Tunnelling GFRP Solutions
Fiberglass reinforcement for tunnel excavation
Fibreglass reinforced solutions (GFRP), a well-established method for consolidation and reinforcement of the excavation face in underground construction, enhance soil stability and improve safety conditions. Our portfolio features a wide range of innovative solutions:
Profiles and elements in fibreglass of different section
The customizable anchoring systems P.E.R. Ground
Glass fibre reinforcement nets
Glass fibre reinforcing bars
P.E.R. Ground System
The P.E.R. Ground System, designed for challenging excavations, combines a fiberglass-reinforced element with an expandable sheath, filled with pressurized mortar. This system improves pull-out resistance, efficiently controls mortar usage and reduces perforations by up to 45%, enhancing safety and saving resources. P.E.R. Ground is customizable in various combinations, allowing multiple functions to be performed simultaneously (e.g., P.E.R. Ground Drain for both reinforcement and drainage).
DIG DEEPER INTO OUR TUNNELLING SOLUTIONS
Corrugated Fibreglass Hollow Sections
The corrugated fibreglass hollow sections, made from a polyester resin matrix reinforced with continuous unidirectional E-Glass type GFRP fibres, maintain the integrity of the fibres throughout their length. This uninterrupted fibreglass reinforcement significantly enhances tensile strength and pull-out resistance. The corrugated design also increases adhesion, and when combined with the high tensile capacity of the tube, ensures reliable stabilization of the excavation face.
Success Stories
Built, not just drawn
Discover more
SMC TOLLWAY PRECAST CRASH BARRIERS
Precast concrete is essential in construction due to its efficiency, durability, and strength. However, traditional methods of using precast concrete come with several challenges. Transporting these precast elements from the pant to the site can be problematic, leading to inconsistencies, particularly when faced with rough road conditions and bad weather. These precast elements are also vulnerable to damage during the demolding process, which can compromise their quality before they are even installed. Moreover, the installation of traditional reinforcement bars requires significant labour and time, making the process labour-intensive and potentially delaying project timelines, while also increasing overall costs.
Discover more
TERZO VALICO DEI GIOVI - GENOVA JUNCTION
The Terzo Valico dei Giovi is an ambitious project aimed at enhancing the Italian railway network, particularly the Genoa Node - Campasso Route. This initiative is crucial in improving both national and international connectivity, facilitating the transportation of goods and passengers. However, the excavation phase has encountered substantial geological complexities, resulting in significant challenges. The instability of the mass and the distress of the primary lining have necessitated the installation of struts to ensure stability at the excavation front and prevent delays in project progression. A primary focus is on mitigating risks for workers and expediting the primary lining phase to ensure that operations continue without impediment. These challenges not only impact production but also raise concerns regarding the safety and timeliness of ongoing operations.
Discover more
Deep dive into
Tunnelling GFRP Solutions
What we can do with
Tunnelling GFRP Solutions
Applications
Get in touch with us
[contactForm_txtSuccessSubmit]