BESPOKE HOUSING DEVELOPMENT
Challenge
A small collection of residential homes was being developed along with the renovation of Jagger Green Hall in a rural setting in West Yorkshire. Level changes on the site of up to 4m, necessitated a retaining structure to create level plots for the houses, improving the efficiency of the land.
Solution
Maccaferri provided design and gabion supply services to the developer. A 3.5m high retaining wall of welded mesh gabions over a 70m length was required to fulfil the client's requirements. A garden feature wall, designed by others, was then to be installed immediately adjacent to the structure. The wall featured 4mm dia welded mesh gabions to meet the landscaping requirements. The welded units were heavily galvanised with zinc-aluminium alloy to provide a design life of up to 60 years. A high-quality installation was required with hand pitching of the front face of the gabions to echo the local dry-stone walling in the area. Maccaferri’s welded gabions are particularly well suited to architectural and landscaping applications. The square pattern 75 x 75mm mesh provides straight lines and corners to give a uniform finish.
Our products for
this Success Story
Get in touch with us
[contactForm_txtSuccessSubmit]