía y sus usuarios, se planteó un revestimiento simple el cual evaluando los desprendimientos ocasionados poVisualizar
star
PROTECTION OF PROMENADE DES ANGLAIS IN NICE
PROTECTION OF PROMENADE DES ANGLAIS IN NICE
The Nice-Côte-d’Azur municipality decided to install an anti-incursion barrier on the Promenade des Anglais to guarantee the safety of pedestrians.Visualizar
star
PROYECTO LAS MARGARITAS
PROYECTO LAS MARGARITAS
Para reduzir os efeitos ocasionados nesse projeto, foi feita uma proposta de contenção com geogrelha MacGrid® WG e geotêxtil MacTex®, para a criaVisualizar
star
PROYECTO PRICE SMART
PROYECTO PRICE SMART
Para a contenção do aterro, utilizou-se uma estrutura de solo reforçado em Terramesh® System de 280m de extensão e alturas variando de 10 à 12,5Visualizar
star
PROYECTO TAMBOMAYO
PROYECTO TAMBOMAYO
Se presentó la propuesta de Aditivo Acelerante Libre de Álcalis MacFree AF, un aditivo de última generación que no es nocivo para la salud del traVisualizar
star
PROYETO BLUE MALL
PROYETO BLUE MALL
Para este projeto, foi recomendado canalizar as águas da chuva presentes nas áreas circundantes à edificação. Foi aplicado o geocomposto drenanteVisualizar
star
PUENTES TRILLIZOS
PUENTES TRILLIZOS
A solução ao problema consistiu na utilização do MacMat® R, para proteger os taludes de alta inclinação e com solos suscetíveis a processos deVisualizar
star
PUERTO JENNEFER
Los técnicos de la empresa, optaron por una contención con gavión caja y protección con colchón Reno, debido a la facilidad constructiva y la posVisualizar
star
PUERTO SUDESTE
PUERTO SUDESTE
Primeiramente foi realizado um mapeamento geomecânico do maciço. Esse sistema possibilitou um estudo criterioso do maciço. Sendo assim, para estabiVisualizar
star
RAILWAY EMBANKMENT BURROWING PREVENTION
RAILWAY EMBANKMENT BURROWING PREVENTION
Maccaferri’s Anti-Burrowing Mesh has been proven to be a  strong rodent deterrent. Unlike any plastic grids or thin   rabbit netVisualizar
star
RECRECIMIENTO PRESA DE RELAVE
RECRECIMIENTO PRESA DE RELAVE
Minera el Roble contácto al consultor Geoservice Ingeniería SAC de Perú, donde Maccaferri apoyó en el diseño de este recrecimiento para la presa Visualizar
star
RECUPERACIÓN – MARGEN DEL ARROYO PROSA
RECUPERACIÓN – MARGEN DEL ARROYO PROSA
Com a ruptura do muro e formação da erosão no aterro, uma das pistas marginais ao córrego ficou comprometida, exigindo rápida intervenção. O coVisualizar
star
RECUPERACIÓN DE LA LAGUNA CATARINA
RECUPERACIÓN DE LA LAGUNA CATARINA
Foi realizada uma impermeabilização com a geomembrana MacLine®, onde foi possível controlar a perda de água nos tempos de estiagem e estabilizarVisualizar
star
RECUPERACIÓN DE TALUDES BARRIO SÍTIO BRANCO
RECUPERACIÓN DE TALUDES BARRIO SÍTIO BRANCO
O projetista apresentou uma solução de contenção e estabilização da encosta utilizando um muro de contenção à gravidade em gabiões caixa e uVisualizar
star
REDROW HOMES DEVELOPMENT
REDROW HOMES DEVELOPMENT
The excavated chalk was originally scheduled for landscaping and offsite disposal. However, contractor GDL, their designers GES and Maccaferri determiVisualizar
star
REFORÇO DE BASE DE PAVIMENTO – MARGINAL BOTAFOGO
REFORÇO DE BASE DE PAVIMENTO – MARGINAL BOTAFOGO
A Maccaferri apresentou uma solução com a utilização dos geossintéticos, que substituíssem o convencional e caro agulhamento com rachão. DepoisVisualizar
star
Rehabilitation due to Undermining in Villalobos
