ROB FOR CONNECTIVITY BETWEEN MUNDRA AND NH 8A

Year
2020
Location
MUNDRA - GUJARAT - India
Client
M/s Mundra Port & Special Economic Zone Ltd
Designer
M/s. Multimedia Consultant Pvt. Ltd

Challenge

Mundra Special Economic Zone, located in Kutch District of Gujarat, is one of the largest SEZ in India. A ROB was proposed over the railway line that cuts across the connectivity road between Mundra and NH 8A. The approaches of ROB were proposed to be retained by ParaWeb® reinforced soil wall system. However, foundation soil comprising primarily of sandy silt with clay was found to have inadequate load bearing capacity to bear the load of retaining walls. Keeping in mind the high water table and high consolidation settlements, a ground improvement technique was required to improve the bearing capacity of soil, reduce post construction settlement and also facilitate the process of implementation. Thus, considering all these factors, stone column technique with a geosynthetic raft was adopted.

Solution

The stone column technique, also known as vibro-replacement or vibro-displacement, is a ground improvement process where vertical columns of compacted aggregate are formed through the soils to be improved. Primary purpose of soil improvement by stone column technique is to increase the bearing capacity of foundation soil and reduce post construction settlement. Stone column derives its support from lateral resistance provided by the surrounding soil, which is caused by: • bulging of the uncemented stone column under the load. • resistance due to surcharge effect. • bearing support offered by intervening soil. The geosynthetic raft is ParaLink®, which is a monoaxial array of geosynthetic strips having unidirectional strength ranging from 100 to 1350 KN/m. The purpose of providing ParaLink® as basal reinforcement is to ensure proper distribution of the load from the superstructure to the stone columns and reduce differential settlements. Ground Improvement details: The area is recommended to be excavated till the founding level where the stone columns are installed. Stone columns: • South side - entire zone including the reinforced and unreinforced section was improved by stone column technique. • North side - owing to relatively better quality of soil, stone columns were provided only under reinforced soil. ParaLink® was laid throughout the entire zone.

Download
the Success Story

ROB FOR CONNECTIVITY BETWEEN MUNDRA AND NH 8A

Download
ROB FOR CONNECTIVITY BETWEEN MUNDRA AND NH 8A

Our products for
this Success Story

Get in touch with us

If you agree with the company's Privacy Policy and understood its content, the Data Controller asks you if you consent to the processing in manner provided in the company's privacy policy for sending promotional communications of the services / activities provided by the Data Controller. *

Furthermore, the Data Controller asks you if you give your consent for the communication of your personal data to the Maccaferri Affiliates, and the consequent extra-EU transfer that may result, for their own purposes, including of a promotional nature (sending marketing communications) *