141(BALIKESİR), 142 (ÇANAKKALE), 145 (KÜTAHYA) ROAD PROJECT
141(BALIKESİR), 142 (ÇANAKKALE), 145 (KÜTAHYA) ROAD PROJECT
As a result of the geotechnical calculations the installation of wire mesh with a tensile strength of 50 kN/m was seen sufficient for holding the smalGörüntüle
star
44 YEAR OLD GABION STRUCTURE
44 YEAR OLD GABION STRUCTURE
As the cliff was above the normal high tide level, it was  considered sufficient to construct a stepped retaining wall   from massGörüntüle
star
50 YEAR OLD GABION STRUCTURE, RIVER HUMBER
50 YEAR OLD GABION STRUCTURE, RIVER HUMBER
A ‘half-tide’ gabion wall, 2m high on an 18m wide gabion  apron (0.5m thick). The volume of protection was   approximately 13,Görüntüle
star
A944 ON THE RIVER DON
A944 ON THE RIVER DON
With all the problem factors in mind, Maccaferri’s solution was a reinforced slope using our Green Terramesh® Systems which would support the A roaGörüntüle
star
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
AINLEY INDUSTRIAL ESTATE DEVELOPMENT
Maccaferri provided support to the project team and  proposed the MacWall Landmark segmental reinforced soil   wall system. MGörüntüle
star
ALAPLI LANDSLIDE TERRAMESH SYSTEM PROJECT
ALAPLI LANDSLIDE TERRAMESH SYSTEM PROJECT
Considering the problem and the wishes of the client, it has been concluded that among the Maccaferri solutions, the most suitable solution for this pGörüntüle
star
An abandoned dump turned into a small green lung in the heart of Metelliana Valley (Italy)
An abandoned dump turned into a small green lung in the heart of Metelliana Valley (Italy)
Maccaferri’s solution to the environmental challenges posed by the abandoned landfill in Cava de’ Tirreni involved the application of advanced geoGörüntüle
star
ARDAHAN DAM AND HYDROELECTRIC POWER PLANT
ARDAHAN DAM AND HYDROELECTRIC POWER PLANT
In accordance to the above mentioned rockfall problems, the roads were protected by double-twisted wire mesh in a simple drapery system. Previous to tGörüntüle
star
ARTESANO GALLERIA
ARTESANO GALLERIA
The retaining walls were designed using a gravity gabion retaining system. The architectural boundary walls were defined with a maximum thickness of 5Görüntüle
star
ARTVİN DAM TERRAMESH SYSTEM WALL APPLICATION
ARTVİN DAM TERRAMESH SYSTEM WALL APPLICATION
Geosynthetic reinforced Terramesh System retaining walls were preferred in the design of the embankments of the Demirkent village road in the area betGörüntüle
star
ATAŞEHİR MİMAR SİNAN MOSQUE
ATAŞEHİR MİMAR SİNAN MOSQUE
In the first meeting with the contractor, considering the problem and the requests of the employer, it was revealed that among the Maccaferri solutionGörüntüle
star
ATI PORT EXPANSION
ATI PORT EXPANSION
In order to address the challenge of improving the port expansion grounds at the Manila South Harbor, Asian Terminals Inc. (ATI) is implementing a cosGörüntüle
star
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
AVALANCHE MITIGATION FOR MSP 11 NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErGörüntüle
star
AVALANCHE MITIGATION FOR MSP 12 (L) NEAR ROHTANG TUNNEL
AVALANCHE MITIGATION FOR MSP 12 (L) NEAR ROHTANG TUNNEL
Based on the prevailing difficult site conditions and short construction window available, flexible snow barriers comprising of snow umbrella (Snow ErGörüntüle
star
AYDIN SAVCILLI SPP PROJECT EROSION CONTROL
AYDIN SAVCILLI SPP PROJECT EROSION CONTROL
At this point, it was considered to apply shotcrete with the conventional system. But Maccaferri Turkey was recommended as the most effective solutiGörüntüle
star
AZUDES SITIO RAMSAR RÍO DESAGUADERO
AZUDES SITIO RAMSAR RÍO DESAGUADERO
To date, two of the six planned weirs have been constructed. For the construction of the curtain, approach works and the dissipation basin, gabion boxGörüntüle
star
BAFOKENG CIVIC CENTRE MACWALL
BAFOKENG CIVIC CENTRE MACWALL
In keeping with their tradition of providing innovative, engineered solutions, Maccaferri Africa/African Gabions proposed the use of the MacWall CompaGörüntüle
star
BAHÍA DE PORTMAN
BAHÍA DE PORTMAN
El Ministerio de Agricultura, Alimentación y Medio Ambiente adjudicó las labores de regeneración a la UTE Ciomar Marco. La solución adoptada Görüntüle
star
BALESIN ISLAND CLUB RUNWAY
BALESIN ISLAND CLUB RUNWAY
Considering the challenges, Maccaferri engineers coordinated with the Project Consultant (TCGI Engineers) in coming up with an alternative solution. TGörüntüle