Rehabilitation due to Undermining in Villalobos
An environmentally sustainable engineering solution will be implemented. Technologies such as Terramesh System and Macgrid WG will be used to stabilizVisualizar
star
Reinforced Soil Retaining Structure and Slope Reinforcement
Reinforced Soil Retaining Structure and Slope Reinforcement
The client required a solution that met technical, architectural, and environmental requirements, incorporating a green face to transform the retaininVisualizar
star
REINFORCED SOIL WALL AT ABUTMENT OF BRIDGE- 43 IN REASI, J&K
REINFORCED SOIL WALL AT ABUTMENT OF BRIDGE- 43 IN REASI, J&K
Based on the site conditions and specific requirements of the client, Terramesh units made of gabion fascia along with an integrated tail as reinforceVisualizar
star
Reinforced Soil Walls and Slope Reinforcement in HUARAZ – ANCASH – Perú
Reinforced Soil Walls and Slope Reinforcement in HUARAZ – ANCASH – Perú
The major challenge was to propose a reinforced soil wall with a considerable height of 19 meters using the technical-economic competitiveness of the Visualizar
star
RELLENO SANITARIO DE RIO BRANCO
RELLENO SANITARIO DE RIO BRANCO
Diante da necessidade de expansão do aterro sanitário, realizaram a implantação de uma nova célula para o mesmo. Esta por sua vez, foi totalmenteVisualizar
star
RELLENO SANITARIO DE TIJUQUINHAS
RELLENO SANITARIO DE TIJUQUINHAS
A solução adotada foi um muro de gabião caixa de 3 metros de altura com 468 metros de extensão. Como o solo local é de baixa capacidade de suportVisualizar
star
RELLENO SANITÁRIO VILLA DOMINICO
RELLENO SANITÁRIO VILLA DOMINICO
Em 2005 iniciou-se a construção do sistema de drenagem que abrangia uma área de 40 hectares, onde foram aplicados 30 drenos superficiais de 100m deVisualizar
star
RELLENO SOBRE EL RÍO CORRIENTES
RELLENO SOBRE EL RÍO CORRIENTES
Para a contenção das margens utilizou-se o sistema de contenção em solo reforçado Terramesh® System que é composto por reforços em malha hexagVisualizar
star
RENACE II
RENACE II
Se implementaron 4 barreras, 3 de 50 metros lineales de longitud por 5 metros de altura y una de 40 metros lineales de longitud por 5 metros de alturaVisualizar
star
RENACE III
RENACE III
Por medio de consultoría externa del cliente, se le indico que debía de colocar una red para controlar la caída de los desprendimientos superficialVisualizar
star
REPAIR AND IMPROVEMENT OF OUELLETTE DRAIN WEST OUTLET
REPAIR AND IMPROVEMENT OF OUELLETTE DRAIN WEST OUTLET
RC Spencer Associates Inc., a reputable engineering firm in  the Windsor area, was tasked by the Town of Amherstburg   to devise aVisualizar
star
REPAVIMENTACIÓN TÚNEL CARUPÁ
REPAVIMENTACIÓN TÚNEL CARUPÁ
Foi recomendado a solução em geogrelha MacGrid® WG 50×50, combinada com a utilização do geotêxtil Nãotecido MacTex®. Essa solução é utilizaVisualizar
star
RESERVA NATURAL – NOROESTE/DF
RESERVA NATURAL – NOROESTE/DF
Devido à exigência ambiental, a Maccaferri foi acionada para apresentar soluções que pudessem atender as características particulares dessa obra.Visualizar
star
RESIDENCIA H11, ECO RESIDENCIAL VILLA REAL
RESIDENCIA H11, ECO RESIDENCIAL VILLA REAL
Fue escogido el sistema MacSoil® como solución idónea para cumplir con los objetivos del cliente. El muro tiene una altura pequeña que se adapta cVisualizar
star
RESIDENCIAL BUCARESTE
RESIDENCIAL BUCARESTE
