MacArmour & SteelGrid
High-strength rockfall protection mesh
MacArmour
MacArmour is a 2-in-1 product that combines a homogeneous structure of bi-directional steel wire ropes with double twist wire mesh. The result is a unique product that has an excellent out-of-plane stiffness (punch resistance) and an outstanding tensile strength in the longitudinal and transversal directions.
Steelgrid HR
The Steelgrid HR System is an innovative complete system for rockfall mitigation and slope consolidation works. It is used as a drapery or as a high stiffness (low extension) bolted facing when anticipated loads exceed the capability of traditional DT Mesh. Maccaferri Steelgrid HR System combines a patented high strength steel wire mesh geocomposite which is used in conjunction with anchor plates, specific U-bolts and mesh connectors.
Success Stories
Built, not just drawn
Discover more
AMPANG ROCK SLOPE BY MPAJ
A section of vertical slope at residential area was identified as high risk of rockfalls due to active development at the top of the slope. The slope situation is further worsened by factors i. e. rock weathering, presence of natural fractures or weak bedding planes and the rainy session. The slope which composed of weathered granite showed a sign of instability with frequent small rockfalls that hit the roof of houses below.
Discover more
BUKIT ANTARABANGSA ROCKFALL & SOIL SLOPE PROTECTION
A slope that includes both soil and rock was identified with risk of failure due to heavy monsoon season that saturated the soil slope and cause instability to the rock. Critical area such as the rock and soil interaction zone have greater risk due to uncertainty on the failure mode and zone. The slope which composed of weathered granite showed a sign of instability with frequent small rockfalls that hit the roof of houses below.
Discover more
KAJANG SILK HIGHWAY ROCK SLOPE PROTECTION
A vertically cut granite bedrock for highway construction has left the formation subjected to heavy weathering where it has significantly altered the formation integrity by weakening the granite and causing it more prone to breaking and crumbling. The rock slope failure has then happened at KM15. 4 southbound from Sungai Long to Semenyih and has caused the left lane of the two-lane dual carriageway highway to be blocked by the boulders and debris impacting almost 200,000 daily traffic users of the highway
Discover more
Deep dive into
MacArmour & SteelGrid
What we can do with
MacArmour & SteelGrid