star
BARRAGEM CAMPEIRA – CRISTALÂNDIA
BARRAGEM CAMPEIRA – CRISTALÂNDIA
After complex hydrological studies, the dam was resized. The width of the spillway was increased to 125 metres and it was lined with PoliMac® gabionsGörüntüle
star
BELFAST HARBOUR
BELFAST HARBOUR
The works included dregging of the new berth and  approaches. This involved the disposal of 500,000m3 of   material to sea with trGörüntüle
star
BIFURCATION A10/171 ORLEANS
BIFURCATION A10/171 ORLEANS
The reinforced embankments made by Maccaferri formed the return walls of the C1 and C3 abutments of the PSI986 structure. This viaduct connects the A7Görüntüle
star
BİLECİK UNIVERSITY BOX GABION RETAINING WALL CONSTRUCTION
BİLECİK UNIVERSITY BOX GABION RETAINING WALL CONSTRUCTION
Field investigations were carried out by Maccaferri Turkey engineers to solve the problem. As a result of this investigation, it has been observed thaGörüntüle
star
BILECIK UNIVERSITY PARKING LOT WALL
BILECIK UNIVERSITY PARKING LOT WALL
After the discovery made by Maccaferri Turkey engineers at the construction site, it was concluded that instead of building a single-piece retaining Görüntüle
star
BONHILL, STIRLING ROAD
BONHILL, STIRLING ROAD
Maccaferri was approached by Barratt Homes to come up  with a suitable solution for the posed site problems. It was   agreed that Görüntüle
star
BORDERS RAIL
BORDERS RAIL
Maccaferri's gabions were used to support widened cuttings  extensively along the 35-mile route which connects   Edinburgh to Görüntüle
star
BOSCASTLE FLOOD DEFENCES
BOSCASTLE FLOOD DEFENCES
To achieve this solution, Halcrow specified a combination of Reno Mattresses and MacMat-R from Maccaferri. Over 7000 sq metres of Maccaferri wire meshGörüntüle
star
BROOMLANDS PRIMARY SCHOOL
BROOMLANDS PRIMARY SCHOOL
Once the overall design had been agreed, Maccaferri was engaged to design, supply and install 8 free standing gabion walls which totalled 78.8m in lenGörüntüle
star
CANTERA ZIORDIA
CANTERA ZIORDIA
To secure the area, two types of actions were carried out: 1. An active solution to prevent the larger blocks from being mobilised. This system consisGörüntüle
star
CHARLEROI HOSPITAL
CHARLEROI HOSPITAL
The construction company firstly laid the MacDrain W 1051rolls as indicated by Maccaferri´s technicians to create a drainage layer. After the installGörüntüle
star
CLOSE ROAD – RIO RUIDOSO CROSSING STRUCTURE
CLOSE ROAD – RIO RUIDOSO CROSSING STRUCTURE
The proposed channel is approximately 28 feet wide and 6  feet tall. The proposed channel sidewalls will be stabilized   with gabiGörüntüle
star
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
COASTAL PROTECTION WORKS USING GEOTEXTILE TUBES IN KOCHI (PETRONET)
Existing rubble mound breakwater was planned to be extended towards sea by about 500m using geotextile tubes (MacTube). The purpose was to reduce the Görüntüle
star
COBHAM SERVICES HGV PARKING AREA EXPANSION
COBHAM SERVICES HGV PARKING AREA EXPANSION
The proposal was to increase the HVG parking numbers by  79 new spaces, to the west of the petrol filling station. The   proposal Görüntüle
star
COLLEY LANE SOUTHERN ACCESS ROAD
COLLEY LANE SOUTHERN ACCESS ROAD
The ParaLink LTPs will transfer loads of the mechanically  stabilised earth walls into the pile foundations beneath. The maximum heightGörüntüle
star
ÇÖPLER GOLD MINE RETAINING WALLS
ÇÖPLER GOLD MINE RETAINING WALLS
The traditional concrete systems that are common in the mine fields are rigid structures. Due to continious high vibrations, cracks occur in the concrGörüntüle
star
ÇÖPLER GOLD MINE ROCK FALL PROJECT
ÇÖPLER GOLD MINE ROCK FALL PROJECT
In accordance with the urgency of the situation, the size of the potentially dangerous rocks on the slope and in line with the technical and economic Görüntüle
star
DANFOSS FACTORY
DANFOSS FACTORY
Maccaferri were approached by Quattro Consult Limited in  July 2021 to propose a suitable high strength geogrid for use   as a basGörüntüle
star
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
DEADMAN WASH, TSMC CHANNEL INFRASTRUCTURE
Maccaferri worked with Wood Patel Engineering to design a hydraulic solution for the microprocessor manufacturer TSMC. To reduce the soil erosion alonGörüntüle
star
DEBRIS FLOW APPLICATION
DEBRIS FLOW APPLICATION