A solução constituiu na execução de trincheiras drenantes com o MacDrain® TD para o rebaixamento do lençol freático, e a execução do MacDrainVisualizar
star
RESTAURACIÓN – AUTÓDROMO INTERNACIONAL DE GOIÂNI
RESTAURACIÓN – AUTÓDROMO INTERNACIONAL DE GOIÂNI
Pensando nisso, a AGETOP , órgão do estado responsável pela administração do autódromo, resolveu utilizar as geogrelhas para reforço de asfaltoVisualizar
star
RESTORATION OF THE ROAD LINK RR 128 AIN OCTOR – KORBOUS
RESTORATION OF THE ROAD LINK RR 128 AIN OCTOR – KORBOUS
The acrobatic works company, Hydrokarst, based in France, solicited Maccaferri to propose solutions for protection against rockfalls. Several types ofVisualizar
star
RETAINING WALL SUPPORTING A630
RETAINING WALL SUPPORTING A630
A PVC-coated welded mesh mass gravity gabion wall was  originally proposed within the design. However, the PVC   coating on weldedVisualizar
star
RETENTION WORKS FOR YADAGIRI GUTTA TEMPLE AREA
RETENTION WORKS FOR YADAGIRI GUTTA TEMPLE AREA
The site of the presidential suite building area is on hilly terrain and the foundation strata is completely rock. The height of the retention is varyVisualizar
star
REVESTIMIENTO DE TALUD EN ALTOS DEL BOULEVARD
REVESTIMIENTO DE TALUD EN ALTOS DEL BOULEVARD
Se decide colocar dos muros de Gavión Caja con una sección principal de 7 m de alto y 136 m de largo, en total. Además de una sección en escuadra Visualizar
star
REVESTIMIENTO DE TALUD ROCOSO
REVESTIMIENTO DE TALUD ROCOSO
Para garantir a proteção de vidas, dos equipamentos, bem como a vida útil dos galpões contra a queda destes blocos de rocha, algo precisa ser feitVisualizar
star
REVESTIMIENTO DE TALUD-HOLCIM
REVESTIMIENTO DE TALUD-HOLCIM
Las mallas de doble torsión se utilizaron para controlar los desprendimientos superficiales en los taludes, y se fijan mediante anclajes de 1m Visualizar
star
RFUERZO DE PRESA – ARROYO AÇUDE
RFUERZO DE PRESA – ARROYO AÇUDE
O material adotado como solução pelo projetista foi o tecido técnico MacGrid® Net, onde através de sua alta tenacidade, agregou elevada resistênVisualizar
star
RINGFIETSPAD ANTWERP
RINGFIETSPAD ANTWERP
Mainly, four different types of facing inclinations have been used for this project: 27°, 34°, 45° and 60° The main product used is Terramesh GreeVisualizar
star
RIO ARICANDUVA
RIO ARICANDUVA
Decidiu-se canalizar este tão importante curso d’água de São Paulo. Para a obra em questão, fazia-se necessária uma solução que apresentasse Visualizar
star
RÍO AZUL
RÍO AZUL
Foi realizada uma construção para proteção de margem conformada por gabião e colchão Reno®, onde se formou espigões de 72 m de comprimento parVisualizar
star
RÍO BERMEJO
RÍO BERMEJO
A Prefeitura de Tarija juntamente com o Governo da Bolívia, escolheu usar os gabiões, colchões Reno® e os geotêxteis nãotecido MacTex® nas obraVisualizar
star
RIO CHIJRA
RIO CHIJRA
Foi realizada obras nas margens do rio, com o objetivo de proteção para permitir o desenvolvimento social na região. O projeto consistiu na proteçVisualizar
star
RIO CHIMORE
RIO CHIMORE
O governo da Bolívia, com apoio do governo dos Estados Unidos, solicitou imediatamente a proteção contra a água acima da ponte, onde a Maccaferri Visualizar
star
RÍO JIBOA
RÍO JIBOA
Se propusieron obras que incluyen bordas y espigones de protección con gaviones y colchones Reno®, buscando volver recobrar el cauce natural del rioVisualizar
star
RÍO LEMPA
RÍO LEMPA
Se planteó entonces la reconstrucción de los diques a lo largo de las dos márgenes del río su protección con muros de gaviones y revestimientos dVisualizar
