REDBANK TUNNEL DEVIATION

Type of project
Slope Protection
Year
2022
Location
TAHMOOR - NSW - Australia
Client
Xstrata Coal

Challenge

Erosion was occurring on the 45 degree slope of up to 30 metres in height due to the friable and unstable shale face. As a result, rocks and sediments were clogging the cess drains at the base of this rail corridor cutting.

Solution

Macmat R was chosen not only for its effectiveness as a unique solution but also for the substantial cost saving realized by requiring only one single installation process over this vast area of 22,000 m2. 16mm diameter bolts were drilled and grouted at 1m centres (ie: 22,000) into the 45 degree slope. An innovative platform was designed and built by the Contractor, to carry out the installation. The platform design enabled it to be maneuvered up and down and across the face of the slope resulting in a crew of only two men to fully install up to 400 bolts per day. The most critical feature of the platform was that it allowed trains to operate through the site without any disruption to either train timetables or the installation crew.

Download
the Success Story

REDBANK TUNNEL DEVIATION

Download
REDBANK TUNNEL DEVIATION

Our products for
this Success Story

Get in touch with us

If you agree with the company's Privacy Policy and understood its content, the Data Controller asks you if you consent to the processing in manner provided in the company's privacy policy for sending promotional communications of the services / activities provided by the Data Controller. *

Furthermore, the Data Controller asks you if you give your consent for the communication of your personal data to the Maccaferri Affiliates, and the consequent extra-EU transfer that may result, for their own purposes, including of a promotional nature (sending marketing communications) *