As debris flow barriers made of steel with an advanced energy disapation braking system are new to Turkey, a test site was chosen by the authorities iGörüntüle
star
DIDIPIO MINE ACCESS ROAD
DIDIPIO MINE ACCESS ROAD
The solution proposed by Maccaferri, through its recommended contractor, Infratex Philippines Inc. (IPI), was approved by the customer. The slopeGörüntüle
star
DILMUNIA GRAND CANAL & MARINA (DGCM)
DILMUNIA GRAND CANAL & MARINA (DGCM)
The construction of the Dilmunia canal is the object of an international Tender. The tender design for the waterproofing works has been developed by tGörüntüle
star
Drainage of structures
Drainage of structures
The adopted solution was the construction of draining trenches using the MacDrain® TD geocomposite as lateral base drains. These drains are designed Görüntüle
star
ELAZIĞ INTEGRATED HEALTH CAMPUS PRECAST PANEL RETAINING WALL
ELAZIĞ INTEGRATED HEALTH CAMPUS PRECAST PANEL RETAINING WALL
Within the scope of the project, precast paneled polymer strip, geosynthetic reinforced wall designs were made around the entire hospital, which willGörüntüle
star
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
EROSION CONTROL MEASURES ALONG GANDAK RIVER BANK, BIHAR
Maccaferri has proposed the erosion control system consisting of rolled erosion control products (RECP)-MacMat R (Steel reinforced synthetic geomat) aGörüntüle
star
EROSION CONTROL MEASURES ON RAILWAY EMBANKMENT, RAJASTHAN
EROSION CONTROL MEASURES ON RAILWAY EMBANKMENT, RAJASTHAN
To prevent the soil erosion on the embankment slopes, Maccaferri offered different solutions based on the slope height to be protected against erosionGörüntüle
star
ESTA PARK HOUSES PROJECT
ESTA PARK HOUSES PROJECT
In the first meeting with the employer, considering the problem and the requests of the employer, it was revealed that among the Maccaferri solution iGörüntüle
star
EXTENSION OF THE CHANTERAINES PARK
EXTENSION OF THE CHANTERAINES PARK
The Conseil Général 92 chose double-twist gabion cages because they allow the filling materials to show through easily. The infill stone chosen comeGörüntüle
star
FLOOD EMERGENCY RESPONSE PROJECT
FLOOD EMERGENCY RESPONSE PROJECT
In May 2019, before the flood reached its peak, the city was able to create flood control barriers using FlexMac DT in multiple strategic locations toGörüntüle
star
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
FOYLE COLLEGE AND EBRINGTON PRIMARY SCHOOL AND NURSEY
Maccaferri proposed the use of the MacWall Vertica 4°  Segmental Block Retaining Wall System. The 4° batter of   this system creGörüntüle
star
Gabion Defense – Cajuca East Corridor
Gabion Defense – Cajuca East Corridor
The Provincial Municipality of Nazca was in charge of the technical file through its technical study department. The hydraulic approach they determineGörüntüle
star
GEBZE-ORHANGAZI-İZMIR MOTORWAY GABION RETAINING WALL PROJECT
GEBZE-ORHANGAZI-İZMIR MOTORWAY GABION RETAINING WALL PROJECT
As a result of the investigations made in the project area, it was determined that the correct solution for slope stabilization would be the Gabion Görüntüle
star
HAR MADENCİLİK COAL STORAGE AREA
HAR MADENCİLİK COAL STORAGE AREA
In the first meeting with the client, considering the problem and the requests, it was concluded that MacRes retaining wall with geosynthetic strip isGörüntüle
star
HAROLD COURT EAST REGIONAL SERVICE CENTER
HAROLD COURT EAST REGIONAL SERVICE CENTER
The project was initially designed as a series of 9 ft. tall gravity retaining walls along the steep slope with 10 ft. terraces in between. The challeGörüntüle
star
HELBOR BROOKLIN
HELBOR BROOKLIN
The solution for this project involved the demolition of the existing retaining wall and the installation of a vertical drainage system using the MacdGörüntüle
star
HELLOMAC – Ponza – Cala Fonte
HELLOMAC – Ponza – Cala Fonte
Maccaferri has always pursued innovation and has already taken part in this digital transformation developing a new alert system: HELLOMAC. Thanks to Görüntüle
star
HELMHOLTZ-ZENTRUM BERLIN ADLERSHOF
HELMHOLTZ-ZENTRUM BERLIN ADLERSHOF
The company Secon Systems GmbH, partner of Maccaferri for the German market, provided full assistance, proposing a solution with the so-called beaver-Görüntüle
star
HUHUGAM HERITAGE CENTER
HUHUGAM HERITAGE CENTER
The aesthetics of gabions were desirable, yet a traditional gabion retaining structure would be very expensive. Therefore Maccaferri suggested the useGörüntüle