star
RÍO LOS ANTIGUOS
RÍO LOS ANTIGUOS
O projeto de controle de inundações e proteção de margens foi elaborado por técnicos do Laboratório de Hidráulica do Instituto Nacional de ÁguVisualizar
star
RÍO LULES
RÍO LULES
La necesidad de incrementar las tierras cultivables demandó la construcción de un sistema de riego que, a su vez, contempló una obra de toma en unaVisualizar
star
RÍO PAZ
RÍO PAZ
Se planteó entonces la reconstrucción de una borda de 400 m de largo, en la margen izquierda del río, para luego revestirla por medio de colchones Visualizar
star
RÍO PESCADO
RÍO PESCADO
Sucesivas etapas de proyectos de control de erosión se concluyeron con el desarrollo de un proyecto integral diseñado y construido por la empresa INVisualizar
star
RIO TIETÊ
RIO TIETÊ
Foi iniciado em 1995 a maior obra de Saneamento da América Latina: o Projeto Tietê, onde foi realizado a coleta e tratamento de esgoto, rebaixamentoVisualizar
star
Road stabilization in Totonicanapá
Road stabilization in Totonicanapá
El uso de geomallas monorientadas MacGrid WG integradas en el sistema Terramesh ofrece una solución técnica superior para el proyecto de contenciónVisualizar
star
ROB FOR CONNECTIVITY BETWEEN MUNDRA AND NH 8A
ROB FOR CONNECTIVITY BETWEEN MUNDRA AND NH 8A
The stone column technique, also known as vibro-replacement or vibro-displacement, is a ground improvement process where vertical columns of compactedVisualizar
star
ROCK SUPPORT IN VÍCAR, ALMERÍA
ROCK SUPPORT IN VÍCAR, ALMERÍA
To address this problem, the following support measures were implemented:LEA 300-8 cable net with a tensile strength of 130 kN/m and a puncture resistVisualizar
star
ROCKFALL MITIGATION WORKS- RAILWAY LINE-NEAR CH 14 – ANPARA
ROCKFALL MITIGATION WORKS- RAILWAY LINE-NEAR CH 14 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. RVisualizar
star
ROCKFALL PROTECTION AT SIMPANG PULAI, PERAK, MALAYSIA
ROCKFALL PROTECTION AT SIMPANG PULAI, PERAK, MALAYSIA
Based on the rockfall trajectory analysis, the design energy level required is 2000 kJ. Flexible barrier with post height of 4m in installed over 500mVisualizar
star
RUTA NACIONAL Nº 234
RUTA NACIONAL Nº 234
O traçado que executado havia sido projetado nos anos 60, cumprindo os requerimentos necessários para melhoramento, assim como diminuir ao máximo oVisualizar
star
RUTA NACIONAL Nº3 Y RÍO SAUCE CHICO
RUTA NACIONAL Nº3 Y RÍO SAUCE CHICO
Foi realizado um talude que foi protegido com colchões Reno® e gabiões caixa. A proteção se estende até encontrar-se com a proteção dos estribVisualizar
star
RUTA PROVINCIAL N°82
La obra incluyó la realización de 2.200 metros de nueva ruta, con 11 muros Terramesh System, y un túnel de 420 metros de longitud, en el cual se usVisualizar
star
RUTA PROVINCIAL Nº 33
RUTA PROVINCIAL Nº 33
Para recompor as seções afetadas do aterro viário, decidiu-se utilizar o sistema Terramesh® Verde. Os principais motivos que levaram a escolha porVisualizar
star
SAAE ITAPIRA
SAAE ITAPIRA
O armazenamento e o tratamento do efluente são feitos em lagoas de solo escavado, onde foi aplicado a geomembrana MacLine® e previsto um sistema de Visualizar
star
SADAWARNA DAM PARAMESH WALL
SADAWARNA DAM PARAMESH WALL
The Retaining Wall Structure for Stilling Basin in Sadawarna Dam is constructed using Paramesh System with a height of 5m, consisting of the TerrameshVisualizar
star
SADIA S.A.
