Challenge

The Sardaneta Canal is a watercourse built during the Fifties to prevent flooding in the city of Leon. Recently the Government planned to transform the Sardaneta into a public space to promote recreation, social cohesion, protection and conservation of the channel as well as the local economy. The aim of the overall project was to transform the public areas and also to improve cycle and pedestrian access in the public space. With a length of 4.4 kilometers and an investment of more than 190 million pesos, The Lineal Park, including the Sardaneta canal, is also planned to connect the Zoo and The Metropolitan Park, including pedestrian walkways, bike paths, green areas, pedestrian bridges, graffiti areas, playgrounds and a tourist train, among other features. A key part of this project has been the protection and longitudinal revetment of the cannel; flooding is a very high risk for the entire area and protection measures were necessary to ensure the success of the Project and to maintain the storm water conveyance capacity in the region.

Solution

To solve the problem of erosion of the canal side slopes caused during storm events, a gabion mat and gabion protection revetment was proposed. Maccaferri’s gabion mats are a north and central American solution where wide and extensive river protection works have led to the creation of an innovative product; gabion mats are are ’gabions on a roll’ and available in lengths up to 30m. These units are unrolled in position and filled with hard- durable rock in the same way as a gabion or Reno Mattress. Their size enables rapid construction progress and helped to commplete the works in time for the opening. Beneath the gabion mats a non woven geotextile MACTEX® N50.2 was installed as a filter layer, and to prevent wash out of fine soils from beneath the mattress. The work along the 4,4 km of Sardaneta channel was divided into three sections, with three different contractors and Maccaferri supported the three sub-projects with technical assistance during the installation phase.

Download
the Success Story

LONGITUDINAL PROTECTION OF SARDANETA CANAL

Download
LONGITUDINAL PROTECTION OF SARDANETA CANAL

Our products for
this Success Story

Get in touch with us

If you agree with the company's Privacy Policy and understood its content, the Data Controller asks you if you consent to the processing in manner provided in the company's privacy policy for sending promotional communications of the services / activities provided by the Data Controller. *

Furthermore, the Data Controller asks you if you give your consent for the communication of your personal data to the Maccaferri Affiliates, and the consequent extra-EU transfer that may result, for their own purposes, including of a promotional nature (sending marketing communications) *