star
IPO DAM SILT CURTAINS
IPO DAM SILT CURTAINS
To address the degradation of the Ipo Dam and mitigate the adverse effects of soil erosion and water contamination, various long-term solutions are beGörüntüle
star
IRMAK – KARABÜK – ZONGULDAK RAILWAY PROJECT
IRMAK – KARABÜK – ZONGULDAK RAILWAY PROJECT
In accordance to the above mentioned rockfall potential, several sections of the railway route were protected by double-twisted wire mesh in a simple Görüntüle
star
ISTANBUL – ŞILE – AĞVA ROAD PROJECT
ISTANBUL – ŞILE – AĞVA ROAD PROJECT
As a consequence of the above mentioned situation, it has been found necessary to protect the slope with a double-twisted wire mesh in a simple draperGörüntüle
star
İSTANBUL TORUNKENT 5. LEVENT PROJECT
İSTANBUL TORUNKENT 5. LEVENT PROJECT
Green Terramesh Retaining Wall Application with Geosynthetic Reinforcement After the meetings with the client and the engineering studies, it was deciGörüntüle
star
IVRINDI GOLD MINE SLOPE PROTECTION PROJECT
IVRINDI GOLD MINE SLOPE PROTECTION PROJECT
In accordance with the urgency of the situation and in line with the technical and economic conditions, Double-Twisted Wire Mesh has been installed onGörüntüle
star
İZMİR – İSTANBUL HIGHWAY PROJECT
İZMİR – İSTANBUL HIGHWAY PROJECT
Between Km: 52 + 780 and 58 + 600 (Including AB and GH Branches): Steel Grid HR100 (reinforced with steel ropes in a vertical direction 1 per 1 m) anGörüntüle
star
KARABUK – ESKIPAZAR ROAD PROJECT
KARABUK – ESKIPAZAR ROAD PROJECT
According to the calculations made to ensure the consolidation of on-site consolidation of the rock blocks on the small-medium scale with the potentiGörüntüle
star
KASTAMONU-CANKIRI ROAD (ILGAZ TUNNEL)
KASTAMONU-CANKIRI ROAD (ILGAZ TUNNEL)
As a result of the geotechnical calculations the installation of Wire Mesh with a tensile strength of 50 kN/m was seen sufficient for holding the smalGörüntüle
star
KAVŞAKBENDI HIGH DAM AND HYDROELECTRICAL CENTRAL
KAVŞAKBENDI HIGH DAM AND HYDROELECTRICAL CENTRAL
Due to the above mentioned situation, the high dam structures were protected with a passive drapery system. The drapery material was designed as a 6×8Görüntüle
star
KAYAPARK PROJECT BASAL REINFORCEMENT
KAYAPARK PROJECT BASAL REINFORCEMENT
To manage the differential settlement, Maccaferri offered Paralink™ as a basal reinforcement solution. Paralink™ geogrids are unique planar structGörüntüle
star
KEMALPAŞA LOGISTICS CENTER REINFORCED EARTH RETAINING STRUCTURE
KEMALPAŞA LOGISTICS CENTER REINFORCED EARTH RETAINING STRUCTURE
Due to the very high clay content of the natural ground in the project area, the settlement problems to be experienced on the ground were well toleratGörüntüle
star
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
KILDARE ROUTE: IRELANDS TRANSPORT 21 SCHEME
Byrne Looby and Partners were engaged by main contractor Siac Ltd, to value engineer the originally designed proposals as detailed on the project drawGörüntüle
star
KOZCAĞIZ  DAM RELOCATED ROAD PROJECT
KOZCAĞIZ  DAM RELOCATED ROAD PROJECT
For the Terramesh system of the Kozcagiz Dam project, planary reinforcement materials with a high tensile strength in one direction and composite geosGörüntüle
star
LANPING LEAD-ZINC MINING SANCHONGSHAN DUMP RETAINING WALL PROJECT
LANPING LEAD-ZINC MINING SANCHONGSHAN DUMP RETAINING WALL PROJECT
According to the geological conditions and engineering requirements of the project, the owner and the design unit comprehensively consider the economyGörüntüle
star
LINCOLNSHIRE EFW
LINCOLNSHIRE EFW
Consulting engineers, Arup, devised a two stage system of  ground level wet and dry holding lagoons. These were   impermeably lineGörüntüle
star
LISTENING MIRRORS HISTORIC SITE
LISTENING MIRRORS HISTORIC SITE
In the first phase of the project the peninsula housing the Mirrors was cut off to create an island linked to the mainland by a swing footbridge, and Görüntüle
star
LÖTZGALERIE
LÖTZGALERIE
The client chose the most economical system. The Maccaferri RB 3000 safety net with an energy of 3000 kJ and a height of 5 m. It was a great challengeGörüntüle
star
Lower Campbell Repair
Lower Campbell Repair
The erosion control solution consisted of a six to nine-foot-tall, stair-stepped, gabion wall, with a concrete floor base. MaxTex® H 60.1 iGörüntüle
star
LUOYANG FOUR RIVER TONGZHI PROJECT
LUOYANG FOUR RIVER TONGZHI PROJECT