SADIA S.A.
A Maccaferri do Brasil Ltda, que já tem um histórico de serviços prestados à Sadia S.A., buscando a melhor solução técnica e econômica para esVisualizar
star
SAFETY WORKS ON THE RD 900 IN THE ROCHAILL SECTOR
SAFETY WORKS ON THE RD 900 IN THE ROCHAILL SECTOR
As part of the MBC project in the Alpes de Haute Provence department, EPC France called on France Maccaferri to provide a wide range of solutions for Visualizar
star
SANEPAR
SANEPAR
Foi realizado um estudo de viabilidade técnica que atendesse a necessidade de impermeabilização de toda a lagoa, incluindo o eixo dos pilares. NestVisualizar
star
SANTA MÔNICA JARDINS
SANTA MÔNICA JARDINS
Após a realização de um estudo de viabilidade, decidiu-se pela substituição do sistema já instalado por um geocomposto drenante, que possibilitaVisualizar
star
SÃO SEBASTIÃO – LITORAL NORTE
SÃO SEBASTIÃO – LITORAL NORTE
Durante visita ao local constatou-se que o talude apresentava uma inclinação e estava muito próximo da edificação, descartando a possibilidade daVisualizar
star
SCHINCARIOL
SCHINCARIOL
Para possibilitar o aumento da capacidade da estação de tratamento do Grupo, foi projetada e construída uma nova lagoa de tratamento de efluentes. Visualizar
star
SEATION TRAMWAY
SEATION TRAMWAY
The site is situated above an area of soft soil that required  substantial ground improvement.The new platform area   adjacent to Visualizar
star
Second Stage MME at Puerto Escondido Airport
Second Stage MME at Puerto Escondido Airport
To strengthen the embankment, a longitudinal containment structure was designed and built, combining gabion walls and the Terramesh System along with Visualizar
star
SERRA DOS CARAJÁS
SERRA DOS CARAJÁS
Para o devido encaminhamento da água acumulada, e dissipação desta energia, foi adotada como solução a escada hidráulica em colchões Reno®, reVisualizar
star
SERVICIOS SAN ROQUE
SERVICIOS SAN ROQUE
O projeto contemplou a impermeabilização da lagoa de tratamento anaeróbio de 77m de comprimento por 37m de largura e profundidade de 3,5m, com uma Visualizar
star
SEVEN EMPREENDIMENTOS
SEVEN EMPREENDIMENTOS
A solução inicialmente analisada caracterizava-se pelo uso das macro fibras sintéticas, onde no projeto estimava-se uma dosagem de 5 quilos deste mVisualizar
star
SISTEMA DE DRENAJE BR-020
SISTEMA DE DRENAJE BR-020
A solução adotada foi a utilização de linhas de bueiros cujas saídas e proteções estavam dimensionadas utilizando concreto armado. Devido a necVisualizar
star
SLOPE PROTECTION MEASURES- RAILWAY LINE- NEAR CH 13 – ANPARA
SLOPE PROTECTION MEASURES- RAILWAY LINE- NEAR CH 13 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. VVisualizar
star
SLOPE STABILISATION PORT OF ZIERBENA
SLOPE STABILISATION PORT OF ZIERBENA
To secure the area, a highly rigid flexible containment system was designed and installed to limit ground deformation as much as possible, with a veryVisualizar
star
SLOPE STABILIZATION AND PROTECTION AT ULU SLIM RIVER, PERAK
SLOPE STABILIZATION AND PROTECTION AT ULU SLIM RIVER, PERAK
After careful considerations, Jabatan Kerja Raya (JKR) Batang Padang adopted Maccaferri Gabions Retaining Wall to solve this problem and increase safeVisualizar
star
Small green lung in the Metelliana Valley
Small green lung in the Metelliana Valley
Maccaferri’s solution to the environmental challenges posed by the abandoned landfill in Cava de’ Tirreni involved the application of advanced geoVisualizar
star
SMRITIVAN EARTHQUAKE MEMORIAL
SMRITIVAN EARTHQUAKE MEMORIAL
