CICEKLI HYDROELECTRICAL POWERPLANT
Zorluk
The Cicekli Hydroelectric Power Plant project is located in Artvin, Turkey, which is a very mountainous area with a lot of rain and snowfall over the year. In 2019, the project area was still under construction. The penstock pipe was constructed on an extremely steep slope with a lot of loose rock material and potential rockfall. At the heel of this slope a building construction was started, but had to be stopped due to severe rockfall occurrences. Due to these rockfall events, the contractor decided to first install rockfall protection measures, before continuing the building construction.
Çözüm
As a solution to the loose material right in the surrounding area of the penstock pipe, on the left and right side of the pipe Steelgrid HR100 was installed with the simple drapery method. By this, loose material - especially from the top of the slope - could not show any harm to the pipe itself. Next to that, two lines of 750 KJ Rockfall Barriers were implemented on the slope. In accordance to the site evaluation and rockfall analysis carried out by our technical team, the upper barrier was designed with a height of 3m and the lower barrier line was designed with a a height of 4m.
İlgili ürünlerimiz:
Başarı Hikayesi
Bizimle iletişime geçin
[contactForm_txtSuccessSubmit]