Maccaferri Gabion + Renomesh solutions improve the overall defense capability of protecting the river bank. Overall consideration of the relationshipGörüntüle
star
M606 MOTORWAY / M62 JUNCTION
M606 MOTORWAY / M62 JUNCTION
Maccaferri’s double twist woven gabions have been used to  create an approximately 450m, the combined length of road[1]side retaining wallGörüntüle
star
MacSport AC Monza
MacSport AC Monza
Per il rifacimento del campo di allenamento, sono state coinvolte diverse aziende specializzate nel settore delle infrastrutture sportive, tra cui ItaGörüntüle
star
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
MALINAO-GENERAL LUNA ROAD SIARGAO ROCKFALL PROTECTION
Constructing a slope protection system along these road sections will promote the road's resiliency and is geared to improve the life and well-beiGörüntüle
star
MANILA-CAVITE EXPRESSWAY
MANILA-CAVITE EXPRESSWAY
Considering the size of the rock armors (minimum 0.5 meter in diameter), as well as the particle size of sand deposits and the drop height of rocks duGörüntüle
star
Marginal Protection for the Tonameca River
Marginal Protection for the Tonameca River
Emergency actions such as dredging and the establishment of temporary embankments were implemented. Subsequently, hydrological and topographic studiesGörüntüle
star
Mass Gravity Retaining Walls
Mass Gravity Retaining Walls
According to the premises outlined in the Environmental Recovery Plan (PRAD) provided by the client, the best solution among the available options in Görüntüle
star
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
MICOROSA ENVIRONMENTAL REMEDIATION PROJECT
The comprehensive solution involved Maccaferri's expertise and a strategic selection of materials to optimize the environmental remediation procesGörüntüle
star
MISSTANBUL RESIDENTIAL PROJECT
MISSTANBUL RESIDENTIAL PROJECT
In view of the difficulties and considering the ultimate performance of establishing a rigid retaining structure on the sloping backfill, designing a Görüntüle
star
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
MITIGATION OF LANDSLIDE ZONE AT NH-58, LAMBAGARH
Maccaferri worked in a JV to implement slope stabilization solutions for landslide zone between Km 504.00 to Km 505.00 on NH-58. It included shifting Görüntüle
star
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
MURO DE CONTENÇÃO E ESCADA HIDRÁULICA EM GABIÕES
The technical studies carried out indicated that the best solution to the problem presented, among others found on the market, would be two gabion retGörüntüle
star
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
MURO DE CONTENCION CARR. ACAYUCAN – LA VENTOSA
The constructor together with the external supervision and the SICT residence analysed different alternatives for the required retaining works, and thGörüntüle
star
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Museum of the Future – GREEN COVERAGE AND DRAINAGE SYSTEM
Maccaferri was chosen as the technology provider for the GREEN COVER SYSTEM; thanks to the wide range of products in our portfolio that can achieve thGörüntüle
star
Natural Hazard Mitigation in the Alps
Natural Hazard Mitigation in the Alps
In the present intervention, rockfall barriers RB 2000 with an interception height of 4.0 m were installed in order to protect the road infrastructureGörüntüle
star
NEW ASDA STORE
NEW ASDA STORE
The chosen solution was the MacWall Diamond dry build a segmental block retaining wall system due to its rapid speed of construction, flexibility and Görüntüle
star
NEWHURST ENERGY FROM WASTE FACILITY
NEWHURST ENERGY FROM WASTE FACILITY
Maccaferri proposed the use of its Macline GCL W20 to  impermeably line the attenuation pond and this was   accepted by client HitGörüntüle
star
NİLÜFER RIVER PANAYIR LOCATION STREAM RECLAMATION FLOOD PROTECTION
NİLÜFER RIVER PANAYIR LOCATION STREAM RECLAMATION FLOOD PROTECTION
It has been deemed appropriate to make a mattress gabion coating in the canal to provide an aesthetic and natural appearance and to increase the flow Görüntüle
star
NL BERGEN
NL BERGEN
The anti-erosion mat MacMat R020 is reinforced by a polyester geogrid with a tensile strength of 20 kN/m. The MacMat R020 was secured to the slope witGörüntüle
star
NORTH WALES COASTROAD (A55)
NORTH WALES COASTROAD (A55)
Where the alluvial clay was at its shallowest, after having  removed the refuse, a separator geotextile was placed to   provide a Görüntüle