Maccaferri was involved in the supply, design and supervision of double twisted, mechanically woven gabions structures for the project. Gabions designVisualizar
star
SNCF LINE 930 000 FROM MARSEILLE TO VINTIMILLE
SNCF LINE 930 000 FROM MARSEILLE TO VINTIMILLE
The work involved installing 3 lines of protective screens on the rock faces located on the slope and in the access trench to the Cap Martin tunnel, fVisualizar
star
SOLERA SUMERGIDA EN ESTACAS PLANCHA- RENOMAC®
SOLERA SUMERGIDA EN ESTACAS PLANCHA- RENOMAC®
O barramento executado foi protegido com a solução Renomac®, especialmente desenvolvida para aplicações submersas, com malha hexagonal de dupla tVisualizar
star
SP 344 – KM 209 – RENOVIAS
SP 344 – KM 209 – RENOVIAS
A solução foi encontrada na utilização dos geocompostos MacDrain® TD atuando com “drenos de pavimento”, que quando inseridos entre as camadasVisualizar
star
SPOORLIJN 51A – ZWANKENDAMME
SPOORLIJN 51A – ZWANKENDAMME
The tender specifications were very strict asking PVA geogrids that were provided by the local partner Texion Geosynthetics NV, while Maccaferri supplVisualizar
star
St Andrews Royal & Ancient Golf Club
St Andrews Royal & Ancient Golf Club
The approved scheme was designed by HR Wallingford, to include both ‘hard’ and ‘soft’ engineering solutions and the contract was supervised byVisualizar
star
STRENGTHENING OF THE ROADBED LAYER OF THE RN4
STRENGTHENING OF THE ROADBED LAYER OF THE RN4
Initially, a granular drain mat was installed at the PST (Upper Part of Earthworks) level to capture flows and percolations from surrounding water basVisualizar
star
SUBDRENAJES RUTA 27
SUBDRENAJES RUTA 27
Se optó por utilizar el geocompuesto drenante MacDrain® TD en sustitución de una trinchera convencional de gravilla. El sistema consistió en la exVisualizar
star
SUBESTACIÓN JOÃO CÂMARA III – 500/230 KV
SUBESTACIÓN JOÃO CÂMARA III – 500/230 KV
Por sua facilidade de execução e por atender aos requisitos do projeto, foi escolhido como solução a realização de uma contenção a gravidade eVisualizar
star
SUELO GRAPADO CLÍNICA SÃO GONÇALO
SUELO GRAPADO CLÍNICA SÃO GONÇALO
Após o corte do talude, fez-se necessária a aplicação de uma solução que fosse capaz de proteger a superfície da instauração de processos eroVisualizar
star
SUELO GRAPADO CON CARA VEGETADA
SUELO GRAPADO CON CARA VEGETADA
O solo grampeado consiste em uma solução de estabilização global por meio de inserção de grampos. Com o objetivo de estabilizar a camada superfiVisualizar
star
SUELO GRAPADO VERDE
SUELO GRAPADO VERDE
Ocorreu uma estabilização do talude através da técnica de solo grampeado com revestimento flexível, que consiste na inserção de chumbadores parVisualizar
star
SUMELA MONASTERY ROCKFALL PROTECTION PROJECT
SUMELA MONASTERY ROCKFALL PROTECTION PROJECT
Within the guidelines of a technical committee consisting of several professors from various, prestigious technical universities of the country, MaccaVisualizar
star
SUNSET CLIFF
SUNSET CLIFF
The solution adopted for the Sunset Cliff walls consists of two types of systems:Gravity walls using gabions for walls with heights less than 6 metersVisualizar
star
TALUD SOBRE EL RÍO BURÍO
Se realizó una protección longitudinal mediante muro gavión a gravedad y su respectiva plataforma anti-socavación mediante colchones Reno, ambos cVisualizar
star
TALUDES JACARANDA, COND PARQUE DEL SOL
Para comenzar con el diseño de la solución, se solicitó un estudio geofísico de las características del talud para determinar los tamaños de la Visualizar
star
TEBE
TEBE
A solução de drenagem adotada foi a utilização do geocomposto para drenagem MacDrain® TD, com 1,30m de altura, conforme especificado em projeto. Visualizar
