Challenge
At km 24, access ramps were required for the bypass road to the town of Mejía, which would pass through agricultural land with an elevation of more than 12 m. in height. Due to the length and height of the ramp, the use of reinforced concrete was ruled out due to the high cost, and also because it was in the middle of agricultural areas, the use of embankments was not considered, with Terramesh® Verde being the best alternative.
Solution
This road uses engineering solutions with reinforced soil walls, Terramesh® System and Terramesh® Verde, which economised the project by saving on bridges and embankments, reducing the margins of expropriation of agricultural land, allowing for walls more than 10 m high. Furthermore, the solutions have a low environmental impact as they are in contrast with the ecosystem of the area. In this section of the road, the use of soil slopes reinforced with Terramesh® Verde was applied for the execution of the access ramps on the road.
Used Products

Terramesh
Maccaferri Terramesh® Ailesi, Mekanik Olarak Stabilize Edilmiş Toprak Duvarlar (MSE) yapıları ve Güçlendirilmiş Zemin Yapıları (RSS) oluşturmak için fGörüntüleTek Eksenli GeoGridler
Paragrid™ WÇok yüksek modül ve en düşük indirgeme faktörleri ile karakterize edilen geliştirilmiş yüksek performanslı örme geogrid . SegmentaGörüntüle
Örgüsüz Geotekstiller
Ayırma, Filtreleme ve Koruma için Çok Yönlü ÇözümlerÖrgüsüz geotekstiller, sentetik elyaflardan yapılan, gelişmiş iğne delme veya termal bağlGörüntüleDrenaj Geokompozitleri
Bu özel ürün aileleri, drenaj kompozitlerinin çok yönlülüğünü ve uyarlanabilirliğini vurgulayarak çeşitli projelerin özel taleplerini karşılamalarını Görüntüle