star
NTPC SIDING-GADARWARA PROJECT– BLANKET THICKNESS REDUCTION
NTPC SIDING-GADARWARA PROJECT– BLANKET THICKNESS REDUCTION
Use of geosynthetics solution improves the performance of formation layer, which plays an important role for good performance of track. Also, it helpsGörüntüle
star
Ocean Farm 1 – Supply of KikkoNet Net and Net Structure
Ocean Farm 1 – Supply of KikkoNet Net and Net Structure
As a supplier of the new net pen in this project, Maccaferri is in charge of supplying the KikkoNet containment net and its built-in structural reinfoGörüntüle
star
OCEANS UMHLANGA MALL
OCEANS UMHLANGA MALL
After evaluating the geotechnical parameters, loading  constraints and required structure geometry, Maccaferri   provided a designGörüntüle
star
OOSTERWEEL VERBINDING -LINKEROEVER, K02B+G01
OOSTERWEEL VERBINDING -LINKEROEVER, K02B+G01
Maccaferri´s Corporate Technical Department has supported and is still supporting the main designers step by step from the first preliminary Global aGörüntüle
star
PANAYIR RIVER PROJECT
PANAYIR RIVER PROJECT
Mattress gabion was chosen as the ideal solution. It is durable and long-lasting. It is flexible and suitable for different settlements. The most Görüntüle
star
PARAMESH WALL FOR BAJO – MALAWATAR ROAD SEGMENT
PARAMESH WALL FOR BAJO – MALAWATAR ROAD SEGMENT
The Retaining Wall Structure for Bajo – Malawatar Road Segment is constructed using Paramesh System with a height of 8.5m, consisting of a TerrameshGörüntüle
star
PASSAGEM INFERIOR DA RODOVIA BR-101 EM ESCADA
PASSAGEM INFERIOR DA RODOVIA BR-101 EM ESCADA
A containment and verticalization project for the meeting embankment was implemented using the reinforced soil system with the Terramesh System wall. Görüntüle
star
PEACE BRIDGE
PEACE BRIDGE
A 40m long,8m high Green Terramesh® reinforced soil abutment wall to surround and support the high-level bridge bank seat and integrate seamlessly wiGörüntüle
star
Perilago Path – Reconstruction of Route 82
Perilago Path – Reconstruction of Route 82
The most adequate solution for the needs of the work was the reinforced soil. The structure was designed with TerraMesh™ System, the built wall has Görüntüle
star
PRESA FRANCISCO ABELLÁN
PRESA FRANCISCO ABELLÁN
To protect users and maintenance personnel from possible landslides, a specific solution has been chosen for each situation.To ensure the stability ofGörüntüle
star
PRESTONS ROAD FLYOVER
PRESTONS ROAD FLYOVER
The avoidance of surcharge on the tunnel and the potential  for differential movement were resolved by supporting the   approach rGörüntüle
star
PROTEÇÃO COSTEIRA COM GABIÕES
PROTEÇÃO COSTEIRA COM GABIÕES
To protect and control erosion, PoliMac™ box-type gabion containment was used, together with a PoliMac™ Reno® mattress, used at the pipe outlets,Görüntüle
star
PROTECCIÓN CONTRA CAÍDA DE ROCAS EN ALHABIA
PROTECCIÓN CONTRA CAÍDA DE ROCAS EN ALHABIA
In order to guarantee road safety on the road, emergency work was carried out and awarded to the company Seanto. The work consisted of the following aGörüntüle
star
RAILWAY EMBANKMENT BURROWING PREVENTION
RAILWAY EMBANKMENT BURROWING PREVENTION
Maccaferri’s Anti-Burrowing Mesh has been proven to be a  strong rodent deterrent. Unlike any plastic grids or thin   rabbit netGörüntüle
star
Rehabilitation due to Undermining in Villalobos
Rehabilitation due to Undermining in Villalobos
An environmentally sustainable engineering solution will be implemented. Technologies such as Terramesh System and Macgrid WG will be used to stabilizGörüntüle
star
Reinforced Soil Retaining Structure and Slope Reinforcement
Reinforced Soil Retaining Structure and Slope Reinforcement
The client required a solution that met technical, architectural, and environmental requirements, incorporating a green face to transform the retaininGörüntüle
star
Reinforced Soil Walls and Slope Reinforcement in HUARAZ – ANCASH – Perú
Reinforced Soil Walls and Slope Reinforcement in HUARAZ – ANCASH – Perú
The major challenge was to propose a reinforced soil wall with a considerable height of 19 meters using the technical-economic competitiveness of the Görüntüle
star
REPAIR AND IMPROVEMENT OF OUELLETTE DRAIN WEST OUTLET
REPAIR AND IMPROVEMENT OF OUELLETTE DRAIN WEST OUTLET
RC Spencer Associates Inc., a reputable engineering firm in  the Windsor area, was tasked by the Town of Amherstburg   to devise aGörüntüle