star
TELAL EL SOKHNA’ PROJECT
TELAL EL SOKHNA’ PROJECT
Maccaferri’s Paramesh MSE Wall system (with Terramesh facia units & Paralink geogrids) was eventually implemented, being a cost and time-effectiVisualizar
star
TERRAMESH – RJ142
TERRAMESH – RJ142
Elaborada pela consultoria PCE, consiste em uma estrutura de solo reforçado Terramesh® System com painéis duplos de tela hexagonal de dupla torçãVisualizar
star
TERRAMESH RD PATRIMONIAL
TERRAMESH RD PATRIMONIAL
The slope, characterized by its steep incline, created a challenging situation that required the implementation of containment measures to ensure the Visualizar
star
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
Firstly we redesigned the solution using Terramesh units with dimensions 3x3x1x1m. To ensure stability, Terramesh System was reinforced with ParaVisualizar
star
TERRAMESH® VERDE CARRETERA MATARANI KM. 24
TERRAMESH® VERDE CARRETERA MATARANI KM. 24
En la presente carretera se aplican soluciones de ingeniería con muros de suelo reforzado, Terramesh® System y Terramesh® Verde, las cuales economiVisualizar
star
TERZO VALICO DEI GIOVI – GENOVA JUNCTION
TERZO VALICO DEI GIOVI – GENOVA JUNCTION
Maccaferri proposed an innovative approach involving Automated Tunnel Ribs HEB 300 complete with automated hinges and automated links (covering a lengVisualizar
star
The Ash Yard of the Thermal Power Plant
The Ash Yard of the Thermal Power Plant
Se procedió a la creación de celdas, protegidas con geosintéticos tanto en su base como en el cierre , contando con 3 niveles de protección impermVisualizar
star
THE EXTENSION OF SITARSKA STREET OVER THE RAILWAY TRACKS
THE EXTENSION OF SITARSKA STREET OVER THE RAILWAY TRACKS
The MacRes system with concrete facing was proposed as a technology for retaining wall because of the space limitations and fast installation. The MacVisualizar
star
THE GRAND BOHEMIAN HOTEL
THE GRAND BOHEMIAN HOTEL
Initially, the project specifications called for S8 Aluminum anchors to be driven to a depth of 16'. However, during the installation, numerous prVisualizar
star
THE NEW ROUTE DU LITTORAL
THE NEW ROUTE DU LITTORAL
The solution defined by the project management for the landward embankments was a geosynthetic stiffened embankment with a double-twist gabion facing.Visualizar
star
THREE CITIES TRAIL
THREE CITIES TRAIL
The civil engineers at Halff successfully designed and  implemented a tie-back reinforced gabion retaining wall to   act as the slVisualizar
star
TK 2018 – 006 – MRV
TK 2018 – 006 – MRV
The solution adopted for this construction case involves a rectangular channel with cross-sectional heights varying between 2 and 4 meters. Gabion BoxVisualizar
star
TRANSPORTADORA ATLAS
TRANSPORTADORA ATLAS
Com o objetivo de atender as necessidades do cliente, que exigia para a escolha da solução o tripé Segurança, Economia e Estética, foi adotado o Visualizar
star
TRANSZILLI APARECIDA DE GOIÂNIA
TRANSZILLI APARECIDA DE GOIÂNIA
Para garantir a funcionalidade do piso, foi utilizada a solução de concreto reforçado com fibras de aço Wirand®, com uma dosagem de 20 Kg/m³ de Visualizar
star
TRASVASE DAULE VINCES
TRASVASE DAULE VINCES
O projeto consiste na regularização e revestimento das margens do rio Daule com geomembranas, sistema de drenagem sub-superficial para rebaixamento Visualizar
star
TREN DE LAS SIERRAS
TREN DE LAS SIERRAS
A fim de estabilizar e controlar a queda das rochas, foi realizada a instalação de revestimento cortical (SteelGrid® BO, SteelGrid® MO), e revestiVisualizar
