ÇÖPLER GOLD MINE ROCK FALL PROJECT

An
2018-2019
Locație
ERZİNCAN - DOĞU ANADOLU - Turkey
Client
ANAGOLD MADENCİLİK SAN. ve TİC. A.Ş.

Provocare

The Çöpler mine site is an open pit operation located 8 km away from Ilıc District of Erzincan City, approximately 550 km east of Ankara in Middle Anatolia with the capacity to process approximately 20,000 tonnes of oxide ore per day. During the extension of the waste storage area, rockfall from the rocky slopes next to the construction area forced the company to stop the construction temporarily in order to prevent damage on the membranes and to decrease the risk for the construction crew.

Soluția

In accordance with the urgency of the situation, the size of the potentially dangerous rocks on the slope and in line with the technical and economic conditions, Steel Grid HR100 has been installed on the steep slopes running along the waste storage area. The total area of approximately 30,000 m² has been installed in a time period of 4-6 weeks under the cooperation with our professional mountainer crew.

Descarcă Poveste de Succes

ÇÖPLER GOLD MINE ROCK FALL PROJECT

Descarcă
ÇÖPLER GOLD MINE ROCK FALL PROJECT

Produsele noastre pentru
această Poveste de Succes

Ia legătura cu noi

Dacă sunteți de acord cu Politica de Confidențialitate a companiei și ați înțeles conținutul acesteia, Operatorul de date vă întreabă dacă vă dați consimțământul pentru prelucrare în modul prevăzut de politica de confidențialitate a companiei, în vederea trimiterii de comunicări promoționale privind serviciile/activitățile oferite de Operatorul de date. *

În plus, Operatorul de date vă întreabă dacă vă dați consimțământul pentru comunicarea datelor dumneavoastră personale către Afiliații Maccaferri, precum și pentru eventualul transfer extra-UE care ar putea rezulta, în scopurile proprii ale acestora, inclusiv de natură promoțională (trimiterea de comunicări de marketing) *