star
RESTORATION OF THE ROAD LINK RR 128 AIN OCTOR – KORBOUS
RESTORATION OF THE ROAD LINK RR 128 AIN OCTOR – KORBOUS
The acrobatic works company, Hydrokarst, based in France, solicited Maccaferri to propose solutions for protection against rockfalls. Several types ofGörüntüle
star
RETAINING WALL FOR THE JAW CRUSHER
RETAINING WALL FOR THE JAW CRUSHER
The fact that the reinforced concrete systems, which are known and common in the mine sites, are rigid systems, cause cracks and fractures in the concGörüntüle
star
RETAINING WALL SUPPORTING A630
RETAINING WALL SUPPORTING A630
A PVC-coated welded mesh mass gravity gabion wall was  originally proposed within the design. However, the PVC   coating on weldedGörüntüle
star
RINGFIETSPAD ANTWERP
RINGFIETSPAD ANTWERP
Mainly, four different types of facing inclinations have been used for this project: 27°, 34°, 45° and 60° The main product used is Terramesh GreeGörüntüle
star
Road stabilization in Totonicanapá
Road stabilization in Totonicanapá
The use of mono-oriented MacGrid WG geogrids integrated into the Terramesh system offers a superior technical solution for the containment project in Görüntüle
star
ROCKFALL MITIGATION  MEASURES AT SAPTSHRUNGI GAD, NASHIK
ROCKFALL MITIGATION MEASURES AT SAPTSHRUNGI GAD, NASHIK
The rockfall mitigation measures constituted of secured drapery system with Steelgrid MO and High Energy Absorption (HEA) panels and surface anchoringGörüntüle
star
ROCKFALL MITIGATION WORKS- RAILWAY LINE-NEAR CH 14 – ANPARA
ROCKFALL MITIGATION WORKS- RAILWAY LINE-NEAR CH 14 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. RGörüntüle
star
ROCKFALL PROTECTION AT SIMPANG PULAI, PERAK, MALAYSIA
ROCKFALL PROTECTION AT SIMPANG PULAI, PERAK, MALAYSIA
Based on the rockfall trajectory analysis, the design energy level required is 2000 kJ. Flexible barrier with post height of 4m in installed over 500mGörüntüle
star
ROMBLON DEO TABLAS CIRCUMFERENTIAL ROAD
ROMBLON DEO TABLAS CIRCUMFERENTIAL ROAD
The road is the main thoroughfare of the Tablas Island. In order to protect the road and ensure serviceability after a typhoon, Maccaferri proposed thGörüntüle
star
SADAWARNA DAM PARAMESH WALL
SADAWARNA DAM PARAMESH WALL
The Retaining Wall Structure for Stilling Basin in Sadawarna Dam is constructed using Paramesh System with a height of 5m, consisting of the TerrameshGörüntüle
star
SAFETY WORKS ON THE RD 900 IN THE ROCHAILL SECTOR
SAFETY WORKS ON THE RD 900 IN THE ROCHAILL SECTOR
As part of the MBC project in the Alpes de Haute Provence department, EPC France called on France Maccaferri to provide a wide range of solutions for Görüntüle
star
SAMSUN-KALIN HIGH SPEED RAILWAY PROJECT
SAMSUN-KALIN HIGH SPEED RAILWAY PROJECT
As a result of the geological investigations, simple drapery of the most critical slope areas with Double-Twisted Wire Mesh (Mesh Size: 8×10 and Wire Görüntüle
star
SAMSUN-KALIN YÜKSEK HIZLI TREN KAYA VE TAŞ DÜŞMESİ KORUMASI PROJES
SAMSUN-KALIN YÜKSEK HIZLI TREN KAYA VE TAŞ DÜŞMESİ KORUMASI PROJES
Jeolojik incelemeler neticesinde, çift bükümlü çelik tel ağ (gözenek boyutu 8×10 ve tel çapı 2,7 mm) olan kaya ve taş düşmesine karşı koGörüntüle
star
ŞANLIURFA – GÜNEY BATI ROAD PROJECT
ŞANLIURFA – GÜNEY BATI ROAD PROJECT
As a consequence of the above mentioned situation, it was found necessary to protect the slope with a double-twisted wire mesh in a simple drapery sysGörüntüle
star
SEATION TRAMWAY
SEATION TRAMWAY
The site is situated above an area of soft soil that required  substantial ground improvement.The new platform area   adjacent to Görüntüle
star
Second Stage MME at Puerto Escondido Airport
Second Stage MME at Puerto Escondido Airport
To strengthen the embankment, a longitudinal containment structure was designed and built, combining gabion walls and the Terramesh System along with Görüntüle
star
SLOPE PROTECTION MEASURES- RAILWAY LINE- NEAR CH 13 – ANPARA
SLOPE PROTECTION MEASURES- RAILWAY LINE- NEAR CH 13 – ANPARA
Based on engineering investigations, various site observations and previous history of rockfall events, the critical stretches have been identified. VGörüntüle
star
SLOPE STABILISATION PORT OF ZIERBENA
SLOPE STABILISATION PORT OF ZIERBENA
To secure the area, a highly rigid flexible containment system was designed and installed to limit ground deformation as much as possible, with a veryGörüntüle