star
TRIBUNA DEL CLUB NACIONAL DE FUTBOL
TRIBUNA DEL CLUB NACIONAL DE FUTBOL
Decidiu-se através de uma proposta eficaz da Maccaferri, a opção de uma estrutura de contenção com gabiões caixa, preenchidos com solo e entulhoVisualizar
star
UNIDAD ESCOLAR SETE LAGOAS
UNIDAD ESCOLAR SETE LAGOAS
A fim de vencer este desnível sem invadir os limites e edificações previstos no projeto, foi proposto um muro em solo reforçado Terramesh® SystemVisualizar
star
USINA UBERABA
USINA UBERABA
Como solução, foi proposto e executado uma estrutura em Gabiões Caixa para contenção do aterro nas alas da ponte e proteção da margem. PrevendoVisualizar
star
VALE EDECONSIL – KM 514
VALE EDECONSIL – KM 514
A estrutura de contenção idealizada, deveria proteger o corpo do aterro da sazonalidade temporal de um curso d'água existente. Foi projetado umVisualizar
star
VÍA BOGOTÁ-VILLAVICENCIO
VÍA BOGOTÁ-VILLAVICENCIO
Foram realizadas as remoções de materiais mais soltos e obras de controle de águas de escoamento superficial. Adicionalmente, utilizou-se a malha eVisualizar
star
VIA CALDERÓN – GUAYLLABAMBA
VIA CALDERÓN – GUAYLLABAMBA
Como o layout da estrada exigiu grandes cortes por sua realização, em um solo cuja granulometria heterogênea e baixa coesão foram acompanhadas de Visualizar
star
VIA DE ACCESO PUG MEDELLÍN
VIA DE ACCESO PUG MEDELLÍN
Para solucionar la necesidad de la obra y por temas de rapidez, facilidad constructiva, considerable ahorro económico con respecto a otras solucionesVisualizar
star
VIADUCTO AUTOPORTANTE EN MACWALL
VIADUCTO AUTOPORTANTE EN MACWALL
A solução adotada foi uma contenção em solo reforçado com bloco modular de concreto MacWall® e geogrelha MacGrid® WG, com seção crítica de 8Visualizar
star
VIADUTO AV. DAS TORRES
VIADUTO AV. DAS TORRES
Definiu-se a criação de um viaduto para melhorar o fluxo de carros, atingindo diretamente e indiretamente quase 100mil pessoas com essa intervençãVisualizar
star
Village Brow, Crawfordsburn
Village Brow, Crawfordsburn
Maccaferri Green Terramesh Reinforced Soil Slope was proposed and accepted as an appropriate solution. The total length of the slope was 70m, reachingVisualizar
star
VOID SPANNING IN HOUSING DEVELOPMENT
VOID SPANNING IN HOUSING DEVELOPMENT
The Developer’s Engineer approached Maccaferri to providedesign and supply of a high-strength geogrid solution. The proposed site topography was comVisualizar
star
WALTHAM HIGH SCHOOL
WALTHAM HIGH SCHOOL
Based on the rock wall’s height, geotechnical characteristics and the proximity of it to the school, a pinned drapery solution was the recommended mVisualizar
star
YAMANA DESENVOLVIMENTO MINERAL S/A
YAMANA DESENVOLVIMENTO MINERAL S/A
A empresa Consulgeo Consultoria e Projetos Geotécnicos, realizou um projeto de contenção em solo reforçado Terramesh® System, reforçado com geogVisualizar
star
YELLOWSTONE HWY 20
YELLOWSTONE HWY 20
The barrier was impacted on May 27, 2019, the opening day of summer travel to Yellowstone National Park. Wyoming DOT was notified of the large rockfaVisualizar
star

¿No encontraste lo que estabas buscando?

Filtrar por:
Búsqueda Avanzada












Conoce a nuestros expertos

Representamos un socio ganador para el complejo mundo de las construcciones civiles e industriales. Gracias a una amplia gama, nuestros productos son la respuesta a las diversas demandas técnicas del sector: desde drenaje y protección hasta el agua y la impermeabilización de estructuras y revestimientos, pasando por el ahorro energético y la comodidad en la vivienda, desde el control de vapor hasta los problemas relacionados.