NONG SLIK WEIR RETIFICATION PROJECT

Type of project
Weirs, Culverts and Transverse Structures
Year
2020
Location
 LAMPHOON PROVINCE -    - Thailand
Client
Tipakorn CO., Ltd.

Challenge

The objective of weirs is to reduce the attitude of the river to transport sediment material downstream, protecting at the same time river flanks. This attitude is achieved by reducing longitudinal river slope through backfilling.

Solution

Comparing all available solutions, Maccaferri Gabions and Reno Mattresses solution has the following advantages: • Permeability • Flexibility • Ease of installation • Ease of maintenance • Environmental footprint).friendliness (greening and low carbon The following products were used in order to construct the 3m height weir: Galmac Gabion 2x1x0.5 27,382 m3 Galmac Gabion 2x1x1 440 m3 Galmac Reno Mattress 2x1x0.3 2,173.20 m2 The productivity rate was equal to 0-50 m3 per man per day.

Download
the Success Story

NONG SLIK WEIR RETIFICATION PROJECT

Download
NONG SLIK WEIR RETIFICATION PROJECT

Our products for
this Success Story

Get in touch with us

If you agree with the company's Privacy Policy and understood its content, the Data Controller asks you if you consent to the processing in manner provided in the company's privacy policy for sending promotional communications of the services / activities provided by the Data Controller. *

Furthermore, the Data Controller asks you if you give your consent for the communication of your personal data to the Maccaferri Affiliates, and the consequent extra-EU transfer that may result, for their own purposes, including of a promotional nature (sending marketing communications) *