RINGFIETSPAD ANTWERP

Year
2019
Location
ANTWERP - ANTWERP - Belgium
Client
Texion Geosythetics N.V.
Designer
Tractebel Engineering N.V.

Challenge

This project has implied reinforced soil wall design, material supply and installation for a high-speed bike lane between the neighborhood of Deurne and Borgerhout in the city of Antwerp (Belgium). The main contractor was the Colas Group. Tractebel Engineering N.V. made the whole design with several different inclinations of the RSS to give a more natural and pleasant view. The walls were built along a very trafficked highway and they were aimed to act as a sound barrier for the houses in the suburban neighborhood as well. 

Solution

Mainly, four different types of facing inclinations have been used for this project: 27°, 34°, 45° and 60° The main product used is Terramesh Green Light that was produced specifically to meet the design requirements and slope inclinations. The project included also welded gabions walls and RSS built using EPS blocks to reduce the weight of the walls since the poor bearing capacity of the soil in situ. The construction took place between May 2019 and November 2019. In May 2020 the slopes were already completely vegetated.

Download
the Success Story

RINGFIETSPAD ANTWERP

Download
RINGFIETSPAD ANTWERP

Our products for
this Success Story

Get in touch with us

If you agree with the company's Privacy Policy and understood its content, the Data Controller asks you if you consent to the processing in manner provided in the company's privacy policy for sending promotional communications of the services / activities provided by the Data Controller. *

Furthermore, the Data Controller asks you if you give your consent for the communication of your personal data to the Maccaferri Affiliates, and the consequent extra-EU transfer that may result, for their own purposes, including of a promotional nature (sending marketing communications) *