Terramesh® system and ParaLink® as embankment at Seti river, Nepal

copy-of-wordpress-post-770x578px-43-ratio-17

Seti River flows in a narrow gorge in Pokhara Metropolitan City. An existing old bridge needed to be replaced to continue the connection between Phulbari and Nadipur. Maccaferri’s flexible solutions were implemented as the available Right of Way is almost vertical slope to reach the maximum height of 11.5 meters

Maccaferri India wins Great Place to Work® certification third year in a row

copy-of-wordpress-post-770x578px-43-ratio-16

Every year, more than 10,000 organizations from over 60 countries partner with the Great Place to Work® Institute for assessment, benchmarking and action planning to strengthen their workplace culture. Great Place to Work® Institute’s methodology is recognized as rigorous and objective and having achieved this recognition for three years in a row has placed the Maccaferri brand at the top, on corporate India’s map.

Avalanche Protection Measures at Atal Tunnel, Rohtang, India

copy-of-wordpress-post-770x578px-43-ratio-12

ErdoX Snow units installation in multiples lines in the avalanche formation zone at the approach road to the Main South Portal Atal Tunnel, Rohtang is the world’s longest highway tunnel situated at a high altitude of over 3,000m above mean sea level and built on an extremely challenging Himalayan terrain. The tunnel is prone to… Read more »