star
SLOPE STABILIZATION AND PROTECTION AT ULU SLIM RIVER, PERAK
After careful considerations, Jabatan Kerja Raya (JKR) Batang Padang adopted Maccaferri Gabions Retaining Wall to solve this problem and increase safeGörüntüle
star
SMRITIVAN EARTHQUAKE MEMORIAL
SMRITIVAN EARTHQUAKE MEMORIAL
Maccaferri was involved in the supply, design and supervision of double twisted, mechanically woven gabions structures for the project. Gabions designGörüntüle
star
SNCF LINE 930 000 FROM MARSEILLE TO VINTIMILLE
SNCF LINE 930 000 FROM MARSEILLE TO VINTIMILLE
The work involved installing 3 lines of protective screens on the rock faces located on the slope and in the access trench to the Cap Martin tunnel, fGörüntüle
star
SOCAR TURKEY AEGEAN REFINERY (STAR) PROJECT
SOCAR TURKEY AEGEAN REFINERY (STAR) PROJECT
Tekno Maccaferri conceived a hybrid reinforced soil solution for these tall retaining structures combining their Terramesh® System and ParaLink® higGörüntüle
star
SUNSET CLIFF
SUNSET CLIFF
The solution adopted for the Sunset Cliff walls consists of two types of systems:Gravity walls using gabions for walls with heights less than 6 metersGörüntüle
star
TARLAC-NUEVA ECIJA PROVINCIAL ROAD
TARLAC-NUEVA ECIJA PROVINCIAL ROAD
In this, Maccaferri engineers designed an asphalt reinforcement system using MacGrid ARVG fiberglass geocomposite, which was primarily designed tGörüntüle
star
TERRAMESH RD PATRIMONIAL
TERRAMESH RD PATRIMONIAL
The slope, characterized by its steep incline, created a challenging situation that required the implementation of containment measures to ensure the Görüntüle
star
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
TERRAMESH RETAINING WALL KORCA-ERSEKA-LOT2 PHASE1
Firstly we redesigned the solution using Terramesh units with dimensions 3x3x1x1m. To ensure stability, Terramesh System was reinforced with ParaGörüntüle
star
TERRAMESH® VERDE CARRETERA MATARANI KM. 24
TERRAMESH® VERDE CARRETERA MATARANI KM. 24
This road uses engineering solutions with reinforced soil walls, Terramesh® System and Terramesh® Verde, which economised the project by saving on bGörüntüle
star
TERZO VALICO DEI GIOVI – GENOVA JUNCTION
TERZO VALICO DEI GIOVI – GENOVA JUNCTION
Maccaferri proposed an innovative approach involving Automated Tunnel Ribs HEB 300 complete with automated hinges and automated links (covering a lengGörüntüle
star
The Ash Yard of the Thermal Power Plant
The Ash Yard of the Thermal Power Plant
The creation of cells was carried out, protected with geosynthetics both at their base and in the closure, with three levels of impermeable protectionGörüntüle
star
THE GRAND BOHEMIAN HOTEL
THE GRAND BOHEMIAN HOTEL
Initially, the project specifications called for S8 Aluminum anchors to be driven to a depth of 16'. However, during the installation, numerous prGörüntüle
star
THE NEW ROUTE DU LITTORAL
THE NEW ROUTE DU LITTORAL
The solution defined by the project management for the landward embankments was a geosynthetic stiffened embankment with a double-twist gabion facing.Görüntüle
star
THREE CITIES TRAIL
THREE CITIES TRAIL
The civil engineers at Halff successfully designed and  implemented a tie-back reinforced gabion retaining wall to   act as the slGörüntüle
star
TK 2018 – 006 – MRV
TK 2018 – 006 – MRV
The solution adopted for this construction case involves a rectangular channel with cross-sectional heights varying between 2 and 4 meters. Gabion BoxGörüntüle
star
VOID SPANNING IN HOUSING DEVELOPMENT
VOID SPANNING IN HOUSING DEVELOPMENT
The Developer’s Engineer approached Maccaferri to providedesign and supply of a high-strength geogrid solution. The proposed site topography was comGörüntüle
star
WALTHAM HIGH SCHOOL
WALTHAM HIGH SCHOOL
Based on the rock wall’s height, geotechnical characteristics and the proximity of it to the school, a pinned drapery solution was the recommended mGörüntüle
star

<br>Arananı bulamadınız mı?

Filter by:
Gelişmiş Arama












Uzmanlarımızla Tanışın

Karmaşık inşaat sektöründe kazanan bir ortak temsil ediyoruz. Geniş ürün yelpazemiz sayesinde, ürünlerimiz sektörün çeşitli teknik taleplerine cevap vermektedir: drenaj ve korumadan yapıların ve kaplamaların su ve su geçirmezliğine, enerji tasarrufundan konut konforuna, buhar kontrolünden ilgili konulara kadar birçok alanda çözümler sunuyoruz.dos.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.