KAJANG SILK HIGHWAY ROCK SLOPE PROTECTION

Year
2024
Location
KAJANG SILK - ASEAN - Malaysia
Client
PROJEK LINTASAN KOTA HOLDINGS SDN BHD (PROLINTAS)
Designer
MOSAR CONSULT SDN BHD

Challenge

A vertically cut granite bedrock for highway construction has left the formation subjected to heavy weathering where it has significantly altered the formation integrity by weakening the granite and causing it more prone to breaking and crumbling. The rock slope failure has then happened at KM15.4 southbound from Sungai Long to Semenyih and has caused the left lane of the two-lane dual carriageway highway to be blocked by the boulders and debris impacting almost 200,000 daily traffic users of the highway

Solution

Steel grid SGHR 30 was proposed to address the rock slope instability issue. An estimated 2500m2 of the net was installed to strengthen and prevent detachment of loose, weathered granitic rock of 10m height. This simple drapery system has anchor installed at top and bottom of the netting that trap the boulders from hitting the traffic lane.

Download
the Success Story

KAJANG SILK HIGHWAY ROCK SLOPE PROTECTION

Download
KAJANG SILK HIGHWAY ROCK SLOPE PROTECTION

Our products for
this Success Story

Get in touch with us

If you agree with the company's Privacy Policy and understood its content, the Data Controller asks you if you consent to the processing in manner provided in the company's privacy policy for sending promotional communications of the services / activities provided by the Data Controller. *

Furthermore, the Data Controller asks you if you give your consent for the communication of your personal data to the Maccaferri Affiliates, and the consequent extra-EU transfer that may result, for their own purposes, including of a promotional nature (sending marketing communications) *