Second Stage MME at Puerto Escondido Airport

Yıl
2022
Konum
PUERTO ESCONDIDO - OAXACA - México
Müşteri
SICT OAXACA
Tasarımcı
HUAROCSO SA DE CV

Zorluk

The erosive action of the stream flowing parallel to kilometer 137 on the federal highway Pinotepa Nacional - Salina Cruz has caused the undermining of the embankment, risking its stability. Additionally, the urban expansion brings a larger surface covered with asphalt and concrete, which have a lower infiltration coefficient, resulting in increased hydraulic expenditure, especially during hydro-meteorological events that affect this coastal city.

Çözüm

To strengthen the embankment, a longitudinal containment structure was designed and built, combining gabion walls and the Terramesh System along with Paragrid 200 HF geogrids. Additionally, transverse deflector-type structures and two gabion weirs were included to control the slope of the channel. Also, an increased embedment depth was implemented for this wall, located in a high seismicity zone.

İndirin: Başarı Hikayesi

Second Stage MME at Puerto Escondido Airport

İndir
Second Stage MME at Puerto Escondido Airport

Bu başarı hikayesiyle ilgili
ürünlerimiz Başarı Hikayesi

Bizimle iletişime geçin

Şirketin Gizlilik Politikası'na katılıyor ve içeriğini anladıysanız, Veri Sorumlusu, şirket tarafından sunulan hizmetler/faaliyetler hakkında tanıtım amaçlı iletişim gönderilmesi amacıyla, şirketin gizlilik politikasında belirtilen şekilde verilerinizin işlenmesine onay verip vermediğinizi sormaktadır. *

Ayrıca, Veri Sorumlusu, kişisel verilerinizin Maccaferri İştiraklerine iletilmesine ve bunun sonucunda ortaya çıkabilecek AB dışına aktarıma, kendi amaçları doğrultusunda, tanıtım amaçlı iletişim gönderimi de dahil olmak üzere onay verip vermediğinizi sormaktadır *